Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The graph of y = x² − 2x − 8 takes these values: when x = −2, y = 0; when x = −1, y = −5; when x = 0, y = −8; when x = 3, y = −5; when x = 4, y = 0. Use these values to write down the two solutions of x² − 2x − 8 = 0.y = x² − 2x − 8
- 2.A runner's journey is shown on a distance-time graph: she runs 8 km in the first hour, rests for 30 minutes with no distance gained, then runs a further 4 km in the next 30 minutes. Work out her average speed for the whole journey, in kilometres per hour.
- 3.The iterative formula xₙ₊₁ = 12 ÷ (xₙ + 2) is used repeatedly, starting from x₀ = 1. Work out the value that xₙ approaches, correct to 2 decimal places.
- 4.The point (20, 21) lies on the circle x² + y² = 841, which has centre O(0, 0). The tangent to the circle at (20, 21) crosses the x-axis at P and the y-axis at Q. Work out the area of triangle OPQ, correct to 1 decimal place.
- 5.The mean of four numbers is 12.5. Three of the numbers are 8, 15 and 19. Form an equation using n for the fourth number, and solve it to find n.
- 6.A car's journey is represented by a velocity-time graph. The total distance travelled, found from the area under the graph, is 350 metres, and the total time for the journey is 25 seconds. Work out the car's average speed for the whole journey, in m/s.
- 7.A taxi company charges a £2.50 booking fee plus £1.80 per mile. A journey costs £15.10 in total. Work out the number of miles travelled.
- 8.Work out the value of 5m² + 3m when m = −2.4
- 9.A car park charges by the hour. Parking for 1 hour costs £5, 2 hours costs £9, 3 hours costs £13 and 4 hours costs £17, with the cost increasing by the same amount for each extra hour. Work out an expression, in terms of n, for the cost, in pounds, of parking for n hours.
- 10.A company's weekly profit, P thousand pounds, when it makes x thousand items is modelled by P = x² − 8x + 12, for x ≥ 0. Work out the values of x for which the company makes a loss.
- 11.The graph of y = 60 × (0.5)ˣ is sketched for x ≥ 0. Which statement correctly describes what happens to the curve as x increases?
- 12.A speed-time graph shows a constant speed of 15 m/s for 20 seconds. Work out the distance travelled, using the area under the graph.
- 13.A plumber charges a call-out fee of £30 plus £25 for each hour worked. The total bill for a job was £130. Work out how many hours the plumber worked.
- 14.The diagram shows a distance–time graph for a cyclist travelling at a constant speed, for the first 6 minutes of a journey. Distance is in kilometres and time is in minutes. Work out how far the cyclist would travel in 20 minutes at the same speed.
- 15.A taxi firm charges a fixed fee of £3.50 plus £2.20 per mile. Work out the total cost of a journey of 6 miles.
Answer key
- (c) x = −2 or x = 4 — The solutions of x² − 2x − 8 = 0 are the x-values where y = 0. From the table, y = 0 when x = −2 and when x = 4, so those are the two solutions. Distractor origins: x = −1 or x = 3 picks the pair of x-values that give equal (but non-zero) y-values instead of y = 0; x = 0 or x = −8 mixes up an x-value with its corresponding y-value; x = −2 only reads off one of the two roots and misses the other.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (c) 2.61 — The limit L satisfies L = 12 ÷ (L + 2), so L(L + 2) = 12, giving L² + 2L − 12 = 0 and L = (−2 + √52) ÷ 2 = 2.6056, which is 2.61 to 2 decimal places (the early iterates 4, 2, 3, 2.4, 2.73, ... oscillate around this value before settling). Choosing 3.00 reads off x₃, one of the early oscillating values, before the sequence has settled close to the limit. Choosing 4.00 reads off x₁, the very first iterate, not the value the sequence approaches. Choosing 6.00 comes from writing the limit equation as L = 12 ÷ 2, leaving L itself out of the denominator.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
- (d) 8 — Since the mean of the four numbers is 12.5, their total is 4 × 12.5 = 50. The three known numbers add up to 8 + 15 + 19 = 42, so n = 50 − 42 = 8. A candidate who multiplies the mean by 3 instead of 4 gets a total of 37.5, giving n = 37.5 − 42 = −4.5. A candidate who forgets to subtract the three known numbers and gives the total itself as n states n = 50. A candidate who subtracts the mean from the total of the three known numbers instead of the other way round gets n = 42 − 12.5 = 29.5.
- (b) 14 m/s — Average speed for a whole journey is total distance divided by total time: 350 ÷ 25 = 14 m/s. Multiplying the distance and time instead of dividing gives 350 × 25 = 8750 m/s. Adding the distance and time instead of dividing gives 350 + 25 = 375 m/s. Inverting the division, working out time divided by distance, gives 25 ÷ 350, which rounds to 0.07 m/s.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (b) 2 < x < 6 — Factorise: x² − 8x + 12 = (x − 2)(x − 6), giving roots at x = 2 and x = 6. Since the coefficient of x² is positive, the graph is a U-shape that is negative, below the axis, between its roots. So P < 0 for 2 < x < 6. Distractor routes: x < 2 or x > 6 takes the region outside the roots, which is where P is positive, a profit, the opposite of a loss. 2 ≤ x ≤ 6 includes the endpoints, where P = 0 exactly, break-even rather than a loss, since the inequality is strict. −6 < x < −2 comes from factorising as (x + 2)(x + 6), reversing the sign of both roots.
- (a) It gets closer to zero but never actually reaches it. — y = 60 × (0.5)ˣ is always positive, however large x is, because a positive number raised to any power stays positive. As x increases, (0.5)ˣ gets smaller and smaller but never equals zero, so y approaches zero without ever reaching it. Believing the curve reaches zero when x = 60, because 60 is the starting value, mixes up the y-intercept with a stopping point — an exponential decay curve like this one never actually reaches the x-axis, so this is wrong. Believing the curve goes negative for large x is wrong because multiplying a positive number by (0.5) any number of times can never produce a negative result. Believing the curve levels off at y = 0.5, confusing the base of the exponential with its eventual level, is wrong: the base only controls how fast the curve falls, not where it settles — this curve settles at y = 0, not y = 0.5. Whenever you sketch an exponential decay curve, draw it approaching the x-axis but never touching it.
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (b) 10 km — Method: find the constant speed from the graph (distance ÷ time for any point on the line), then multiply that speed by 20 minutes. Working: the line passes through (4 minutes, 2 km), so the speed is 2 ÷ 4 = 0.5 km per minute; in 20 minutes the cyclist travels 0.5 × 20 = 10 km. Answer: 10 km. Distractor refutation: 3 km comes from reading off the distance shown at the end of the plotted section (6 minutes) and stopping there, instead of extending the line to 20 minutes. 20 km comes from misreading the speed as 1 km per minute instead of 0.5 km per minute, doubling the true rate. 40 km comes from dividing 20 by the speed instead of multiplying by it, a reciprocal mix-up.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
Build your own mix at the worksheet builder.