Printable · GCSE Foundation · ages 14-16
Statistics worksheet — GCSE Foundation
Fifteen questions across the statistics statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Statistics worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) No, the range uses only the fastest and slowest time — Method: check what the range is built from, then look at what it leaves out. Working: both teams have a fastest time of 20 seconds and a slowest of 40 seconds, so both ranges are 40 − 20 = 20 seconds and Tomás has that part right. But the range is calculated from those two values alone. Six of Team A's seven times lie between 20 and 25 seconds, with a single time far out at 40; Team B is the other way round, with six of its seven times at 30 seconds or more and a single time far out at 20. So Team A bunches at the fast end and Team B at the slow end. The two patterns are quite different, and the range cannot see the difference because the five middle times never enter the calculation. Answer: no, because the range uses only the fastest and slowest time. The distractors: comparing the means answers a different question, since a mean measures position rather than spread, and two sets with the same spread can have different means; saying that equal ranges mean equal spread is the very assumption that fails here; saying that seven times each forces the spreads to match confuses the size of a data set with how its values are arranged inside it.
- (c) The data show a link only; a third factor may affect both — Method: a study of this kind measures two quantities and reports how they change together; deciding that one of them produces the other is a further claim, and it needs evidence that the measurements alone cannot give. Working: the study shows that more coffee goes with better concentration, which is a positive correlation; but a third factor that was never measured, such as how motivated someone is, could raise both the coffee drinking and the concentration, and the concentration could equally be what leads to the extra coffee. Answer: the data show a link only, because a third factor may be affecting both quantities, so no claim about cause can be made. The distractors: calling the conclusion safe because the correlation is positive treats the direction of a correlation as proof of cause, which no direction can give; calling it wrong because the correlation is negative misreads the direction of the relationship, since the study reports both quantities rising together; saying the two quantities are not linked denies the correlation the study actually found, when what fails is only the claim about cause.
- (d) 23.57 °C — Method: add all seven temperatures, divide by the number of readings and round only at the end. Working: 22 + 24 + 23 + 25 + 26 + 21 + 24 = 165, and 165 ÷ 7 = 23.5714…, which rounds to 23.57 to 2 decimal places. Answer: 23.57 °C. The distractors: 24 °C comes from writing down the mode, the only temperature recorded twice, instead of the mean; 27.5 °C comes from dividing the total by 6 instead of by the 7 days recorded; 5 °C comes from working out the range, 26 − 21, which is a measure of spread and not an average.
- (c) Yes — with an estimate of 320, above the 250 limit. — Method: scale the sample proportion up to the whole batch to get an estimate, then compare that estimate with the 250 limit to reach a decision. Working: in the sample, 4 out of 50 boards are faulty, a proportion of 4 ÷ 50 = 0.08. Applying that proportion to the batch of 4,000 gives an estimate of 0.08 × 4000 = 320 faulty boards. Since 320 is more than 250, the factory should scrap the batch. Inverting the proportion, 50 ÷ 4 = 12.5, and treating that as a percentage of the batch, 12.5% × 4000 = 500, still gives 'yes' but from the wrong fraction, so it overstates the estimate. Comparing the raw number of faulty boards found in the sample, 4, directly with the 250 limit skips the scaling up to the batch altogether, and 4 is nowhere near 250, so that route wrongly says 'no'. Dividing the batch by the sample size, 4000 ÷ 50 = 80, finds how many samples of 50 fit into the batch but stops before multiplying by the 4 faulty boards found, so it also wrongly says 'no'. Always find the proportion in the sample first, scale it up to the whole batch, and only then compare the estimate with the limit given.
- (d) Correlation is a link; causation is one causing the other — Method: the two words describe different claims — one is about a pattern in the data, the other is about what produced that pattern. Working: correlation says only that two quantities tend to change together, which is something a scatter graph can display; causation says that a change in one quantity actually brings about the change in the other, which needs evidence a scatter graph cannot supply, because a third quantity may be driving both. Answer: correlation is a link between the quantities, while causation is one quantity causing the change in another. The distractors: the statement giving causation as the link and correlation as the cause simply swaps the two words over; the statement that the words mean the same thing is the classic error of reading a correlation as proof of cause; the statement that a scatter graph shows causation but not correlation reverses what a scatter graph can do, since the pattern it displays is exactly the correlation.
- (a) 26 — Method: a line of best fit lets one quantity be predicted from the other, so the score is substituted into the equation of the line and the resulting inequality is solved for the number of hours. Working: a score of at least 80 means 2.5x + 15 ≥ 80; taking 15 from both sides gives 2.5x ≥ 65, and dividing both sides by 2.5 gives x ≥ 26, so the least whole number of hours is 26. Checking, 2.5 × 26 + 15 = 80, which does reach the target. Answer: 26 hours — and this is only an estimate, because a line of best fit predicts a trend rather than an individual result, and a prediction made outside the range of hours the pupils actually revised for would be an extrapolation and less reliable still. The distractors: 27 comes from reaching 26 and then rounding up again, although 26 hours already gives a score of exactly 80; 32 comes from 80 ÷ 2.5, which ignores the 15 in the equation of the line; 38 comes from (80 + 15) ÷ 2.5, that is from adding the 15 instead of subtracting it when rearranging.
- (d) Only internet users reach the website; others are excluded. — Method: a sample is biased when it systematically leaves out part of the population, or systematically over-represents another part. Working: anyone without internet access, or who does not visit the council's website, has NO chance of being included — the sample is drawn only from internet-using residents, which is not the whole town. Saying too many people might respond because the survey is free confuses bias with sample size — bias is about who CAN be reached, not how many respond. Saying people might lie describes a different problem, response honesty, not who was sampled in the first place. Saying online surveys cannot be anonymous is not a reason connected to bias at all. A sample is biased when part of the population has no chance of being included, whatever the reason for that.
- (c) A line of best fit — Method: the straight line drawn on a scatter graph is named from the job it does — it is chosen so that it follows the whole set of points as closely as possible. Working: the line passes through the middle of the points, with roughly as many points above it as below it, and it need not pass through any of the plotted points at all; the name given to the straight line chosen in that way is a line of best fit. Answer: a line of best fit. The distractors: a line of symmetry comes from confusing a trend with symmetry, which is a property of a shape rather than of a set of data; a horizontal line through the mean comes from thinking the trend is shown by an average, when a horizontal line would say that the vertical quantity does not change and so show no correlation; a line joining the first and last points comes from thinking the line must join the two extreme points, which lets two points decide a trend that all of the points should share in.
- (c) No — 8 from one class is too small to represent the school. — Method: judge reliability by asking whether the sample is both large enough, and spread across the population, relative to what it is meant to represent. Working: 8 pupils is a tiny fraction of the school's 1,000 pupils, and all 8 come from a single class rather than a range of year groups, so the sample is both too small and too narrow to represent the whole school reliably. She is not right. Saying any sample size gives an equally reliable estimate ignores that reliability generally improves with a larger, more representative sample. Saying the method is unreliable because it was not done online is not a reason connected to sample size or representativeness at all. Saying 8 is reliable because it is more than half her class compares the sample to the wrong population — the school has 1,000 pupils, not one class. Always judge a sample's size against the population it is meant to represent, not against a smaller group within it.
- (a) x = 0 gives y = −20: a negative number sold — The y-intercept is the value the line predicts when x = 0: y = 3 × 0 − 20 = −20. A kiosk cannot sell a negative number of ice creams, so this is not a sensible estimate. The 3 in the equation is the gradient, not the intercept, so an option claiming x = 0 gives y = 3 has swapped the two numbers around — substituting x = 0 makes the 3x term equal 0, leaving −20, not 3. The danger of extrapolating to very high temperatures is a real issue with this line, but it is a different issue from the y-intercept, so it does not answer this question. And whether x = 0 could occur on a trading day is beside the point: the model still makes that prediction, and it is the prediction itself, −20, that is impossible.
- (c) 40 minutes — Method: for grouped data, estimate the mean using the midpoint of each class — multiply each midpoint by its frequency, add the results, then divide by the total frequency. Working: the midpoints are 10, 30, 50 and 70 minutes. 10 × 5 = 50. 30 × 10 = 300. 50 × 10 = 500. 70 × 5 = 350. Σfx = 50 + 300 + 500 + 350 = 1200. Σf = 5 + 10 + 10 + 5 = 30. Estimated mean = 1200 ÷ 30 = 40 minutes. Using the upper boundary of each class instead of the midpoint — 20 × 5 = 100, 40 × 10 = 400, 60 × 10 = 600, 80 × 5 = 400 — gives a total of 1500 and an estimate of 1500 ÷ 30 = 50 minutes, too high because a boundary is not the middle of the class. Averaging the frequencies themselves, 5, 10, 10 and 5, ignores the times altogether and gives 7.5. Stopping after Σfx = 1200 without dividing by the total frequency gives a number far too large to be a time in minutes. Always find the midpoint of each class before multiplying by the frequency, and always divide by Σf at the end.
- (d) How much the temperatures varied over the seven days — Method: the range of a set of values is the largest value take away the smallest, so it is built from two values only and it measures the gap they leave between them. Working: the largest of the seven readings is 7 °C and the smallest is 2 °C, so the range is 7 − 2 = 5 °C. That figure says the week's readings covered a band 5 °C wide; it names no particular day and no particular reading. Answer: the range describes how much the temperatures varied over the seven days. The distractors: the temperature that occurred most often is the mode, which here is 3 °C, and a mode counts repeats instead of measuring a gap; the temperature typical of the week is an average, and the range is not an average, since it throws away every value lying between the two extremes; the number of different temperatures recorded is 6, a count of how many distinct values appear, while the range is a difference between two of them.
- (d) 1100 — Method: to combine two samples of different sizes, add the faulty counts together and add the sample sizes together before scaling up, rather than treating the two samples separately. Working: the combined sample found 34 + 21 = 55 scratched cases out of 100 + 50 = 150 cases checked, a proportion of 55 ÷ 150. Applying that proportion to the week's production of 3,000 gives an estimate of 55 ÷ 150 × 3000 = 1100 scratched cases. Averaging the two shifts' proportions instead of combining their totals, (34 ÷ 100 + 21 ÷ 50) ÷ 2 = 0.38, gives 0.38 × 3000 = 1140 — this treats the two samples as equally weighted even though Shift A checked twice as many cases as Shift B. Using only Shift A's sample, 34 ÷ 100 × 3000 = 1020, ignores Shift B's cases completely. Using only Shift B's sample, 21 ÷ 50 × 3000 = 1260, ignores Shift A's cases completely. When two samples are different sizes, combine their totals before finding the proportion — do not average the two proportions, and do not use only one shift's sample.
- (d) Testing destroys bulbs, so testing all leaves none to sell. — Method: testing every item in a population instead of a sample is a census — sensible only when testing does not use up or destroy what is being tested. Working: here, testing a bulb to find its lifespan destroys it, so testing all 50,000 bulbs would leave nothing left to sell — a sample lets the company estimate the typical lifespan without destroying its whole stock. Extra electricity used in testing is not the real reason a census is avoided here — it is the destruction of the product that matters. Saying a sample is always more accurate than a full census is the wrong way round: a census, if it could be carried out, gives the exact figure for the whole population — it is testing being destructive, not a lack of accuracy, that rules it out here. There is no law against testing every item a company makes — nothing in the question suggests that. When testing destroys the item being tested, sampling is necessary, not just convenient.
- (d) 20 — 0.4x + 1 = 9, so 0.4x = 9 − 1 = 8, and 8 ÷ 0.4 = 20, so 20 sessions are needed. Choosing 23 divides 9 by 0.4 without first subtracting the 1: 9 ÷ 0.4 = 22.5, rounded up to 23. Choosing 25 subtracts the wrong way, adding the 1 instead of taking it away: 9 + 1 = 10, and 10 ÷ 0.4 = 25. Choosing 2 misplaces the decimal point in the gradient, dividing by 4 instead of by 0.4: 8 ÷ 4 = 2.
Build your own mix at the worksheet builder.