Printable · GCSE Foundation · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Foundation
Fifteen questions across the ratio, proportion and rates of change statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A film runs for 2.25 hours. Work out the length of the film in minutes.
- 2.Isla says that the ratio 4:6 is equivalent to the ratio 6:9. Is she correct? Give a reason for your answer.
- 3.5 tins of soup cost £8 in total. Work out the multiplier that changes the number of tins into the total cost in pounds.
- 4.A cyclist rides 30 km in 1 hour 30 minutes. Work out the average speed of the cyclist in km/h.
- 5.Simplify the ratio 45 : 30 : 75 to its simplest form.
- 6.A journey takes 4 hours at an average speed of 60 km/h. The time taken is inversely proportional to the average speed. Work out how long the same journey takes at an average speed of 80 km/h.
- 7.In a class, 50% of the students study French, 30% study Spanish and the rest study German. Write down the ratio of French : Spanish : German students, in its simplest form.
- 8.A rectangle has its height and its width in the ratio 3:2. The height of the rectangle is 18 cm. Work out the width of the rectangle.
- 9.5 decorators paint 3 rooms in 6 hours. All the decorators work at the same rate. Work out how long it takes 10 decorators to paint 5 rooms.
- 10.Write 75p : £1.50 as a ratio of whole numbers in its simplest form.
- 11.A plumber's charge, C pounds, for a job lasting h hours is shown on a straight-line graph. The line passes through the points (1, 45) and (3, 85). Work out what the gradient of this line represents, in context.
- 12.A shop sells identical pens. The total cost, C pence, of n pens is given by C = 12n. Write the ratio n : C in its simplest form.
- 13.Which of these ratios is equivalent to 2:3?
- 14.A worker is paid £13.20 per hour. Work out this rate of pay in pence per minute.
- 15.3 builders put up a fence in 12 days. All the builders work at the same rate, so the number of days is inversely proportional to the number of builders. Work out how long 9 builders take to put up the same fence.
Build your own mix at the worksheet builder.