Printable · GCSE Foundation · ages 14-16
Statistics worksheet — GCSE Foundation
Fifteen questions across the statistics statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Statistics worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (b) Positive correlation — Method: the type of correlation is named from the direction the points take as the scatter graph is read from left to right. Working: the points rise from left to right, so as the arm span read on the horizontal axis increases, the height read on the vertical axis increases as well; two quantities that increase together show positive correlation. Answer: positive correlation. The distractors: negative correlation comes from naming the direction the wrong way round, since a negative correlation needs the points to fall as the graph is read from left to right; no correlation comes from treating points that are spread out rather than sitting exactly on a line as though they showed no relationship; direct proportion comes from confusing a rising trend with proportion, which would additionally need the line through the points to pass through the origin and would mean doubling one quantity doubles the other.
- (a) No correlation — Shoe size has no real relationship with spelling ability, and the points here are scattered with no rising or falling trend, so this is no correlation. A positive correlation would show the points rising together, and a negative correlation would show them falling as one increases; neither pattern is present here. Strong correlation is not correct either, since strength only applies once a positive or negative trend exists, and there isn't one.
- (c) No — 8 from one class is too small to represent the school. — Method: judge reliability by asking whether the sample is both large enough, and spread across the population, relative to what it is meant to represent. Working: 8 pupils is a tiny fraction of the school's 1,000 pupils, and all 8 come from a single class rather than a range of year groups, so the sample is both too small and too narrow to represent the whole school reliably. She is not right. Saying any sample size gives an equally reliable estimate ignores that reliability generally improves with a larger, more representative sample. Saying the method is unreliable because it was not done online is not a reason connected to sample size or representativeness at all. Saying 8 is reliable because it is more than half her class compares the sample to the wrong population — the school has 1,000 pupils, not one class. Always judge a sample's size against the population it is meant to represent, not against a smaller group within it.
- (a) No, 150 pupils are a tenth of the school, chosen at random — Method: judge a sample on two things, whether every member of the population had the same chance of being chosen, and whether the sample is large enough to carry a pattern. Working: the 150 pupils were drawn from the register of every pupil in the school, so no year group or set is shut out and no pupil chooses to take part; and 150 ÷ 1,500 = 0.1, so one pupil in ten has been asked. A random sample of that share is ample for an estimate of how long the school's pupils spend on homework. Answer: no, because 150 pupils are a tenth of the school and were chosen at random. The distractors: saying a random sample always gives the exact school figure reaches the same verdict for a reason that is false, since a second random sample of 150 would give a slightly different mean; saying 150 pupils cannot be picked at random from 1,500 treats randomness as something only a whole population can have, when drawing names from the register is exactly how a random sample is taken; saying that only asking all 1,500 could show anything rejects sampling altogether, which would leave no way to study any population too large to count.
- (d) £15.50 — 2 × 6 = 12, and 12 + 3.50 = 15.50, so the estimated fare is £15.50. Choosing £12.00 stops after 2 × 6 = 12 and forgets to add the £3.50. Choosing £19.00 adds the distance and the constant first and then multiplies: 6 + 3.50 = 9.50, and 9.50 × 2 = 19.00, applying the ×2 to the whole sum instead of only to the distance. Choosing £13.00 multiplies only the constant term by 2 instead of the distance: 2 × 3.50 = 7, and 7 + 6 = 13.00.
- (c) No, 90 cm is far outside the heights on the graph — Method: a line of best fit describes the trend only across the stretch of data it was drawn through; predicting beyond that stretch is extrapolation, and nothing in the data supports it. Working: the heights used to draw this line run from 150 cm to 180 cm, all of them Year 10 pupils, while 90 cm is 60 cm below the shortest of them and belongs to a two-year-old child, whose build follows no trend the graph has measured. Substituting anyway gives 0.9 × 90 − 85 = −4, a mass of −4 kg, which cannot exist. Answer: no, because 90 cm is far outside the heights on the graph. The distractors: saying a line of best fit cannot be used to predict at all throws away its main purpose, since a prediction made between the plotted values is perfectly sound; saying the line passes through all 20 points misdescribes a line of best fit, which is drawn to follow the trend of the points and will normally pass through few of them; saying the equation works for any value put into it treats an equation fitted to Year 10 heights as a law of nature, and the mass of −4 kg shows what that assumption produces.
- (d) Only families with strong feelings bothered to reply. — Method: a survey has non-response bias when only some of the people asked actually reply, and those who do are not a typical cross-section of everyone who was asked. Working: only 30 of the 200 families sent back their questionnaire, and 27 of those 30 — the great majority — said they were unhappy. Families who feel strongly about an issue, particularly those with a complaint, are far more likely to make the effort to reply than families who are simply satisfied and see no need to say anything, so the 30 replies over-represent unhappy families. Saying the families who replied were picked at random by the school gets the sampling the wrong way round: nobody picked them — they picked themselves by deciding to reply, and that is precisely why they are not a typical cross-section of all 200. Saying postal surveys always have low response rates restates that the response was low without explaining why a low response rate, on its own, makes a result unrepresentative — it is the reason FOR the low response, not the low response itself, that causes the bias here. Saying that the 27 unhappy replies show most families are unhappy is exactly the mistake the question is warning against: it treats the loudest 30 replies as if they stood for the other 170 who never sent theirs back. A low response rate is a warning sign only because the people who bother to reply are rarely typical of everyone who was asked.
- (c) Neither causes the other; sunshine links both. — Both ice cream sales and sunburn cases tend to rise on hot, sunny days, so the amount of sunshine is a third factor linked to both — neither variable causes the other. Saying ice cream sales cause the sunburn assumes a causal link in one direction that the correlation alone cannot establish. Saying sunburn cases cause the ice cream sales assumes the reverse causal link, which is no more justified. Saying a strong correlation always means causation is the general error this question is testing: correlation, however strong, does not by itself prove that one variable causes the other.
- (b) On average a plant grew 1.5 cm taller for each extra day — Method: in the equation of a line, the number multiplying x is the gradient, and a gradient states the change in y produced by an increase of 1 in x, read in the units of the two axes. Working: here x is measured in days and y in centimetres, so the gradient 1.5 carries the units centimetres per day. Testing it on the line, 5 days gives 1.5 × 5 + 4 = 11.5 cm and 6 days gives 1.5 × 6 + 4 = 13 cm, a rise of 1.5 cm for the one extra day. Answer: on average a plant grew 1.5 cm taller for each extra day of watering. The distractors: 1.5 cm as the height before any watering is the value of y when x is 0, which is the other number in the equation, 4 cm, so this swaps the gradient and the intercept; 1.5 cm as the gap between the tallest and the shortest plant reads the gradient as a range, when a range is a difference between two of the 16 plants and a gradient is a rate; 1.5 days for each extra centimetre inverts the rate, dividing days by centimetres instead of centimetres by days, and the line gives 1 cm of growth in two thirds of a day.
- (c) The data show a link only; a third factor may affect both — Method: a study of this kind measures two quantities and reports how they change together; deciding that one of them produces the other is a further claim, and it needs evidence that the measurements alone cannot give. Working: the study shows that more coffee goes with better concentration, which is a positive correlation; but a third factor that was never measured, such as how motivated someone is, could raise both the coffee drinking and the concentration, and the concentration could equally be what leads to the extra coffee. Answer: the data show a link only, because a third factor may be affecting both quantities, so no claim about cause can be made. The distractors: calling the conclusion safe because the correlation is positive treats the direction of a correlation as proof of cause, which no direction can give; calling it wrong because the correlation is negative misreads the direction of the relationship, since the study reports both quantities rising together; saying the two quantities are not linked denies the correlation the study actually found, when what fails is only the claim about cause.
- (b) £11.00 — 1.5 × 6 = 9, and 9 + 2 = 11, so the estimated cost is £11.00. Choosing £9.00 stops after 1.5 × 6 = 9 and forgets to add the £2. Choosing £12.00 adds the mass and the constant first and then multiplies: 6 + 2 = 8, and 8 × 1.5 = 12.00. Choosing £13.50 swaps the gradient and the intercept, using y = 2x + 1.5 instead: 2 × 6 = 12, and 12 + 1.5 = 13.50.
- (d) 210 — 350 − 150 = 200. 200 ÷ 10 = 20, so the gradient is 20. Using the point (5, 150): 20 × 5 = 100, so 150 − 100 = 50 is the intercept, giving the line y = 20x + 50. At x = 8: 20 × 8 = 160, and 160 + 50 = 210, so the estimated number of visitors is 210. Choosing 160 stops after 20 × 8 = 160 and forgets to add the intercept of 50. Choosing 250 comes from averaging the two given y-values: 150 + 350 = 500, and 500 ÷ 2 = 250, instead of using the line's equation. Choosing 240 assumes the visitors are directly proportional to the hours of sunshine using the first point, 150 × 8 ÷ 5 = 240, which ignores that the line does not pass through the origin.
- (d) It asks two things at once and invites agreement — Method: a survey question is faulty when a reply to it cannot be read as evidence about one single thing, so check how many claims it contains and whether its wording pushes the reader one way. Working: the question joins two separate claims, that learning matters and that more homework should be set, so a reply of yes could mean either of them or both and cannot be counted as evidence about homework; the opening words “Do you agree” also invite agreement instead of leaving the reader free to say no. Answer: it asks two things at once and invites agreement. The distractors: the reply calling it too short mistakes length for clarity, when the fault is that too much has been packed in rather than too little; the reply about long words is false, since every word in the question is an everyday one and the fault lies in what is being asked rather than in the vocabulary used to ask it; the reply that the question is fine takes a yes or no answer as proof that the question works, which is exactly what a double question defeats.
- (b) Treat them as outliers and check them before deciding — Method: a point lying a long way from the pattern the rest of the data make is called an outlier, and an outlier is investigated before anything is done with it, because it may be an error in the data or it may be a genuine but unusual case. Working: 48 of the 50 points lie close to the rising line of best fit, so the trend is set by those 48; the two remaining points do not follow it, so they are identified as outliers and checked — a mistake in measuring or recording would be corrected, while a genuine reading would be kept and reported. Answer: treat them as outliers and check them before deciding what to do with them. The distractors: deleting them at once assumes that every point far from the line must be an error, which throws away real data; moving the line so that it passes through them assumes a line of best fit must touch particular points, when it is drawn to follow all 50; taking them as proof that there is no correlation lets two points overturn the pattern that the other 48 agree on.
- (c) Yes — with an estimate of 320, above the 250 limit. — Method: scale the sample proportion up to the whole batch to get an estimate, then compare that estimate with the 250 limit to reach a decision. Working: in the sample, 4 out of 50 boards are faulty, a proportion of 4 ÷ 50 = 0.08. Applying that proportion to the batch of 4,000 gives an estimate of 0.08 × 4000 = 320 faulty boards. Since 320 is more than 250, the factory should scrap the batch. Inverting the proportion, 50 ÷ 4 = 12.5, and treating that as a percentage of the batch, 12.5% × 4000 = 500, still gives 'yes' but from the wrong fraction, so it overstates the estimate. Comparing the raw number of faulty boards found in the sample, 4, directly with the 250 limit skips the scaling up to the batch altogether, and 4 is nowhere near 250, so that route wrongly says 'no'. Dividing the batch by the sample size, 4000 ÷ 50 = 80, finds how many samples of 50 fit into the batch but stops before multiplying by the 4 faulty boards found, so it also wrongly says 'no'. Always find the proportion in the sample first, scale it up to the whole batch, and only then compare the estimate with the limit given.
Build your own mix at the worksheet builder.