Printable · GCSE Foundation · ages 14-16
Statistics worksheet — GCSE Foundation
Fifteen questions across the statistics statements at Foundation tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Statistics worksheet — GCSE Foundation
MathsUKwww.geekhero.co.uk
- (d) 648 kg — Method: to estimate a total from a sample, multiply the sample's mean by the number of items in the whole population, then check the units the question asks for. Working: 32.4 g × 20,000 = 648,000 g. Converting to kilograms, 648,000 ÷ 1,000 = 648 kg. This is only an estimate, not an exact total, because it assumes every one of the 20,000 packets has exactly the sample mean mass, when in reality individual packets vary above and below it. Giving 1.62 kg multiplies the mean by 50, the SAMPLE size, instead of by 20,000, the number of packets actually made that day — this finds the total mass of the 50 sampled packets, not the day's production. Giving 32.4 kg treats the sample mean itself, in grams, as if it already were the day's total mass in kilograms, skipping the scaling up altogether. Giving 648,000 kg correctly scales the mean up to the whole day's production but never converts the answer from grams to kilograms, leaving it 1,000 times too large. Always scale a sample's mean up by the SIZE OF THE WHOLE POPULATION, and always finish by checking the units the question asks for.
- (d) Correlation is a link; causation is one causing the other — Method: the two words describe different claims — one is about a pattern in the data, the other is about what produced that pattern. Working: correlation says only that two quantities tend to change together, which is something a scatter graph can display; causation says that a change in one quantity actually brings about the change in the other, which needs evidence a scatter graph cannot supply, because a third quantity may be driving both. Answer: correlation is a link between the quantities, while causation is one quantity causing the change in another. The distractors: the statement giving causation as the link and correlation as the cause simply swaps the two words over; the statement that the words mean the same thing is the classic error of reading a correlation as proof of cause; the statement that a scatter graph shows causation but not correlation reverses what a scatter graph can do, since the pattern it displays is exactly the correlation.
- (c) 69 — Method: multiply the mean by the number of values to find the total, then subtract the total of the known values. Working: the total of all five scores is 68 × 5 = 340. The total of the four known scores is 55 + 62 + 74 + 80 = 271. The fifth score is 340 − 271 = 69. Subtracting the other way round, 271 − 340 = −69, gives the right size answer with the wrong sign. Guessing that the missing score simply equals the mean, 68, ignores that the four known scores are not themselves centred on 68. Multiplying the mean by 4 instead of 5, 68 × 4 = 272, then 272 − 271 = 1, undercounts how many scores there are. Always multiply the mean by the TOTAL number of values before subtracting.
- (d) An outlier from the damaged wing, not the trend. — That bird's point lies a long way from the rising trend followed by every other bird, and its low wingspan is explained by the damaged wing rather than by its age — it is an outlier caused by an unusual factor, not part of the general relationship between age and wingspan, so it should not be used when drawing the line of best fit. Saying every point must be used ignores that an outlier caused by a separate, identifiable factor can rightly be set aside. Saying it shows no correlation ignores that the other 19 points do show a clear rising trend; one outlier does not remove that. Saying it proves the line is inaccurate confuses one unusual bird with a fault in the line itself, when the line correctly describes the trend followed by the rest of the data.
- (c) Yes — with an estimate of 320, above the 250 limit. — Method: scale the sample proportion up to the whole batch to get an estimate, then compare that estimate with the 250 limit to reach a decision. Working: in the sample, 4 out of 50 boards are faulty, a proportion of 4 ÷ 50 = 0.08. Applying that proportion to the batch of 4,000 gives an estimate of 0.08 × 4000 = 320 faulty boards. Since 320 is more than 250, the factory should scrap the batch. Inverting the proportion, 50 ÷ 4 = 12.5, and treating that as a percentage of the batch, 12.5% × 4000 = 500, still gives 'yes' but from the wrong fraction, so it overstates the estimate. Comparing the raw number of faulty boards found in the sample, 4, directly with the 250 limit skips the scaling up to the batch altogether, and 4 is nowhere near 250, so that route wrongly says 'no'. Dividing the batch by the sample size, 4000 ÷ 50 = 80, finds how many samples of 50 fit into the batch but stops before multiplying by the 4 faulty boards found, so it also wrongly says 'no'. Always find the proportion in the sample first, scale it up to the whole batch, and only then compare the estimate with the limit given.
- (b) All 2,000 members of the sports centre. — Method: in a survey, the population is the whole group the survey is trying to find out about, and the sample is the smaller group actually asked. Working: this survey wants to know what the sports centre's members think, so the population is every one of the 2,000 members — whether or not they were personally asked. Saying the population is the 100 members who were asked names the sample, not the population; the sample is drawn FROM the population, so it is smaller than it, not the same as it. Saying the population is everybody who lives in Ipswich widens the group far beyond who the survey is actually about — plenty of Ipswich residents are not members of the sports centre at all, so they are outside this survey altogether. Saying the population is the members who say they are unhappy confuses the population with a result of the survey: whether a member turns out to be happy or unhappy is something the survey finds out, not part of the definition of who is being studied. The population is always the whole group the question is about, before any sampling or any results come in.
- (d) £15.50 — 2 × 6 = 12, and 12 + 3.50 = 15.50, so the estimated fare is £15.50. Choosing £12.00 stops after 2 × 6 = 12 and forgets to add the £3.50. Choosing £19.00 adds the distance and the constant first and then multiplies: 6 + 3.50 = 9.50, and 9.50 × 2 = 19.00, applying the ×2 to the whole sum instead of only to the distance. Choosing £13.00 multiplies only the constant term by 2 instead of the distance: 2 × 3.50 = 7, and 7 + 6 = 13.00.
- (a) No, 150 pupils are a tenth of the school, chosen at random — Method: judge a sample on two things, whether every member of the population had the same chance of being chosen, and whether the sample is large enough to carry a pattern. Working: the 150 pupils were drawn from the register of every pupil in the school, so no year group or set is shut out and no pupil chooses to take part; and 150 ÷ 1,500 = 0.1, so one pupil in ten has been asked. A random sample of that share is ample for an estimate of how long the school's pupils spend on homework. Answer: no, because 150 pupils are a tenth of the school and were chosen at random. The distractors: saying a random sample always gives the exact school figure reaches the same verdict for a reason that is false, since a second random sample of 150 would give a slightly different mean; saying 150 pupils cannot be picked at random from 1,500 treats randomness as something only a whole population can have, when drawing names from the register is exactly how a random sample is taken; saying that only asking all 1,500 could show anything rejects sampling altogether, which would leave no way to study any population too large to count.
- (b) 120, unreliable — x = 25 is outside 1 to 12 — The line of best fit is y = 4x + 20. 4 × 25 = 100, and 100 + 20 = 120, so the estimate is y = 120. But x = 25 lies far outside the plotted range of 1 to 12 years, so this is an extrapolation, and the estimate is not reliable. Reaching 100 instead of 120 comes from 4 × 25 = 100 with the intercept of 20 left out — still correctly flagged as unreliable, but the wrong value. Calling the estimate reliable simply because it was calculated correctly, giving 120, wrongly assumes that a correct calculation is automatically trustworthy, ignoring that x = 25 lies far beyond the data actually collected. Reaching 68, from 4 × 12 = 48 and 48 + 20 = 68, substitutes x = 12, the top of the plotted range, instead of the assistant's actual x = 25, and wrongly calls that reliable because 12 lies inside the range.
- (b) Treat them as outliers and check them before deciding — Method: a point lying a long way from the pattern the rest of the data make is called an outlier, and an outlier is investigated before anything is done with it, because it may be an error in the data or it may be a genuine but unusual case. Working: 48 of the 50 points lie close to the rising line of best fit, so the trend is set by those 48; the two remaining points do not follow it, so they are identified as outliers and checked — a mistake in measuring or recording would be corrected, while a genuine reading would be kept and reported. Answer: treat them as outliers and check them before deciding what to do with them. The distractors: deleting them at once assumes that every point far from the line must be an error, which throws away real data; moving the line so that it passes through them assumes a line of best fit must touch particular points, when it is drawn to follow all 50; taking them as proof that there is no correlation lets two points overturn the pattern that the other 48 agree on.
- (d) 19 kg — Method: estimate the mean of grouped data by multiplying each class's midpoint by its frequency, adding the four totals, then dividing by the total frequency. Working: the midpoints are 5, 15, 25 and 35 kg. The weighted totals are 11 × 5 = 55, 5 × 15 = 75, 5 × 25 = 125 and 9 × 35 = 315, which add to 570. Dividing by the 30 dogs gives an estimate of 570 ÷ 30 = 19 kg. Giving 5 kg reads off the midpoint of the modal class, 0 < m ≤ 10, the class with the most dogs — but the class with the most dogs is not where the mean falls, and neither is a substitute for actually calculating it. Giving 20 kg averages the four midpoints, (5 + 15 + 25 + 35) ÷ 4, treating every class as equally likely and ignoring that far more dogs are in the lightest and heaviest classes than in the middle two. Giving 570 kg stops after finding the correct weighted total and forgets the final division by the 30 dogs. Always weight each midpoint by its own frequency, and always finish by dividing by the total frequency, not the number of classes.
- (d) 20 — 0.4x + 1 = 9, so 0.4x = 9 − 1 = 8, and 8 ÷ 0.4 = 20, so 20 sessions are needed. Choosing 23 divides 9 by 0.4 without first subtracting the 1: 9 ÷ 0.4 = 22.5, rounded up to 23. Choosing 25 subtracts the wrong way, adding the 1 instead of taking it away: 9 + 1 = 10, and 10 ÷ 0.4 = 25. Choosing 2 misplaces the decimal point in the gradient, dividing by 4 instead of by 0.4: 8 ÷ 4 = 2.
- (a) A vertical line chart (discrete numerical data) — The number of pets is discrete numerical data — whole-number values such as 0, 1, 2, 3 or 4 — recorded for one variable, so a vertical line chart is the chart specified for this kind of data. A bar chart is used for categorical data, such as favourite colour, not numerical values counted like this. A pie chart shows proportions of a whole and does not show the frequency of each separate value. A scatter graph compares two different variables against each other, and only one variable, the number of pets, is recorded here.
- (c) No — 8 from one class is too small to represent the school. — Method: judge reliability by asking whether the sample is both large enough, and spread across the population, relative to what it is meant to represent. Working: 8 pupils is a tiny fraction of the school's 1,000 pupils, and all 8 come from a single class rather than a range of year groups, so the sample is both too small and too narrow to represent the whole school reliably. She is not right. Saying any sample size gives an equally reliable estimate ignores that reliability generally improves with a larger, more representative sample. Saying the method is unreliable because it was not done online is not a reason connected to sample size or representativeness at all. Saying 8 is reliable because it is more than half her class compares the sample to the wrong population — the school has 1,000 pupils, not one class. Always judge a sample's size against the population it is meant to represent, not against a smaller group within it.
- (d) 1100 — Method: to combine two samples of different sizes, add the faulty counts together and add the sample sizes together before scaling up, rather than treating the two samples separately. Working: the combined sample found 34 + 21 = 55 scratched cases out of 100 + 50 = 150 cases checked, a proportion of 55 ÷ 150. Applying that proportion to the week's production of 3,000 gives an estimate of 55 ÷ 150 × 3000 = 1100 scratched cases. Averaging the two shifts' proportions instead of combining their totals, (34 ÷ 100 + 21 ÷ 50) ÷ 2 = 0.38, gives 0.38 × 3000 = 1140 — this treats the two samples as equally weighted even though Shift A checked twice as many cases as Shift B. Using only Shift A's sample, 34 ÷ 100 × 3000 = 1020, ignores Shift B's cases completely. Using only Shift B's sample, 21 ÷ 50 × 3000 = 1260, ignores Shift A's cases completely. When two samples are different sizes, combine their totals before finding the proportion — do not average the two proportions, and do not use only one shift's sample.
Build your own mix at the worksheet builder.