Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 60 — Method: 75% is three quarters, so divide by 4 to find one quarter and then multiply by 3. Working: 80 ÷ 4 = 20 for one quarter, and 3 × 20 = 60. Answer: 60 milk chocolates. The distractors: 20 is one quarter of 80, which is 25% and not 75%; 55 comes from subtracting 25 from 80 rather than taking 25% of 80 away from it; 75 comes from quoting the percentage itself as a number of chocolates.
- (b) 8 — The gradient of a line through the origin is the y-value divided by the x-value at any point on the line. Using (10, 80): gradient = 80 ÷ 10 = 8.
- (b) 1500 — The rate is 3 ÷ 2 = 1.5 litres per minute. Converting to cm³: 1.5 × 1000 = 1500 cm³ per minute. Getting 3000 comes from converting 3 litres to cm³ first (3000 cm³) and forgetting to divide by the 2 minutes. Getting 750 comes from dividing by the 2 minutes a second time after converting (1500 ÷ 2). Getting 2000 comes from converting the 2 minutes as if it were litres (2 × 1000) instead of using the correct rate of 1.5 litres per minute.
- (c) 30 — Method: use y = kx and find k from the given pair of values, then substitute x = 12. Working: k = 20 ÷ 8 = 2.5, so y = 2.5 × 12 = 30. Answer: 30. 24 comes from treating the relationship as additive, adding the increase in x (12 − 8 = 4) straight onto y (20 + 4 = 24), instead of multiplying by k. 14.5 comes from finding k correctly (2.5) but then adding it to x instead of multiplying (12 + 2.5 = 14.5). 4.8 comes from finding k upside down, 8 ÷ 20 = 0.4, and multiplying by x: 12 × 0.4 = 4.8.
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
- (a) 3 hours — Method: for a fixed pool the rate of flow multiplied by the time taken is constant, so multiplying the rate by a factor divides the time by that same factor. Working: tap B's rate is 2 times tap A's rate, so tap B's time is 6 ÷ 2 = 3 hours. Answer: 3 hours. The distractors: 12 hours comes from multiplying the time by 2 as well, which treats the time as directly proportional to the rate and has the faster tap taking longer; 4 hours comes from reading ‘twice as fast’ additively, as two hours quicker, and working out 6 − 2 instead of scaling the time by a factor of 2; 1.5 hours comes from applying the factor of 2 twice, halving 6 to 3 and then halving again.
- (b) 20 — The gradient is the change in p divided by the change in t: (90 − 30) ÷ (5 − 2) = 60 ÷ 3 = 20. Choosing 0.05 comes from dividing the change in t by the change in p, the wrong way round (3 ÷ 60). Choosing −20 comes from subtracting the coordinates in the wrong order for one part of the calculation, for example (30 − 90) ÷ (5 − 2), giving a negative value. Choosing 18 comes from dividing the second p-coordinate by the second t-coordinate directly (90 ÷ 5) instead of using the change between the two points.
- (d) y = 3x/4 — y : x = 3 : 4 means y/x = 3/4. Rearranging to make y the subject gives y = (3/4)x = 3x/4. A student who mixes up which quantity goes on top gets y = 4x/3. A student who treats the ratio numbers as the coefficient and constant of a linear equation instead of a proportional relationship gets y = 3x + 4. A student who mistakes the relationship for inverse proportion gets y = 3/(4x).
- (b) £52,000 — Method: convert 130% to a decimal multiplier and multiply it by last year's profit. Working: 130% = 1.3, so this year's profit is £40,000 × 1.3 = £52,000. Answer: £52,000. £12,000 comes from using only the extra 30% (130% − 100%) and forgetting to include the original 100%, £40,000 × 0.3 = £12,000. £40,130 comes from simply adding 130 onto £40,000, treating the percentage as an amount of money rather than a multiplier. £5,200 comes from misreading 130% as 13%, giving £40,000 × 0.13 = £5,200.
- (a) 0.8 — The gradient of a line through the origin is the y-coordinate of a point divided by its x-coordinate: 20 ÷ 25 = 0.8. Choosing 1.25 comes from dividing the wrong way round, 25 ÷ 20. Choosing 20 comes from reading off the cost at the point instead of dividing it by the number of miles. Choosing 5 comes from subtracting the two coordinates (25 − 20) instead of dividing them.
- (d) 1/4 — Method: work out both amounts first, then put the amount named before the word 'of' on top and the amount named after it on the bottom. Working: there are 4 × 5 = 20 apples, so the fraction is 5/20; dividing the numerator and the denominator by 5 gives 1/4. Answer: 1/4. The distractors: 4/1 comes from quoting the multiplier given in the question, which compares the apples with the pears rather than the pears with the apples; 4/5 comes from writing the 20 apples over the 25 fruits altogether, 20/25, a part-to-whole fraction; 5/9 comes from reading '4 times as many' as '4 more than', giving 5 + 4 = 9 apples and the fraction 5/9.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (a) 135 km — Method: find the distance travelled on one litre, then scale up to 9 litres. Working: 90 ÷ 6 = 15 km per litre, so 15 × 9 = 135 km. Answer: 135 km. 45 km comes from working out the extra distance for the extra 3 litres (15 × 3) but forgetting to add the original 90 km. 60 km comes from using the ratio the wrong way round, 90 × 6 ÷ 9, instead of finding the rate per litre first. 99 km comes from simply adding the number of litres, 9, onto the original distance, 90, instead of scaling the whole journey.
- (a) 4 — The length scale factor, cubed, gives the volume scale factor: L³ = 64, so L = the cube root of 64 = 4, since 4 × 4 × 4 = 64. 64 comes from using the volume scale factor itself as the length scale factor, without taking a root at all. 8 comes from taking the square root of 64 instead of the cube root — that would be the correct root for an area scale factor, not a volume one. 32 comes from halving the volume scale factor (64 ÷ 2), instead of cube-rooting it.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
Build your own mix at the worksheet builder.