Printable · GCSE Foundation · ages 14-16
Statistics worksheet — GCSE Foundation
Fifteen questions across the statistics statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Statistics worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (a) Negative correlation — As the age of the car increases, the points fall towards a lower value, so the value decreases as the age increases. This falling pattern is a negative correlation. A positive correlation would show the points rising together instead. No correlation would apply only if the points showed no pattern at all, and correlation is not the same as causation — strong causation is not a type of correlation.
- (d) 45 — Method: convert the angle into a fraction of the full circle, 360°, then apply that fraction to the total number of shoppers. Working: the card sector is 90° out of 360°, a fraction of 90 ÷ 360 = 0.25. Applying that fraction to the 180 shoppers gives 0.25 × 180 = 45 shoppers. Giving 90 states the angle itself, not a number of shoppers — the angle first has to be converted into a fraction. Using the remaining angle, 360 − 90 = 270°, and scaling that, 270 ÷ 360 × 180 = 135, finds the number who did NOT pay by card, not the number who did. Dividing 360 by 90, 360 ÷ 90 = 4, finds how many equal 90° sectors fit in the circle, a fact about the pie chart's shape, not about the shoppers at all. Always convert the angle to a fraction of 360° first, and apply that same fraction to the total number of people.
- (b) On average a plant grew 1.5 cm taller for each extra day — Method: in the equation of a line, the number multiplying x is the gradient, and a gradient states the change in y produced by an increase of 1 in x, read in the units of the two axes. Working: here x is measured in days and y in centimetres, so the gradient 1.5 carries the units centimetres per day. Testing it on the line, 5 days gives 1.5 × 5 + 4 = 11.5 cm and 6 days gives 1.5 × 6 + 4 = 13 cm, a rise of 1.5 cm for the one extra day. Answer: on average a plant grew 1.5 cm taller for each extra day of watering. The distractors: 1.5 cm as the height before any watering is the value of y when x is 0, which is the other number in the equation, 4 cm, so this swaps the gradient and the intercept; 1.5 cm as the gap between the tallest and the shortest plant reads the gradient as a range, when a range is a difference between two of the 16 plants and a gradient is a rate; 1.5 days for each extra centimetre inverts the rate, dividing days by centimetres instead of centimetres by days, and the line gives 1 cm of growth in two thirds of a day.
- (b) A line graph — Sales recorded at the end of each of the twelve months are time series data, and a line graph is the chart built to show how a value changes over time, with the points usually joined in order. A pie chart is for showing categorical data as shares of a whole, not a trend over time. A pictogram shows a frequency for separate categories using symbols, not a continuous trend. A scatter graph is for comparing two different variables against each other, not one variable over time.
- (b) Positive correlation — Method: the type of correlation is named from the direction the points take as the scatter graph is read from left to right. Working: the points rise from left to right, so as the arm span read on the horizontal axis increases, the height read on the vertical axis increases as well; two quantities that increase together show positive correlation. Answer: positive correlation. The distractors: negative correlation comes from naming the direction the wrong way round, since a negative correlation needs the points to fall as the graph is read from left to right; no correlation comes from treating points that are spread out rather than sitting exactly on a line as though they showed no relationship; direct proportion comes from confusing a rising trend with proportion, which would additionally need the line through the points to pass through the origin and would mean doubling one quantity doubles the other.
- (d) It asks two things at once and invites agreement — Method: a survey question is faulty when a reply to it cannot be read as evidence about one single thing, so check how many claims it contains and whether its wording pushes the reader one way. Working: the question joins two separate claims, that learning matters and that more homework should be set, so a reply of yes could mean either of them or both and cannot be counted as evidence about homework; the opening words “Do you agree” also invite agreement instead of leaving the reader free to say no. Answer: it asks two things at once and invites agreement. The distractors: the reply calling it too short mistakes length for clarity, when the fault is that too much has been packed in rather than too little; the reply about long words is false, since every word in the question is an everyday one and the fault lies in what is being asked rather than in the vocabulary used to ask it; the reply that the question is fine takes a yes or no answer as proof that the question works, which is exactly what a double question defeats.
- (c) A line of best fit — Method: the straight line drawn on a scatter graph is named from the job it does — it is chosen so that it follows the whole set of points as closely as possible. Working: the line passes through the middle of the points, with roughly as many points above it as below it, and it need not pass through any of the plotted points at all; the name given to the straight line chosen in that way is a line of best fit. Answer: a line of best fit. The distractors: a line of symmetry comes from confusing a trend with symmetry, which is a property of a shape rather than of a set of data; a horizontal line through the mean comes from thinking the trend is shown by an average, when a horizontal line would say that the vertical quantity does not change and so show no correlation; a line joining the first and last points comes from thinking the line must join the two extreme points, which lets two points decide a trend that all of the points should share in.
- (b) Treat them as outliers and check them before deciding — Method: a point lying a long way from the pattern the rest of the data make is called an outlier, and an outlier is investigated before anything is done with it, because it may be an error in the data or it may be a genuine but unusual case. Working: 48 of the 50 points lie close to the rising line of best fit, so the trend is set by those 48; the two remaining points do not follow it, so they are identified as outliers and checked — a mistake in measuring or recording would be corrected, while a genuine reading would be kept and reported. Answer: treat them as outliers and check them before deciding what to do with them. The distractors: deleting them at once assumes that every point far from the line must be an error, which throws away real data; moving the line so that it passes through them assumes a line of best fit must touch particular points, when it is drawn to follow all 50; taking them as proof that there is no correlation lets two points overturn the pattern that the other 48 agree on.
- (a) Drawing 60 names at random from a list of all 1200 pupils — Method: a sample is random when every member of the population has the same chance of being chosen and nobody, including the pupils themselves, can influence who ends up in it; test each method against that. Working: drawing names from a list of all 1200 pupils gives each pupil the same chance, 60 out of 1200, whatever their year group, class or opinion, so the method is random. Answer: drawing 60 names at random from a list of all 1200 pupils. The distractors: asking the pupils who volunteer is self-selection, and the pupils with the strongest views volunteer first, so they decide the sample; asking the pupils nearest the door is convenience sampling, which reaches only those who happen to be in one place at one time; asking two Year 10 classes samples a cluster, so every pupil in the other year groups has no chance of being chosen at all.
- (c) No, 90 cm is far outside the heights on the graph — Method: a line of best fit describes the trend only across the stretch of data it was drawn through; predicting beyond that stretch is extrapolation, and nothing in the data supports it. Working: the heights used to draw this line run from 150 cm to 180 cm, all of them Year 10 pupils, while 90 cm is 60 cm below the shortest of them and belongs to a two-year-old child, whose build follows no trend the graph has measured. Substituting anyway gives 0.9 × 90 − 85 = −4, a mass of −4 kg, which cannot exist. Answer: no, because 90 cm is far outside the heights on the graph. The distractors: saying a line of best fit cannot be used to predict at all throws away its main purpose, since a prediction made between the plotted values is perfectly sound; saying the line passes through all 20 points misdescribes a line of best fit, which is drawn to follow the trend of the points and will normally pass through few of them; saying the equation works for any value put into it treats an equation fitted to Year 10 heights as a law of nature, and the mass of −4 kg shows what that assumption produces.
- (d) £15.50 — 2 × 6 = 12, and 12 + 3.50 = 15.50, so the estimated fare is £15.50. Choosing £12.00 stops after 2 × 6 = 12 and forgets to add the £3.50. Choosing £19.00 adds the distance and the constant first and then multiplies: 6 + 3.50 = 9.50, and 9.50 × 2 = 19.00, applying the ×2 to the whole sum instead of only to the distance. Choosing £13.00 multiplies only the constant term by 2 instead of the distance: 2 × 3.50 = 7, and 7 + 6 = 13.00.
- (a) The relationship between two variables — Method: what a diagram shows is decided by what has to be known before a single mark can be plotted on it. Working: every point on a scatter graph is plotted from a pair of measurements taken from the same person or object, one read on the horizontal axis and one on the vertical axis; having two measurements for each point is what makes it possible to look for a pattern between them, and the pattern between two variables is what the graph displays. Answer: a scatter graph shows the relationship between two variables. The distractors: the frequency of each single value is what a bar chart or a vertical line chart shows, and it needs only one list of values; how a total is shared between categories is what a pie chart shows; how one quantity changes over time is what a time series line graph shows, in which one of the two axes is always time.
- (d) 23.57 °C — Method: add all seven temperatures, divide by the number of readings and round only at the end. Working: 22 + 24 + 23 + 25 + 26 + 21 + 24 = 165, and 165 ÷ 7 = 23.5714…, which rounds to 23.57 to 2 decimal places. Answer: 23.57 °C. The distractors: 24 °C comes from writing down the mode, the only temperature recorded twice, instead of the mean; 27.5 °C comes from dividing the total by 6 instead of by the 7 days recorded; 5 °C comes from working out the range, 26 − 21, which is a measure of spread and not an average.
- (a) A straight line sloping down from left to right — Method: a line of best fit is a straight line drawn to follow the trend of the points, so its slope is decided by the direction of the relationship between the two quantities. Working: as the price rises, the satisfaction score falls, so the points start high on the left of the graph and finish low on the right; the straight line that follows them therefore slopes downwards as the graph is read from left to right, which is the line of a negative correlation. Answer: a straight line sloping down from left to right. The distractors: a line sloping up comes from reading a falling relationship as a rising one; a horizontal line comes from expecting no correlation, since a horizontal line says the satisfaction score does not change as the price changes; a curve passing through every point comes from thinking a line of best fit has to touch all of the plotted points, when it is a single straight line drawn through the middle of them.
- (b) £11.00 — 1.5 × 6 = 9, and 9 + 2 = 11, so the estimated cost is £11.00. Choosing £9.00 stops after 1.5 × 6 = 9 and forgets to add the £2. Choosing £12.00 adds the mass and the constant first and then multiplies: 6 + 2 = 8, and 8 × 1.5 = 12.00. Choosing £13.50 swaps the gradient and the intercept, using y = 2x + 1.5 instead: 2 × 6 = 12, and 12 + 1.5 = 13.50.
Build your own mix at the worksheet builder.