Printable · GCSE Foundation · ages 14-16
Statistics worksheet — GCSE Foundation
Fifteen questions across the statistics statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Statistics worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- 1.A scatter graph shows the number of days, x, that each of 16 tomato plants was watered and its height, y cm. The line of best fit has equation y = 1.5x + 4. Write down what the 1.5 in this equation tells you about the plants.y = 1.5x + 4
- 2.A timetable shows the departure times of a bus from Leeds to Harrogate: 08:15, 08:50, 09:25, 10:05, 10:40. Chloe arrives at the bus stop at 09:30. Work out how many minutes she has to wait for the next bus.
- 3.A teacher records the number of pets owned by each of 25 pupils in a class; each pupil owns 0, 1, 2, 3 or 4 pets. The teacher wants to show how many pupils own each number of pets. Write down the most suitable type of chart for this data, and give a reason for your answer.
- 4.Write down what a scatter graph is used to show.
- 5.A council wants to find out what all residents of a town think about a new cycle lane. It posts a survey only on its website and asks people to fill it in online. Give a reason why this sample is likely to be biased.
- 6.A factory makes a batch of 4,000 circuit boards. It checks a random sample of 50 boards and finds that 4 are faulty. The factory will scrap the whole batch if the estimated number of faulty boards in the batch is more than 250. Should the factory scrap the batch?
- 7.The mean mass of four parcels is 17 kg. Three of the parcels have masses 12 kg, 16 kg and 18 kg. Work out the mass of the fourth parcel.
- 8.A scatter graph of taxi journeys in Bristol shows the distance, x miles, and the fare, y pounds. The line of best fit is y = 2x + 3.50. Work out the estimated fare for a journey of 6 miles, using the line of best fit.y = 2x + 3.5
- 9.A charity shop in Leicester made £2,400 in one month. A pie chart shows how this was spent: repairs took up an angle of 90°, wages took up an angle of 150°, and the rest was other costs. Work out how much was spent on wages.
- 10.Four pairs of variables are listed below. Write down the pair that you would expect to show no correlation.
- 11.In a scatter graph of the age, in years, and the wingspan, in cm, of 20 birds of the same species, all the points lie close to a rising line of best fit except one, which lies a long way below the line. That bird was later found to have a damaged wing. Give a reason why this point should not be used when drawing the line of best fit.
- 12.A sports club has 300 women members and 200 men members, 500 members in total. The club committee wants to choose a sample of 40 members that is in proportion to the club's membership. Work out how many women should be in the sample.
- 13.On a scatter graph the horizontal axis shows height in centimetres and the vertical axis shows mass in kilograms. One point is plotted at (170, 65). Write down the height and the mass of that person.
- 14.A sports centre in Newcastle asks 60 members which activity they prefer: swimming 15 members, football 25 members, badminton 12 members and other activities 8 members. Work out the angle at the centre of the pie chart sector that represents badminton.
- 15.A scatter graph shows the mass, x kg, of a parcel and the cost, y pounds, of posting it. The line of best fit is y = 1.5x + 2. Work out the estimated cost of posting a parcel with a mass of 6 kg, using the line of best fit.y = 1.5x + 2
Answer key
- (b) On average a plant grew 1.5 cm taller for each extra day — Method: in the equation of a line, the number multiplying x is the gradient, and a gradient states the change in y produced by an increase of 1 in x, read in the units of the two axes. Working: here x is measured in days and y in centimetres, so the gradient 1.5 carries the units centimetres per day. Testing it on the line, 5 days gives 1.5 × 5 + 4 = 11.5 cm and 6 days gives 1.5 × 6 + 4 = 13 cm, a rise of 1.5 cm for the one extra day. Answer: on average a plant grew 1.5 cm taller for each extra day of watering. The distractors: 1.5 cm as the height before any watering is the value of y when x is 0, which is the other number in the equation, 4 cm, so this swaps the gradient and the intercept; 1.5 cm as the gap between the tallest and the shortest plant reads the gradient as a range, when a range is a difference between two of the 16 plants and a gradient is a rate; 1.5 days for each extra centimetre inverts the rate, dividing days by centimetres instead of centimetres by days, and the line gives 1 cm of growth in two thirds of a day.
- (a) 35 minutes — Chloe arrives at 09:30, so she needs the first departure time that is at or after 09:30. The bus at 09:25 has already left five minutes before she arrives, so it is missed, not caught; the next one on the timetable is 10:05. From 09:30 to 10:00 is 30 minutes, then a further 5 minutes to 10:05, so the wait is 35 minutes. Giving 40 minutes measures the gap from the missed 09:25 bus to the 10:05 bus, counting from the bus Chloe missed instead of from the time she arrived. Giving 5 minutes uses the missed 09:25 bus, working out 09:30 − 09:25 the wrong way round. Giving 45 minutes comes from treating the times as decimals — 10.05 − 9.30 = 0.75, then × 60 = 45 — instead of working in hours and minutes, where 05 minutes past the hour is not 0.05 of an hour.
- (a) A vertical line chart (discrete numerical data) — The number of pets is discrete numerical data — whole-number values such as 0, 1, 2, 3 or 4 — recorded for one variable, so a vertical line chart is the chart specified for this kind of data. A bar chart is used for categorical data, such as favourite colour, not numerical values counted like this. A pie chart shows proportions of a whole and does not show the frequency of each separate value. A scatter graph compares two different variables against each other, and only one variable, the number of pets, is recorded here.
- (a) The relationship between two variables — Method: what a diagram shows is decided by what has to be known before a single mark can be plotted on it. Working: every point on a scatter graph is plotted from a pair of measurements taken from the same person or object, one read on the horizontal axis and one on the vertical axis; having two measurements for each point is what makes it possible to look for a pattern between them, and the pattern between two variables is what the graph displays. Answer: a scatter graph shows the relationship between two variables. The distractors: the frequency of each single value is what a bar chart or a vertical line chart shows, and it needs only one list of values; how a total is shared between categories is what a pie chart shows; how one quantity changes over time is what a time series line graph shows, in which one of the two axes is always time.
- (d) Only internet users reach the website; others are excluded. — Method: a sample is biased when it systematically leaves out part of the population, or systematically over-represents another part. Working: anyone without internet access, or who does not visit the council's website, has NO chance of being included — the sample is drawn only from internet-using residents, which is not the whole town. Saying too many people might respond because the survey is free confuses bias with sample size — bias is about who CAN be reached, not how many respond. Saying people might lie describes a different problem, response honesty, not who was sampled in the first place. Saying online surveys cannot be anonymous is not a reason connected to bias at all. A sample is biased when part of the population has no chance of being included, whatever the reason for that.
- (c) Yes — with an estimate of 320, above the 250 limit. — Method: scale the sample proportion up to the whole batch to get an estimate, then compare that estimate with the 250 limit to reach a decision. Working: in the sample, 4 out of 50 boards are faulty, a proportion of 4 ÷ 50 = 0.08. Applying that proportion to the batch of 4,000 gives an estimate of 0.08 × 4000 = 320 faulty boards. Since 320 is more than 250, the factory should scrap the batch. Inverting the proportion, 50 ÷ 4 = 12.5, and treating that as a percentage of the batch, 12.5% × 4000 = 500, still gives 'yes' but from the wrong fraction, so it overstates the estimate. Comparing the raw number of faulty boards found in the sample, 4, directly with the 250 limit skips the scaling up to the batch altogether, and 4 is nowhere near 250, so that route wrongly says 'no'. Dividing the batch by the sample size, 4000 ÷ 50 = 80, finds how many samples of 50 fit into the batch but stops before multiplying by the 4 faulty boards found, so it also wrongly says 'no'. Always find the proportion in the sample first, scale it up to the whole batch, and only then compare the estimate with the limit given.
- (c) 22 kg — Method: multiply the mean by the number of parcels to rebuild the total mass, then subtract the masses that are known. Working: four parcels with a mean mass of 17 kg have a total mass of 17 × 4 = 68 kg; the three known parcels total 12 + 16 + 18 = 46 kg; so the fourth parcel has mass 68 − 46 = 22 kg. Answer: 22 kg. The distractors: 68 kg comes from stopping at the total mass of all four parcels; 17 kg comes from assuming the missing parcel must have the mean mass; 5 kg comes from multiplying the mean by 3, the number of parcels whose mass is given, leaving 51 − 46 = 5.
- (d) £15.50 — 2 × 6 = 12, and 12 + 3.50 = 15.50, so the estimated fare is £15.50. Choosing £12.00 stops after 2 × 6 = 12 and forgets to add the £3.50. Choosing £19.00 adds the distance and the constant first and then multiplies: 6 + 3.50 = 9.50, and 9.50 × 2 = 19.00, applying the ×2 to the whole sum instead of only to the distance. Choosing £13.00 multiplies only the constant term by 2 instead of the distance: 2 × 3.50 = 7, and 7 + 6 = 13.00.
- (b) £1,000 — Wages take up 150° out of 360°, so the amount spent on wages is 150 ÷ 360 × 2400 = £1,000. Choosing £600 uses the repairs angle, 90°, instead of the wages angle: 90 ÷ 360 × 2400 = 600. Choosing £3,600 treats the angle in degrees as if it were a percentage, 150 ÷ 100 × 2400 = 3600, instead of dividing by 360°. Choosing £800 uses the angle for the 'other costs' sector, 360 − 90 − 150 = 120°, instead of the wages sector: 120 ÷ 360 × 2400 = 800.
- (b) A person's shoe size and their favourite colour — A person's shoe size is not linked to which colour they prefer, so these two show no correlation. The other three pairs are all genuinely correlated: distance travelled and fuel used rise together, which is positive correlation; hours of revision and test score generally rise together, which is also positive correlation; and as outdoor temperature rises, fewer woolly hats are sold, which is negative correlation. Negative correlation is still a real relationship between two variables — it is not the same thing as no relationship at all, so the temperature and hats pair is not the answer to this question.
- (d) An outlier from the damaged wing, not the trend. — That bird's point lies a long way from the rising trend followed by every other bird, and its low wingspan is explained by the damaged wing rather than by its age — it is an outlier caused by an unusual factor, not part of the general relationship between age and wingspan, so it should not be used when drawing the line of best fit. Saying every point must be used ignores that an outlier caused by a separate, identifiable factor can rightly be set aside. Saying it shows no correlation ignores that the other 19 points do show a clear rising trend; one outlier does not remove that. Saying it proves the line is inaccurate confuses one unusual bird with a fault in the line itself, when the line correctly describes the trend followed by the rest of the data.
- (d) 24 — Method: for a sample in proportion to the population, apply the same fraction that each group makes up of the whole population to the size of the sample. Working: women make up 300 out of the 500 members, a fraction of 300 ÷ 500 = 0.6. Applying that fraction to the sample of 40 gives 0.6 × 40 = 24 women. Splitting the sample evenly, 40 ÷ 2 = 20, ignores that the club has more women than men and treats the two groups as equal in size, which they are not. Misreading the sample size as 50 instead of 40, then applying the 3:2 ratio of women to men, 3 ÷ 5 × 50 = 30, uses the right ratio but the wrong sample total. Working out the number of MEN instead of women, 200 ÷ 500 × 40 = 16, answers a different question — how many men, not how many women, belong in the sample. Always apply each group's own share of the population to the sample size, and check which group the question is actually asking about.
- (c) Height 170 cm, mass 65 kg — Method: a point on a scatter graph is written as a pair of coordinates in which the horizontal value is written first and the vertical value second, so each value is matched to the quantity named on its own axis. Working: in (170, 65) the value 170 is the horizontal coordinate and the horizontal axis shows height in centimetres, so the height is 170 cm; the value 65 is the vertical coordinate and the vertical axis shows mass in kilograms, so the mass is 65 kg. Answer: height 170 cm, mass 65 kg, each with the unit named on its own axis. The distractors: height 65 cm and mass 170 kg come from reading the pair the wrong way round, which would describe an impossible person; height 170 cm and mass 170 kg come from reading the horizontal coordinate for both quantities and never using the second number; height 235 cm and mass 105 kg come from combining the two coordinates, 170 + 65 and 170 − 65, instead of reading them separately.
- (c) 72° — The angle is 12 ÷ 60 × 360 = 72°. Choosing 150° divides football's frequency of 25 instead of badminton's 12: 25 ÷ 60 × 360 = 150. Choosing 20° finds badminton as a percentage of the members, 12 ÷ 60 × 100 = 20, rather than an angle in degrees. Choosing 90° uses 48, the total of the other three activities, as the total instead of the full 60 members: 12 ÷ 48 × 360 = 90.
- (b) £11.00 — 1.5 × 6 = 9, and 9 + 2 = 11, so the estimated cost is £11.00. Choosing £9.00 stops after 1.5 × 6 = 9 and forgets to add the £2. Choosing £12.00 adds the mass and the constant first and then multiplies: 6 + 2 = 8, and 8 × 1.5 = 12.00. Choosing £13.50 swaps the gradient and the intercept, using y = 2x + 1.5 instead: 2 × 6 = 12, and 12 + 1.5 = 13.50.
Build your own mix at the worksheet builder.