Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) 50 — Method: 25% is one quarter, so 25% of a quantity is the quantity divided by 4. Working: 200 ÷ 4 = 50. Answer: 50. The distractors: 25 comes from writing the percentage itself as the answer; 100 comes from halving, which is 50% not 25%; 800 comes from multiplying by 4 instead of dividing.
- (c) 40 minutes — Method: this is inverse proportion — fewer taps means longer, not shorter — so the number of taps × the time taken stays constant. Working: 6 × 20 = 120, and with 3 taps the time is 120 ÷ 3 = 40 minutes. So 3 taps take 40 minutes. Distractor 10 minutes comes from treating it as direct proportion instead of inverse, working out 20 × 3 ÷ 6. Distractor 30 minutes comes from halving the number of taps and adding half the original time, 20 + 10, instead of doubling the time. Distractor 17 minutes comes from subtracting the number of taps removed, 3, directly from the original time, 20.
- (d) 4/3 — The amount of yellow paint is 0.75 times the amount of blue paint. As a fraction, 0.75 = 3/4, so yellow = 3/4 of blue. To write blue as a fraction of yellow, use the reciprocal: flip 3/4 to get 4/3. 3/4 comes from keeping the original fraction without inverting it. 1/4 comes from computing 1 − 3/4 = 1/4, which is not how a fraction reverses. 40/3 comes from converting 0.75 to a fraction as 75/1000 = 3/40 (misplacing the decimal point), then inverting that.
- (d) 24 — Method: split 60 into 3 + 7 = 10 equal parts, find the value of one part, then use the difference in ratio parts. Working: 60 ÷ 10 = 6, so the numbers are 3 × 6 = 18 and 7 × 6 = 42, and their difference is 42 − 18 = 24. Answer: 24. 4 comes from finding the difference between the ratio numbers, 7 − 3, but forgetting to multiply by the value of one part. 60 comes from adding the two numbers back together instead of subtracting, which just repeats the given sum. 80 comes from dividing 60 by the first ratio number, 3, instead of by the total number of parts, 10, giving a part value of 20 and a difference of 7 × 20 − 3 × 20 = 80.
- (c) 30 — Method: use y = kx and find k from the given pair of values, then substitute x = 12. Working: k = 20 ÷ 8 = 2.5, so y = 2.5 × 12 = 30. Answer: 30. 24 comes from treating the relationship as additive, adding the increase in x (12 − 8 = 4) straight onto y (20 + 4 = 24), instead of multiplying by k. 14.5 comes from finding k correctly (2.5) but then adding it to x instead of multiplying (12 + 2.5 = 14.5). 4.8 comes from finding k upside down, 8 ÷ 20 = 0.4, and multiplying by x: 12 × 0.4 = 4.8.
- (d) 13/10 — First find the selling price: £150 + £45 = £195. Put the selling price over the cost price: 195/150. Divide both numbers by their highest common factor, 15: 195÷15 = 13, 150÷15 = 10, giving 13/10. (10/13 comes from writing the prices the wrong way round. 3/10 is just the profit written as a fraction of the cost price, 45/150, not the selling price. 13/23 comes from comparing the selling price to the combined total of the cost price and the selling price, 195/345.)
- (c) 920 kg/m³ — Convert each unit in turn. Mass: 1 g = 0.001 kg. Volume: 1 m³ = 100 × 100 × 100 = 1 000 000 cm³. So a density of 0.92 g per cm³ is 0.92 × 1 000 000 = 920 000 g in every cubic metre, and 920 000 g = 920 000 × 0.001 = 920 kg. The two conversions leave a single factor of 1 000 000 × 0.001 = 1000, so in one step multiply g/cm³ by 1000: 0.92 × 1000 = 920 kg/m³. Multiplying by 100 instead of 1000 gives 92 kg/m³, using the factor for 1 m² rather than 1 m³ of volume. Multiplying by 10 instead of 1000 gives 9.2 kg/m³, moving the decimal point one place for a conversion that moves it three. Dividing by 1000 instead of multiplying gives 0.00092 kg/m³, going the wrong way between the units — a kilogram is heavier than a gram, but a cubic metre is a million times bigger than a cubic centimetre, so the number must get larger, not smaller. The liquid's density is 920 kg/m³.
- (d) The candle's height decreases by 0.3 cm every minute. — A negative gradient means the quantity on the vertical axis decreases as the quantity on the horizontal axis increases. The size of the gradient, 0.3, gives the amount of decrease per minute.
- (b) 8 — The gradient of a line through the origin is the y-value divided by the x-value at any point on the line. Using (10, 80): gradient = 80 ÷ 10 = 8.
- (d) £200 — Method: add the parts of the ratio, divide the total paid by the number of parts to find the value of one part, then multiply by the parts in the most expensive item. Working: 2 + 3 + 5 = 10 parts, £400 ÷ 10 = £40 for one part, and the most expensive item is 5 parts, so 5 × £40 = £200. Answer: £200. The distractors: £40 is the value of one part; £80 is the 2-part item, the cheapest of the three; £120 is the 3-part item.
- (a) 4 days — Method: the fence is a fixed amount of work, so builders × days is constant; find that product and divide it by the new number of builders. Working: 3 × 12 = 36 builder-days of work, so with 9 builders the time is 36 ÷ 9 = 4 days. Answer: 4 days. The distractors: 6 days comes from halving the 12 days because there are more builders, rather than dividing by the factor of 3 by which the workforce has grown; 36 days is the constant product of builders and days, given as a number of days instead of being shared between the builders; 9 days comes from taking 3 days off the 12, treating three extra builders as three fewer days, which is additive rather than proportional.
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (b) −1% — Method: write each change as a multiplier and multiply them. A 10% fall is × 0.9 and a 10% rise is × 1.1. Working: 0.9 × 1.1 = 0.99, so the final price is 99% of the original, which is 1% less. Answer: an overall change of −1%. The distractors: 0% comes from assuming a 10% fall and a 10% rise cancel — they do not, because the rise is 10% of a smaller amount; +1% has the size right but the sign wrong, from reading the multiplier 0.99 as 1% above 1 instead of 1% below it; −2% comes from finding the 1% fall and then counting it once for each of the two changes.
Build your own mix at the worksheet builder.