Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Work out the value of 4p² − 3 when p = 2.5
- 2.The equation x² + 2x − 5 = 0 can be solved using the iterative formula xₙ₊₁ = 5/(xₙ + 2). The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₂ correct to 2 decimal places.
- 3.The equation x² − 4x − 1 = 0 can be solved using the iterative formula xₙ₊₁ = √(4xₙ + 1). The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₂ correct to 3 decimal places.
- 4.A ball is thrown in the air. Its height, h metres, above the ground after t seconds is given in this table: when t = 0, h = 0; when t = 1, h = 15; when t = 2, h = 20; when t = 3, h = 15; when t = 4, h = 0. Use the table to find the two times, in seconds, at which the ball is at ground level.
- 5.A cup of tea cools after being made. Its temperature-time graph is a curve. Three tangents are drawn on the graph: at t = 2 minutes the tangent has gradient −8; at t = 10 minutes the tangent has gradient −3; at t = 20 minutes the tangent has gradient −0.5. Which of these statements about the tea's cooling is correct?
- 6.The braking distance of a car, in metres, is estimated using the formula d = 0.4v² + 6, where v is the speed in mph. A car travelling at 35 mph brakes. Work out the estimated braking distance.
- 7.The formula connecting speed, distance and time is v = s ÷ t. Work out v, in km/h, when s = 180 and t = 4.
- 8.An allotment is in the shape of a rectangle. Its length is 5 m more than its width, x metres, and its area is 20 m². This gives x² + 5x − 20 = 0, which can be solved using the iterative formula xₙ₊₁ = 20 ÷ (xₙ + 5). Taking x₀ = 2, so that x₁ is the value found after the formula has been used once, work out x₂ correct to 2 decimal places.
- 9.A company's cost, in £, for producing x items is shown on a graph. The tangent to the curve at x = 50 passes through (30, 400) and (70, 800). Interpret the gradient of this tangent in the context of the company's costs.
- 10.Two numbers have a sum of 45. The larger number is 9 more than the smaller number. Form an equation using n for the smaller number, and solve it to find the larger number.
- 11.A regular hexagon has sides of length (x + 2) cm. Write down an expression, in terms of x, for the perimeter of the hexagon.
- 12.A tram sets off from a stop. Its velocity-time graph rises in a straight line from 0 m/s to 12 m/s over the first 8 seconds, then stays constant at 12 m/s for a further 10 seconds. Work out the total distance the tram travels in these 18 seconds, using the area under the graph.
- 13.The graph of W = 840 ÷ L shows how the width, W metres, of a rectangular field of area 840 m² depends on its length, L metres. Use the relationship to work out the width when the length is 35 m, and hence the perimeter of the field.
- 14.A car's journey is represented by a velocity-time graph. The total distance travelled, found from the area under the graph, is 350 metres, and the total time for the journey is 25 seconds. Work out the car's average speed for the whole journey, in m/s.
- 15.A car is decelerating. The tangent to its velocity-time graph at t = 12 seconds passes through the points (8, 22) and (16, 6), where velocity is in m/s and time is in seconds. Work out the gradient of this tangent, in m/s².
Answer key
- (c) 22 — p² means p × p. Substitute p = 2.5: p² = 6.25, so 4p² = 4 × 6.25 = 25, and 25 − 3 = 22. 97 comes from squaring 4p together instead of just p, (4 × 2.5)² − 3 = 10² − 3 = 97. 7 comes from using p instead of p², 4 × 2.5 − 3. 1 comes from squaring the 3 instead of the p, 4 × 2.5 − 3².
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (c) 3.153 — x₁ = √(4 × 1 + 1) = √5 = 2.236067977. x₂ = √(4 × 2.236067977 + 1) = √9.944271908 = 3.153453965, which rounds to 3.153. Reporting x₁ instead of x₂ gives 2.236067977, which rounds to 2.236. A sign error inside the root, using xₙ₊₁ = √(4xₙ − 1) instead of √(4xₙ + 1), gives x₁ = √3 = 1.732050808 and x₂ = √(4 × 1.732050808 − 1) = √5.928203232 = 2.434790182, which rounds to 2.435. Applying the formula in the wrong order, working out √(4xₙ) + 1 at every step instead of √(4xₙ + 1), gives x₁ = √4 + 1 = 3 and x₂ = √(4 × 3) + 1 = 4.464101615, which rounds to 4.464.
- (a) t = 0 or t = 4 — The ball is at ground level exactly when h = 0. From the table, h = 0 at t = 0 and at t = 4, so those are the two times. Distractor origins: t = 1 or t = 3 picks the times with equal (but non-zero) height instead of ground level; t = 2 picks the time of maximum height instead of ground level; t = 0 finds only the starting time and misses the second one.
- (c) Fastest at t = 2 min — steepest gradient. — The rate of cooling is given by the size (magnitude) of the gradient, ignoring its sign — the steeper the tangent, the faster the temperature is changing. Of −8, −3 and −0.5, the gradient −8 has the greatest magnitude, so the tea is cooling fastest at t = 2 minutes. 'Fastest at t = 20 min — largest gradient' confuses the signed value with the size of the rate: −0.5 is the largest NUMBER of the three, but it's the smallest in magnitude, meaning the tea is barely cooling at all by then. 'Cools at the same rate throughout' ignores that the three gradients are different sizes, not just all negative. 'Fastest at t = 10 min — the middle reading' isn't a mathematical reason at all — the gradients themselves have to be compared, not their position in the list.
- (c) 496 — d = 0.4v² + 6. First v² = 35 × 35 = 1225. Then 0.4 × 1225 = 490. Add 6: 490 + 6 = 496 m. 490 comes from forgetting to add the 6 at the end. 202 comes from squaring 0.4v together instead of squaring only v, (0.4 × 35)² + 6 = 14² + 6 = 202. 20 comes from using v instead of v², 0.4 × 35 + 6.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (a) 2.55 — x₁ = 20 ÷ (2 + 5) = 20 ÷ 7 = 2.857142857. x₂ = 20 ÷ (2.857142857 + 5) = 20 ÷ 7.857142857 = 2.545454545, which rounds to 2.55. Reporting x₁ instead of x₂ gives 2.857142857, which rounds to 2.86. Dropping the +5 in the denominator, using xₙ₊₁ = 20 ÷ xₙ, gives x₁ = 20 ÷ 2 = 10 and x₂ = 20 ÷ 10 = 2, which is 2.00. A sign error in the denominator, using xₙ₊₁ = 20 ÷ (xₙ − 5), gives x₁ = 20 ÷ (2 − 5) = −6.666666667 and x₂ = 20 ÷ (−6.666666667 − 5) = −1.714285714, which rounds to −1.71.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (a) 27 — Method: let the smaller number be n, so the larger number is n + 9. Form the equation n + (n + 9) = 45. Working: simplify: 2n + 9 = 45, so 2n = 36, giving n = 18. The larger number is 18 + 9 = 27. Answer: 27. 18 is the smaller number, found correctly, but given as the answer to the question asking for the larger number. 22.5 comes from ignoring the "9 more" part and simply halving the total, 45 ÷ 2. 36 comes from a sign error when isolating the constant, treating the equation as 2n = 45 + 9 instead of 2n = 45 − 9.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (d) 168 m — Split the area under the graph into two parts. The rising section (0 to 8 s) is a triangle: area = 0.5 × 8 × 12 = 48. The constant section, from 8 s to 18 s (10 s), is a rectangle: area = 12 × 10 = 120. Total distance = 48 + 120 = 168 m. Leaving out the 0.5 doubles the triangle, giving 8 × 12 + 120 = 216 m; ignoring the triangle section altogether gives only 120 m; averaging the start and final speeds over the whole 18 seconds, (0 + 12) ÷ 2 = 6, then 6 × 18 = 108 m, wrongly treats the tram as accelerating the whole time, when the graph is flat for the last 10 seconds.
- (b) 118 m — Width = 840 ÷ 35 = 24 m. Perimeter = 2 × (length + width) = 2 × (35 + 24) = 2 × 59 = 118 m. The option 59 m gives the sum of the length and width but forgets to double it for the perimeter. The option 70 m doubles only the length (2 × 35 = 70) and leaves out the width entirely. The option 48 m doubles only the width (2 × 24 = 48) and leaves out the length entirely.
- (b) 14 m/s — Average speed for a whole journey is total distance divided by total time: 350 ÷ 25 = 14 m/s. Multiplying the distance and time instead of dividing gives 350 × 25 = 8750 m/s. Adding the distance and time instead of dividing gives 350 + 25 = 375 m/s. Inverting the division, working out time divided by distance, gives 25 ÷ 350, which rounds to 0.07 m/s.
- (a) −2 m/s² — The gradient of a line through two points is the change in the y-value divided by the change in the x-value: (6 − 22)/(16 − 8) = −16/8 = −2 m/s². The negative sign confirms the deceleration mentioned in the question. Writing 2 m/s² comes from subtracting the velocities in the wrong order, using (22 − 6) instead of (6 − 22), which loses the sign that shows the car is slowing down. Writing −0.5 m/s² comes from inverting the fraction, dividing the change in time by the change in velocity instead of the other way round. Writing −16 m/s² comes from finding the change in velocity, −16, but forgetting to divide by the change in time, 8 seconds.
Build your own mix at the worksheet builder.