Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Look at the statement 2x + 5 = 17. Considering whether it is an expression, an equation, a formula, or an identity, which classification is correct?
- 2.A distance-time graph is a straight line from (0, 0) to (4, 100), where time is in hours and distance is in kilometres. Work out the gradient of the line.
- 3.A student uses the iterative formula xₙ₊₁ = √(7xₙ + 3) to find an approximate solution of an equation. Work out which equation this iterative formula solves.
- 4.A car is decelerating. The tangent to its velocity-time graph at t = 12 seconds passes through the points (8, 22) and (16, 6), where velocity is in m/s and time is in seconds. Work out the gradient of this tangent, in m/s².
- 5.A graph shows the total monthly cost of a mobile phone tariff against the number of minutes of calls. The line starts at £12 and stays level until 200 minutes, then rises by 5p for each further minute of calls. Use the graph to work out the total cost of a month in which 250 minutes of calls are made.
- 6.A park is drawn on a grid in which 1 unit represents 1 km. The car park is at the point (0, 0) and the lake is at the point (3, 5). Work out the direct distance, in km, from the car park to the lake, giving your answer to 1 decimal place.
- 7.Explain why the equation 4x + 3 = 4x + 10 has no solution for x.
- 8.A regular hexagon has sides of length (x + 2) cm. Write down an expression, in terms of x, for the perimeter of the hexagon.
- 9.Four sequences are shown below. Sequence P: 4, 8, 16, 32, ... Sequence Q: 4, 8, 12, 16, ... Sequence R: 4, 7, 12, 19, ... Sequence S: 4, 9, 16, 25, ... Work out which of the sequences P, Q, R and S is geometric.
- 10.A ball's height, h metres, t seconds after being thrown follows h = (t − 1)(9 − t). Given that the ball is at ground level at t = 1 and t = 9, work out at what time t the ball reaches its maximum height, using symmetry.
- 11.A car park charges by the hour. Parking for 1 hour costs £5, 2 hours costs £9, 3 hours costs £13 and 4 hours costs £17, with the cost increasing by the same amount for each extra hour. Work out an expression, in terms of n, for the cost, in pounds, of parking for n hours.
- 12.The point (20, 21) lies on the circle x² + y² = 841, which has centre O(0, 0). The tangent to the circle at (20, 21) crosses the x-axis at P and the y-axis at Q. Work out the area of triangle OPQ, correct to 1 decimal place.
- 13.A mobile phone tariff charges a fixed £15 plus 20p for every minute of calls made, so the total monthly charge, £C, for m minutes of calls is given by C = 15 + 0.2m. In a month where Ali's charge was £46.60, work out how many minutes of calls he made.
- 14.A taxi company charges a £2.50 booking fee plus £1.80 per mile. A journey costs £15.10 in total. Work out the number of miles travelled.
- 15.A car's speed, in m/s, during a journey is: 0 at t = 0 s, 8 at t = 4 s, and 8 (constant) from t = 4 s to t = 10 s, increasing at a constant rate between t = 0 and t = 4. Estimate the total distance the car travels, using the areas of a triangle and a rectangle.
Answer key
- (d) An equation, true for one value of x — 2x + 5 = 17 is only true when x = 6, so it is an equation. A candidate who ignores the equals sign and focuses only on the x terms and numbers present picks the expression option. A candidate who sees an equals sign and assumes it must relate two different quantities, as a formula does, picks that option, missing that there is only one quantity, x, involved here. A candidate who wrongly checks whether both sides look similar in structure rather than testing specific values picks the identity option, missing that the two sides are not equal for every value of x.
- (a) 25 — Gradient = change in y ÷ change in x = (100 − 0) ÷ (4 − 0) = 100 ÷ 4 = 25. Dividing time by distance instead of distance by time gives 0.04; multiplying the two values instead of dividing gives 400; stopping at the change in distance, 100, forgets to divide by the change in time.
- (d) x² − 7x − 3 = 0 — Method: an iteration settles where the next value equals the one before it, so both can be written as the same letter x; replace every xₙ by x, square both sides to clear the square root, and collect all the terms on one side. Working: x = √(7x + 3) gives x² = 7x + 3 on squaring both sides; subtracting 7x and 3 from both sides gives x² − 7x − 3 = 0. Answer: x² − 7x − 3 = 0. The distractors: x² + 7x − 3 = 0 moves the 7x across the equals sign without changing its sign; x² − 7x + 3 = 0 makes that same slip on the constant instead, leaving the 3 positive as it crosses; x² − 7x − 9 = 0 squares the expression term by term, squaring the 3 to give 9 as though squaring √(7x + 3) gave 7x + 9, which is the (a + b)² = a² + b² mistake dressed as a square root.
- (a) −2 m/s² — The gradient of a line through two points is the change in the y-value divided by the change in the x-value: (6 − 22)/(16 − 8) = −16/8 = −2 m/s². The negative sign confirms the deceleration mentioned in the question. Writing 2 m/s² comes from subtracting the velocities in the wrong order, using (22 − 6) instead of (6 − 22), which loses the sign that shows the car is slowing down. Writing −0.5 m/s² comes from inverting the fraction, dividing the change in time by the change in velocity instead of the other way round. Writing −16 m/s² comes from finding the change in velocity, −16, but forgetting to divide by the change in time, 8 seconds.
- (a) £14.50 — Method: the first 200 minutes are already covered by the £12, so only 250 − 200 = 50 minutes are charged extra. Extra charge = 50 × £0.05 = £2.50. Total cost = £12 + £2.50 = £14.50. Distractor origins: £24.50 charges 5p for all 250 minutes instead of only the 50 minutes over 200 (250 × £0.05 = £12.50, plus £12 = £24.50); £12.50 makes that same slip of charging all 250 minutes but then forgets to add the £12 monthly fee; £13.50 works out 250 − 200 wrongly as 30 extra minutes instead of 50 (30 × £0.05 = £1.50, plus £12 = £13.50).
- (a) 5.8 — The horizontal distance is 3 and the vertical distance is 5, so using Pythagoras' theorem the distance is √(3² + 5²) = √34 = 5.8 (1 d.p.). A candidate who adds the two differences instead of using Pythagoras gets 3 + 5 = 8.0. A candidate who works out 3² + 5² = 34 but forgets to take the square root gets 34.0. A candidate who subtracts the squares instead of adding them gets √(5² − 3²) = √16 = 4.0.
- (a) Subtracting 4x gives 3 = 10, which is never true. — Method: try to solve the equation as normal and see what happens. Working: subtract 4x from both sides: 4x + 3 − 4x = 4x + 10 − 4x, giving 3 = 10. This statement is false for every value of x, so the equation has no solution. Answer: subtracting 4x gives 3 = 10, which is never true. "x would have to be negative" invents a constraint on x that the equation never states. "It's true for every x" confuses this equation with an identity, where both sides would simplify to the same expression. "x = 7" misreads the false statement 3 = 10 as something to solve for x, rather than recognising it means no solution exists.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (c) P — Sequence P has a common ratio of 2 (4 × 2 = 8, 8 × 2 = 16, 16 × 2 = 32), so it is geometric. Sequence Q has a common difference of 4, which is arithmetic, not geometric — a candidate who confuses a constant difference with a constant ratio picks Q. Sequence R has increasing differences of 3, 5, 7, a quadratic sequence, not geometric — a candidate who assumes any fast-growing sequence must be geometric picks R. Sequence S is the square numbers from 2² onwards (2², 3², 4², 5²), which is also quadratic, not geometric — a candidate who thinks squaring always means geometric growth picks S.
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
- (b) 158 minutes — Rearranging C = 15 + 0.2m for m: subtract 15 from both sides to get C − 15 = 0.2m, then divide by 0.2: m = (C − 15)/0.2. Substituting C = 46.60: m = (46.60 − 15)/0.2 = 31.60/0.2 = 158. Answering 233 minutes comes from dividing the whole £46.60 by 0.2 without first taking off the £15 fixed charge. Answering 308 minutes comes from adding the £15 instead of subtracting it: (46.60 + 15)/0.2. Answering 218 minutes divides first and subtracts 15 afterwards, in the wrong order: 46.60/0.2 − 15 = 233 − 15 = 218. Ali made 158 minutes of calls.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
- (c) 64 m — The distance travelled is the area under the speed-time graph. From t = 0 to t = 4, the shape is a triangle with base 4 and height 8, area 1/2 × 4 × 8 = 16. From t = 4 to t = 10, the shape is a rectangle with base 6 and height 8, area 6 × 8 = 48. Total distance: 16 + 48 = 64 m. Treating the whole 10 seconds as a single trapezium with parallel sides 0 and 8 and width 10, instead of splitting it into the triangle and rectangle, gives 40 m. Ignoring the acceleration phase completely and assuming the car travels at a constant 8 m/s for all 10 seconds gives 8 × 10 = 80 m. Misreading the second interval as running from t = 4 to t = 8 instead of t = 4 to t = 10 gives a rectangle area of 4 × 8 = 32, plus the correct triangle of 16, totalling 48 m.
Build your own mix at the worksheet builder.