Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (c) 2:3 — Divide both parts of the ratio by their highest common factor, 2x: 4x ÷ 2x = 2 and 6x ÷ 2x = 3, giving 2 : 3. Writing 4 : 6 has not been simplified at all. Writing 2x : 3x has cancelled the common factor of 2 but left the x in, so it is not written as a ratio of whole numbers. Writing 3 : 2 has the two parts the wrong way round.
- (c) 3 — Method: find the height scale factor, cube it to find the volume (and coverage) scale factor, use it to find one large sack's coverage, then divide the total lawn area by this and round up to a whole number of sacks. Working: height scale factor = 40 ÷ 20 = 2, so coverage scale factor = 2³ = 8, and each large sack covers 30 × 8 = 240 m². 500 ÷ 240 = 2.08…, which rounds UP to 3 whole sacks. Answer: 3. 2 comes from correctly finding that each large sack covers 240 m², but then rounding 500 ÷ 240 down instead of up, which would leave part of the lawn untreated. 5 comes from squaring the height scale factor (2² = 4) instead of cubing it, giving a coverage of only 30 × 4 = 120 m² per sack. 17 comes from forgetting to scale the coverage at all and dividing 500 by the smaller sack's coverage of 30 m².
- (b) 460 — To increase by 15%, multiply by 1.15 (100% + 15%). 400 × 1.15 = 460. 60 comes from working out only the increase, 400 × 0.15 = 60, and forgetting to add it to the original number. 415 comes from adding 15 directly to 400 instead of 15% of 400. 340 comes from multiplying by 0.85, decreasing instead of increasing: 400 × 0.85 = 340.
- (d) 3/2 — The length of the blue ribbon goes on the top and the length of the red ribbon goes on the bottom, giving 45/30. Both parts divide by 15: 45 ÷ 15 = 3 on the top, and 30 ÷ 15 = 2 on the bottom. So the fraction is 3/2. It is greater than 1 because the blue ribbon is longer than the red one, and a fraction of one quantity compared with another is allowed to be top-heavy.
- (c) 9:15:21 — 6 : 10 : 14 simplifies to 3 : 5 : 7 (divide every part by 2). Multiplying every part of 3 : 5 : 7 by 3 gives 9 : 15 : 21, so 9 : 15 : 21 is equivalent to 6 : 10 : 14. Adding 2 to every part of 6 : 10 : 14 gives 8 : 12 : 16, which is not equivalent — ratios are equivalent when every part is multiplied by the same number, not when the same number is added to every part. Doubling only the first two parts, 6 × 2 = 12 and 10 × 2 = 20, but leaving the third part unchanged at 14, gives 12 : 20 : 14 — a scaling applied to two parts and not the third. Cancelling the first two parts correctly, 6 ÷ 2 = 3 and 10 ÷ 2 = 5, then treating the three numbers as a sequence and making the third part the sum of the first two, 3 + 5 = 8, gives 3 : 5 : 8 — the third part was never divided by 2 at all.
- (c) £480.00 — To decrease by 20%, multiply by 0.80 (100% − 20%). £600 × 0.80 = £480.00. £120.00 comes from working out only the decrease (£600 × 0.20) and forgetting to subtract it from the original value. £580.00 comes from subtracting 20 directly instead of 20% of £600. £720.00 comes from multiplying by 1.20, adding the percentage instead of subtracting it.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (a) 3/2 — Find each average speed: car = 180 ÷ 3 = 60 mph; lorry = 160 ÷ 4 = 40 mph. Put the car's speed over the lorry's speed: 60/40. Divide both numbers by their highest common factor, 20: 60÷20 = 3, 40÷20 = 2, giving 3/2. (2/3 comes from writing the speeds the wrong way round. 9/8 comes from comparing the distances travelled, 180/160, without working out the speeds. 3/4 comes from comparing the times taken, 3/4, instead of the speeds.)
- (c) 15 — Method: the number of cakes is in direct proportion to the mass of flour, so find the multiplier between the two masses and apply it to the number of cakes. Working: 6 ÷ 2 = 3, so there is three times as much flour, and 5 × 3 = 15. Answer: 15. The distractors: 10 comes from multiplying the 5 cakes by 2, the mass in the recipe, instead of by the multiplier 3; 20 comes from multiplying by the difference 6 − 2 = 4, treating a proportion problem as a difference problem; 12 comes from rounding 5 ÷ 2 down to 2 cakes per kilogram and working out 6 × 2.
- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (c) £22.50 — Method: find the cost of 1 kg, then multiply by the mass wanted. Working: £36 ÷ 2.4 = £15 per kilogram, and 1.5 × £15 = £22.50. Answer: £22.50. The distractors: £15 is the price of 1 kg, which is the first step and not what the question asks for; £54 comes from multiplying the £36 by 1.5 without first reducing it to a price per kilogram; £57.60 comes from using the scale factor upside down, multiplying £36 by 2.4 ÷ 1.5 = 1.6 instead of by 1.5 ÷ 2.4.
- (a) x = 6, y = 27 — Method: for direct proportion, y = kx, so k = y ÷ x. Working: k = 9 ÷ 2 = 4.5. At x = 6: y = 4.5 × 6 = 27. Wrong options: x = 6, y = 13 comes from adding the change in x (4) onto y instead of scaling by k; x = 6, y = 3 comes from treating the relationship as inverse proportion (k = 2 × 9 = 18, then y = 18 ÷ 6 = 3); x = 6, y = 24 comes from rounding the constant of proportionality down to 4 instead of using 4.5.
- (c) 14 litres — Method: find the amount of fuel used per km first, then use it to find the fuel needed for 175 km. Working: 24 ÷ 300 = 0.08 litres per km, and 0.08 × 175 = 14 litres. So 14 litres are needed. Distractor 24 litres comes from assuming the same amount of fuel is used no matter the distance, without scaling. Distractor 21 litres comes from misreading the original distance as 200 km instead of 300 km. Distractor 1.4 litres comes from a decimal-point slip, giving an answer ten times too small.
- (a) 1.3 — The gradient of a distance-time graph gives the speed. Difference in speed = 4.5 − 3.2 = 1.3 km/h. A student who subtracts the speeds the wrong way round, 3.2 − 4.5, gets −1.3. A student who adds the two speeds instead of comparing them gets 7.7. A student who multiplies the two gradients gets 14.4.
- (d) 1 : 2500 — Method: convert the real-world measurement to the same unit as the drawing (centimetres) before writing the ratio. Working: 25 m = 2500 cm, so the scale is 1 : 2500. Wrong options: 1 : 25 comes from not converting metres to centimetres at all; 1 : 250 comes from converting metres to centimetres using ×10 instead of ×100; 1 : 2.5 comes from converting in the wrong direction (treating 25 m as 2.5 cm).
Build your own mix at the worksheet builder.