Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 4:3 — Multiply both parts by the lowest common denominator, 6: (2/3) × 6 = 4 and (1/2) × 6 = 3, giving the ratio 4 : 3, which is already in simplest form.
- (c) £4.00 — Find the cost of one pen: £6.40 ÷ 8 = £0.80. Then multiply by 5 pens: £0.80 × 5 = £4.00. Dividing £6.40 by 5 and multiplying by 8 gives £10.24 — that uses the ratio the wrong way round, scaling as if 5 pens were more expensive than 8. Stopping at £0.80 only gives the price of one pen. Multiplying the price of one pen by the difference in the number of pens, (8 − 5) × £0.80, gives £2.40 — the cost of the pens NOT bought, not the cost of the 5 pens bought. 5 pens cost £4.00.
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
- (d) 3/2 — The length of the blue ribbon goes on the top and the length of the red ribbon goes on the bottom, giving 45/30. Both parts divide by 15: 45 ÷ 15 = 3 on the top, and 30 ÷ 15 = 2 on the bottom. So the fraction is 3/2. It is greater than 1 because the blue ribbon is longer than the red one, and a fraction of one quantity compared with another is allowed to be top-heavy.
- (a) 20 litres per minute — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, and its units are the vertical unit for each one of the horizontal unit. Working: from (2, 50) to (6, 130) the volume changes by 130 − 50 = 80 litres and the time changes by 6 − 2 = 4 minutes, so the gradient is 80 ÷ 4 = 20, measured in litres for each minute. Answer: 20 litres per minute. The distractors: 25 litres per minute comes from using one point on its own, 50 ÷ 2, which assumes the line starts at the origin when the tank already held 50 litres at 2 minutes; 0.05 litres per minute comes from dividing the change in time by the change in volume, 4 ÷ 80, which gives the time for each litre but is then labelled as litres for each minute; 20 minutes for each litre has the right value with the units the wrong way round, and a tank that needed 20 minutes to gain a single litre would be filling far more slowly than this one.
- (b) 3.5 — Method: work out each percentage of its number separately, then subtract the smaller result from the larger one. Working: 45% of 70 = 31.5, and 35% of 80 = 28, so the difference is 31.5 − 28 = 3.5. Answer: 3.5. 11.5 comes from pairing the percentages with the wrong numbers, working out 35% of 70 = 24.5 and 45% of 80 = 36, and finding their difference. 59.5 comes from adding the two correct results, 31.5 + 28, instead of subtracting them. 10 comes from simply subtracting the two percentages themselves, 45 − 35, without applying them to the numbers at all.
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (d) 40 cm — Method: convert the real length to centimetres, then divide by the scale factor. Working: 10 m = 1000 cm. 1000 ÷ 25 = 40 cm. Wrong options: 0.4 cm comes from dividing 10 by 25 without converting metres to centimetres first; 25000 cm comes from multiplying instead of dividing (1000 × 25); 4 cm comes from converting 10 m to 100 cm (using ×10 instead of ×100) before dividing.
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (a) 135 minutes — Method: to change hours into minutes, multiply by 60. Working: 2.25 × 60 = 135 minutes. So the film runs for 135 minutes. Distractor 145 minutes comes from reading the '.25' as 25 minutes instead of a quarter of an hour, giving 2 hours 25 minutes. Distractor 225 minutes comes from multiplying by 100 instead of 60. Distractor 150 minutes comes from rounding 2.25 hours to 2.5 hours before converting.
Build your own mix at the worksheet builder.