Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The iterative formula xₙ₊₁ = xₙ³ − 2 is used repeatedly, starting from x₀ = 2. Which of these describes what happens to the sequence of values as n increases?
- 2.A plumber charges a call-out fee of £30 plus £25 for each hour worked. The total bill for a job was £130. Work out how many hours the plumber worked.
- 3.The formula for the perimeter of a rectangle is P = 2(l + w). One rectangle has l = 9 cm and w = 4 cm. A second rectangle has l = 6 cm and w = 5 cm. Work out how many cm greater the perimeter of the first rectangle is than the perimeter of the second.
- 4.A cuboid has a square base of side x metres and a height that is 3 m more than x. Its volume is 150 m³. This gives the equation x³ + 3x² − 150 = 0, which can be solved using the iterative formula xₙ₊₁ = ∛(150 − 3xₙ²). Taking x₀ = 4, work out x₂ correct to 2 decimal places.
- 5.The point (9, 12) lies on the circle x² + y² = 225, which has centre (0, 0). The tangent to the circle at (9, 12) crosses the x-axis at the point P. Work out the x-coordinate of P.
- 6.A cyclist's speed-time graph is described as follows: speed increases steadily from 0 m/s to 8 m/s over the first 4 seconds, stays constant at 8 m/s for the next 6 seconds, then decreases steadily to 0 m/s over the final 2 seconds. Work out the total distance travelled.
- 7.Kai writes the expression 8 − 3x + 5x² and says it has three terms. Ryan says it only has two terms because a number on its own is not a term. Work out the correct number of terms in the expression.
- 8.A gardener charges a fixed fee of £15 plus £8 for each hour worked. The total charge, £T, for a job lasting h hours is given by T = 15 + 8h. Work out the charge for a job lasting 4 hours, and identify what kind of statement T = 15 + 8h is.
- 9.On Monday, a runner covers 15 km in 2.5 hours. On Tuesday, she covers 12 km in 1.5 hours. Using the formula speed = distance ÷ time, work out on which day she ran faster, and by how much.
- 10.Solve 2x² − 32 = 0.
- 11.f(x) = x³ − 3x − 20, and the equation f(x) = 0 has exactly one solution. Work out the pair of consecutive integers between which that solution lies.y = x
- 12.A model rocket's height is given by h = −5t² + 20t, where h is in metres and t is in seconds. A student says the graph of h against t is n-shaped. Which statement gives the correct verdict on the SHAPE and the reason that settles it from the equation?
- 13.A cyclist's distance-time graph shows the following: she travels 12 km in the first 30 minutes at a steady speed, then rests for 30 minutes, then travels a further 8 km in the next 15 minutes. Work out her average speed, in km/h, for the whole journey.
- 14.The graph of y = 20/x is drawn for x > 0. As the value of x increases, what happens to the value of y?
- 15.The point (20, 21) lies on the circle x² + y² = 841, which has centre O(0, 0). The tangent to the circle at (20, 21) crosses the x-axis at P and the y-axis at Q. Work out the area of triangle OPQ, correct to 1 decimal place.
Answer key
- (d) It diverges, growing rapidly without limit. — x₁ = 2³ − 2 = 8 − 2 = 6. x₂ = 6³ − 2 = 216 − 2 = 214. x₃ = 214³ − 2 = 9800344 − 2 = 9800342. The values 6, 214, 9800342, … grow far larger at every step, so the sequence diverges rather than settling anywhere. Checking whether the sequence converges to a fixed value near 2 fails, since the terms grow enormously instead of levelling off. Checking for a repeating pair of values also fails, since 6, 214 and 9800342 are all different, with no sign of a return to 6. x₀ = 2 is a fixed point only if 2³ − 2 = 2, but 2³ − 2 = 6, not 2, so the sequence does not stay constant.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
- (b) 4.39 — x₁ = ∛(150 − 3 × 4²) = ∛(150 − 48) = ∛102 = 4.672 (unrounded). x₂ = ∛(150 − 3 × 4.672²) = ∛(150 − 65.49) = ∛84.51 = 4.39 (2 d.p.). Choosing 4.67 stops after only one iteration, giving x₁ instead of x₂. Choosing 84.51 finds the value inside the cube root for x₂ but never takes the cube root. Choosing 6.32 comes from adding 3xₙ² instead of subtracting it inside the root, which does not match the given formula.
- (b) 25 — The tangent at (9, 12) is 9x + 12y = 225. Setting y = 0 (the x-axis): 9x = 225, so x = 25. Choosing 18.75 comes from swapping the coefficients in the tangent equation (using 12x + 9y = 225) before setting y = 0. Choosing 15 is where the circle itself meets the x-axis (from x² = 225), not where the tangent does. Choosing 9 is just the x-coordinate of the original point (9, 12), not the point P.
- (c) 72 m — The first section is a triangle with base 4 s and height 8 m/s, area = 1/2 × 4 × 8 = 16 m. The middle section is a rectangle with base 6 s and height 8 m/s, area = 6 × 8 = 48 m. The final section is a triangle with base 2 s and height 8 m/s, area = 1/2 × 2 × 8 = 8 m. Total distance = 16 + 48 + 8 = 72 m. Treating both sloping sections as full rectangles instead of triangles — forgetting the factor of a half — gives 4 × 8 + 6 × 8 + 2 × 8 = 96 m, which is wrong because a sloping speed-time section is a triangle, not a rectangle. Leaving out the final, decreasing section entirely gives 16 + 48 = 64 m, which is wrong because the cyclist is still moving and covering distance while slowing down. Leaving out the middle, constant-speed section gives 16 + 8 = 24 m, which is wrong because the cyclist covers the most distance of all during the 6 seconds of constant speed.
- (b) 3 — Method: a term is any part of an expression separated from the rest by a + or − sign, including a number on its own. Working: 8 − 3x + 5x² splits at the + and − signs into 8, −3x and 5x² — that is three separate terms. Answer: 3. Ryan's answer of 2 comes from wrongly excluding the number 8, thinking a term must contain a letter. 5 comes from miscounting by treating the coefficients and powers as separate terms as well as the letters. 1 comes from treating the whole expression as a single term because it is written without brackets.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (d) x = 4 or x = −4 — Method: divide both sides by 2 to get x² = 16, then take the square root of both sides: x = 4 or x = −4. Distractor origins: x = 4 forgets the negative root; x = 8 comes from halving 16 instead of taking its square root; x = 16 stops at x² = 16 without ever taking the square root.
- (b) 3 and 4 — Method: the graph of f(x) is continuous, so where it crosses the x-axis the value of f(x) changes sign; substitute consecutive integers until one value is negative and the next is positive. Working: f(2) = 8 − 6 − 20 = −18, f(3) = 27 − 9 − 20 = −2 and f(4) = 64 − 12 − 20 = 32. The sign changes from negative to positive between x = 3 and x = 4, so the solution lies there. Answer: 3 and 4. The distractors: 2 and 3 comes from ignoring the −3x term and solving x³ = 20, whose root is 2.71, one interval to the left; 6 and 7 comes from reading x³ as x² and solving x² − 3x − 20 = 0, whose positive root is 6.22; 4 and 5 is the interval immediately after the change of sign, named by a candidate who finds f(4) positive and quotes the interval beginning there instead of the one across which the sign actually turned.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (c) 16 km/h — Method: total distance = 12 + 8 = 20 km. Total time = 30 + 30 + 15 = 75 minutes = 1.25 hours. Average speed = total distance ÷ total time = 20 ÷ 1.25 = 16 km/h. Distractor origins: 20 km/h gives the total distance without ever dividing by the total time; 24 km/h uses only the speed of the first stage (12 km in 30 minutes), ignoring the second stage and the rest; 28 km/h averages the two separate stage speeds, 24 km/h and 32 km/h, instead of using total distance over total time.
- (b) y decreases towards zero but never reaches it — Method: as x gets larger, dividing 20 by a bigger number gives a smaller result, so y decreases; because 20/x can never be exactly zero for any positive x, the curve gets closer to zero without ever reaching it, so y decreases towards zero but never reaches it. Distractor origins: 'y increases towards a limit but never reaches it' has the relationship backwards, treating y as increasing when it is actually decreasing; 'y decreases at a steady rate and reaches zero' wrongly assumes the graph behaves like a straight line that eventually hits zero; 'y stays the same however large x becomes' wrongly assumes there is no change in y at all.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
Build your own mix at the worksheet builder.