Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 15 km/h — Speed = distance ÷ time, so 45 ÷ 3 = 15 km/h. Working out 45 × 3 = 135 multiplies distance and time together instead of dividing. Working out 45 + 3 = 48 and 45 − 3 = 42 both combine the two values by addition or subtraction, which does not give a speed at all. The cyclist's average speed is 15 km/h.
- (a) 3/8 — The whole prize fund is split into 3 + 5 = 8 equal parts. The smaller winner receives 3 of these parts, so their share is 3/8 of the whole fund. Taking the larger number of parts, 5, as the numerator instead gives 5/8, the larger winner's share. Writing the ratio numbers directly as a fraction without adding them, 3/5, treats the ratio as a fraction of the OTHER share rather than of the whole. Inverting the ratio gives 5/3, which is not even a valid fraction of a whole, since it is greater than 1.
- (a) 3/8, 41%, 0.43 — Method: convert every value to a decimal so they can be compared on the same scale, then order them. Working: 3/8 = 0.375, 41% = 0.41, and 0.43 stays as 0.43, so from smallest to largest the decimals are 0.375, 0.41, 0.43, giving the order 3/8, 41%, 0.43. Answer: 3/8, 41%, 0.43. The order 3/8, 0.43, 41% comes from comparing 0.43 and 41% as raw digits (43 versus 41) without converting 41% into the decimal 0.41 first, wrongly placing 0.43 before 41%. The order 0.43, 41%, 3/8 comes from placing the values in completely reversed order, from largest to smallest instead of smallest to largest. The order 41%, 0.43, 3/8 comes from ordering the values by their TYPE (percentage, then decimal, then fraction) rather than by their actual size.
- (c) £672 — Simple interest per year = 3% of £600 = £18. Over 4 years the interest is 18 × 4 = £72. Total in the account = £600 + £72 = £672. A student who gives just the interest, without adding it to the principal, writes £72. A student who adds only one year's interest instead of four gets £600 + £18 = £618. A student who wrongly compounds the interest each year gets 600 × 1.03⁴ = £675.31.
- (c) 40 minutes — Method: this is inverse proportion — fewer taps means longer, not shorter — so the number of taps × the time taken stays constant. Working: 6 × 20 = 120, and with 3 taps the time is 120 ÷ 3 = 40 minutes. So 3 taps take 40 minutes. Distractor 10 minutes comes from treating it as direct proportion instead of inverse, working out 20 × 3 ÷ 6. Distractor 30 minutes comes from halving the number of taps and adding half the original time, 20 + 10, instead of doubling the time. Distractor 17 minutes comes from subtracting the number of taps removed, 3, directly from the original time, 20.
- (c) 9% — Method: a percentage concentration is the ratio of salt to solution written per 100 g, so scale each concentration to the mass it belongs to, add the two masses of salt, then scale the ratio of salt to mixture back to a denominator of 100. Working: 5:100 = x:400 gives 5 ÷ 100 × 400 = 20 g of salt, and 25:100 = y:100 gives 25 g of salt; the mixture holds 20 + 25 = 45 g of salt in 400 + 100 = 500 g of solution; 45:500 = 9:100. Answer: 9%. The distractors: 15% is the mean of 5% and 25%, which would only be right if the two masses were equal, and here one is four times the other; 21% comes from attaching the concentrations to the wrong masses, working out (400 × 25% + 100 × 5%) ÷ 500; 0.9% comes from working out 45 ÷ 500 = 0.09 and then moving the decimal point one place instead of two when writing the decimal as a percentage.
- (a) 1:8 — Convert 2 kg to grams: 2 kg = 2000 g. The ratio is 250 : 2000. The highest common factor of 250 and 2000 is 250. Divide both parts by 250: 250 ÷ 250 = 1 and 2000 ÷ 250 = 8, so the ratio is 1 : 8. Leaving the kilograms unconverted gives 250 : 2, which simplifies to 125 : 1 — the units on each side are different, so this does not compare like with like. Dividing by 50 instead of 250 gives 5 : 40, which still shares a common factor of 5, so it is not fully simplified. Swapping the order gives 8 : 1, grams to kilograms the wrong way round.
- (c) 1.25 cm — Method: find the real length using the first map's scale, then use the second map's scale to find its drawn length. Working: real length = 5 × 20 000 = 100 000 cm. On the second map: 100 000 ÷ 80 000 = 1.25 cm. Wrong options: 20 cm comes from inverting the ratio of the two scales (5 × 80 000 ÷ 20 000); 5 cm comes from wrongly assuming the length looks the same on both maps; 12.5 cm comes from dropping a zero from the second scale factor and dividing by 8 000 instead of 80 000 (100 000 ÷ 8 000).
- (a) 1 : 2 000 000 — Method: a scale is a ratio between two lengths written in the same unit, reduced so that the map distance is 1. Working: 120 km = 120 × 1000 × 100 = 12 000 000 cm, so the ratio is 6 : 12 000 000, and dividing both parts by 6 gives 1 : 2 000 000. Answer: 1 : 2 000 000. The distractors: 1 : 12 000 000 comes from writing the real length in centimetres without dividing by the 6 cm on the map; 1 : 200 000 comes from taking 120 km as 1 200 000 cm, one conversion step short, before dividing by 6; 1 : 20 000 comes from converting 120 km to 120 000 m and treating those metres as centimetres.
- (d) 7/3 — The film's length is being described, so it goes on the top, and the documentary's length goes on the bottom: 105/45. The highest common factor of 105 and 45 is 15, so divide both parts by it: 105 ÷ 15 = 7 and 45 ÷ 15 = 3. The fraction is 7/3. Because the film is longer than the documentary the fraction is greater than 1, which is exactly what a top-heavy fraction records.
- (d) 1:4 — Convert 1.4 l to millilitres: 1.4 l = 1400 ml. The ratio is 350 : 1400. Divide both parts by 350: 350 ÷ 350 = 1 and 1400 ÷ 350 = 4, giving 1 : 4. Misreading 1.4 l as 14 (moving the decimal point) gives 350 : 14, which simplifies to 25 : 1 — a very different, implausible ratio. Dividing by 175 instead of 350 gives 2 : 8, which still shares a common factor of 2, so it is not fully simplified. Swapping the order gives 4 : 1, litres to millilitres the wrong way round.
- (d) y = 3x/4 — y : x = 3 : 4 means y/x = 3/4. Rearranging to make y the subject gives y = (3/4)x = 3x/4. A student who mixes up which quantity goes on top gets y = 4x/3. A student who treats the ratio numbers as the coefficient and constant of a linear equation instead of a proportional relationship gets y = 3x + 4. A student who mistakes the relationship for inverse proportion gets y = 3/(4x).
- (a) 50 — Method: 25% is one quarter, so 25% of a quantity is the quantity divided by 4. Working: 200 ÷ 4 = 50. Answer: 50. The distractors: 25 comes from writing the percentage itself as the answer; 100 comes from halving, which is 50% not 25%; 800 comes from multiplying by 4 instead of dividing.
- (a) 150 g — Method: scale the recipe to find the total sugar needed, then subtract the sugar Sam already has. Working: 200 ÷ 8 × 20 = 500, so 500 g is needed in total; 500 − 350 = 150, so 150 g still to buy. Stopping after finding the total, 500, without subtracting what he has gives 500 g. Scaling the wrong way round, 200 × 8 ÷ 20 = 80, wrongly suggests he already has enough, giving 0 g. Adding the amount he has instead of subtracting it, 500 + 350 = 850, gives 850 g.
- (c) 5 hours — Method: measure the job in decorator-hours, which is in the same ratio as the number of rooms, then share the decorator-hours between the decorators available. Working: 5 decorators × 6 hours = 30 decorator-hours for 3 rooms, so one room takes 30 ÷ 3 = 10 decorator-hours; 5 rooms take 5 × 10 = 50 decorator-hours; shared between 10 decorators that is 50 ÷ 10 = 5 hours. Answer: 5 hours. The distractors: 3 hours comes from halving the 6 hours because the number of decorators doubles, while forgetting that there are also more rooms to paint; 10 hours comes from scaling the 6 hours up for the rooms only, 6 × 5 ÷ 3, and leaving the workforce at 5 decorators; 6 hours comes from assuming that doubling the decorators and increasing the rooms cancel each other out, which they do not, because the rooms rise by a factor of 5/3 and the workforce by a factor of 2.
Build your own mix at the worksheet builder.