Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The braking distance of a car, in metres, is estimated using the formula d = 0.4v² + 6, where v is the speed in mph. A car travelling at 35 mph brakes. Work out the estimated braking distance.
- 2.The table shows the speed, in m/s, of a car at times, in seconds, all 2 seconds apart: 0 at t = 0, 3 at t = 2, 8 at t = 4, 15 at t = 6, 24 at t = 8. A student uses the trapezium rule with these five readings to estimate the distance the car travels. By finding the second differences of the speed values, decide whether this trapezium estimate is an overestimate or an underestimate of the true distance.
- 3.A gym charges a joining fee plus a monthly fee. Anna paid £100 in total after 3 months of membership. Ben paid £160 in total after 6 months of membership (same joining fee and monthly fee as Anna). Work out the monthly fee.
- 4.A rectangular sheet of metal measures 20 cm by 12 cm. A square of side x cm is cut from each corner and the sides are folded up to make an open box of volume 200 cm³. This gives x³ − 16x² + 60x − 50 = 0, which can be solved using the iterative formula xₙ₊₁ = (16xₙ² − xₙ³ + 50)/60. The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₃, and use it to find the longer side of the base of the box correct to 1 decimal place.
- 5.A regular hexagon has sides of length (x + 2) cm. Write down an expression, in terms of x, for the perimeter of the hexagon.
- 6.Points A(−1, 2) and B(5, 8) are the endpoints of a line segment. Work out the equation of the perpendicular bisector of AB.
- 7.An allotment is in the shape of a rectangle. Its length is 5 m more than its width, x metres, and its area is 20 m². This gives x² + 5x − 20 = 0, which can be solved using the iterative formula xₙ₊₁ = 20 ÷ (xₙ + 5). Taking x₀ = 2, so that x₁ is the value found after the formula has been used once, work out x₂ correct to 2 decimal places.
- 8.A tap's flow rate, in litres per minute, is plotted against time, in minutes, on a graph. What are the units of the area under this graph?
- 9.The trapezium rule is used to estimate the area under a curve between x = 2 and x = 6. The curve is concave up (it curves upwards, like the inside of a bowl) throughout this interval. Which statement about the estimate is correct?
- 10.A gas company charges a standing charge plus a rate per unit used. The total cost, y in pounds, for using x units is given by y = 0.15x + 20. Work out the cost of using 200 units.y = 0.15x + 20
- 11.The graph of W = 840 ÷ L shows how the width, W metres, of a rectangular field of area 840 m² depends on its length, L metres. Use the relationship to work out the width when the length is 35 m, and hence the perimeter of the field.
- 12.A plumber charges a call-out fee of £30 plus £25 per hour worked. Work out the total charge for a job that takes 3 hours.
- 13.A company's cost, in £, for producing x items is shown on a graph. The tangent to the curve at x = 50 passes through (30, 400) and (70, 800). Interpret the gradient of this tangent in the context of the company's costs.
- 14.A car's journey is represented by a velocity-time graph. The total distance travelled, found from the area under the graph, is 350 metres, and the total time for the journey is 25 seconds. Work out the car's average speed for the whole journey, in m/s.
- 15.A taxi company charges a £2.50 booking fee plus £1.80 per mile. A journey costs £15.10 in total. Work out the number of miles travelled.
Answer key
- (c) 496 — d = 0.4v² + 6. First v² = 35 × 35 = 1225. Then 0.4 × 1225 = 490. Add 6: 490 + 6 = 496 m. 490 comes from forgetting to add the 6 at the end. 202 comes from squaring 0.4v together instead of squaring only v, (0.4 × 35)² + 6 = 14² + 6 = 202. 20 comes from using v instead of v², 0.4 × 35 + 6.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (d) £20 — Let f be the joining fee and m the monthly fee: f + 3m = 100 and f + 6m = 160. Subtracting the first equation from the second eliminates f: 3m = 60, so m = 20. A candidate who finds the joining fee instead of the monthly fee would get f = 100 − 3(20) = £40. A candidate who divides Ben's total by his number of months, ignoring that part of the cost is a fixed joining fee, would get 160 ÷ 6 ≈ £26.67. A candidate who divides the difference in cost by the total number of months instead of the difference in months would get (160 − 100) ÷ 9 ≈ £6.67.
- (c) 17.7 cm — Method: the iteration converges on x, the depth of the box, which is also the side of each square cut away; a square is removed from both ends of the 20 cm side, so the longer side of the base is 20 − 2x. Run the formula three times, then carry out that subtraction. Working: x₁ = (16 × 1² − 1³ + 50) ÷ 60 = 65 ÷ 60 = 1.08333…; x₂ = 67.50636… ÷ 60 = 1.12510…; x₃ = 68.82959… ÷ 60 = 1.14715…. The longer side of the base is 20 − 2 × 1.14715… = 17.70568…, which is 17.7 cm correct to 1 decimal place. Answer: 17.7 cm. The distractors: 1.1 cm is x₃ itself rounded, the depth of the box, given by a candidate who runs the iteration correctly and then stops before the step the question actually asks for; 18.9 cm is 20 − 1.14715…, taking away one square instead of two and forgetting that a corner is cut from each end of that side; 9.7 cm is 12 − 2 × 1.14715…, the shorter side of the base, which measures the wrong edge of the sheet.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (d) x + y = 7 — The midpoint of AB is (−1 + 5)/2, (2 + 8)/2, which is (2, 5). The gradient of AB is (8 − 2)/(5 − (−1)) = 6/6 = 1. The perpendicular bisector has gradient −1 and passes through (2, 5): y − 5 = −(x − 2), which rearranges to x + y = 7. Distractor routes: x − y = −3 uses the gradient of AB itself, 1, rather than its negative reciprocal, giving a line PARALLEL to AB through the midpoint instead of perpendicular to it. x + y = 12 comes from adding the y-coordinates, 2 + 8 = 10, but forgetting to divide by 2, using the midpoint (2, 10) instead of (2, 5). x + y = 4 comes from using A's x-coordinate, −1, directly instead of averaging it with B's, giving the point (−1, 5) instead of the true midpoint (2, 5).
- (a) 2.55 — x₁ = 20 ÷ (2 + 5) = 20 ÷ 7 = 2.857142857. x₂ = 20 ÷ (2.857142857 + 5) = 20 ÷ 7.857142857 = 2.545454545, which rounds to 2.55. Reporting x₁ instead of x₂ gives 2.857142857, which rounds to 2.86. Dropping the +5 in the denominator, using xₙ₊₁ = 20 ÷ xₙ, gives x₁ = 20 ÷ 2 = 10 and x₂ = 20 ÷ 10 = 2, which is 2.00. A sign error in the denominator, using xₙ₊₁ = 20 ÷ (xₙ − 5), gives x₁ = 20 ÷ (2 − 5) = −6.666666667 and x₂ = 20 ÷ (−6.666666667 − 5) = −1.714285714, which rounds to −1.71.
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (a) Overestimates — trapezium edges lie above the curve. — For a concave-up curve, each chord connecting two points on the curve lies ABOVE the curve between those points, because the curve bends away from the chord underneath it. The trapezium rule uses these chords as the top edges of each trapezium, so the trapeziums cover a larger region than the true area under the curve — the estimate is an overestimate. Saying it underestimates because the edges lie below the curve gets the direction backwards: for a concave-up curve the edges lie above, not below. Saying it overestimates 'because more strips always increase it' gives the right verdict for the wrong reason — using MORE, narrower strips makes a trapezium estimate more accurate and brings it closer to the true area, it does not simply increase the total. Saying the estimate is exact ignores that straight edges cannot follow a curved line perfectly; there is always a gap between the chord and the curve on a bend, which is exactly what makes the rule an estimate rather than an exact calculation.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (b) 118 m — Width = 840 ÷ 35 = 24 m. Perimeter = 2 × (length + width) = 2 × (35 + 24) = 2 × 59 = 118 m. The option 59 m gives the sum of the length and width but forgets to double it for the perimeter. The option 70 m doubles only the length (2 × 35 = 70) and leaves out the width entirely. The option 48 m doubles only the width (2 × 24 = 48) and leaves out the length entirely.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (b) 14 m/s — Average speed for a whole journey is total distance divided by total time: 350 ÷ 25 = 14 m/s. Multiplying the distance and time instead of dividing gives 350 × 25 = 8750 m/s. Adding the distance and time instead of dividing gives 350 + 25 = 375 m/s. Inverting the division, working out time divided by distance, gives 25 ÷ 350, which rounds to 0.07 m/s.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
Build your own mix at the worksheet builder.