Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The mean of four numbers is 12.5. Three of the numbers are 8, 15 and 19. Form an equation using n for the fourth number, and solve it to find n.
- 2.A car's journey is represented by a velocity-time graph. The total distance travelled, found from the area under the graph, is 350 metres, and the total time for the journey is 25 seconds. Work out the car's average speed for the whole journey, in m/s.
- 3.A recipe gives the cooking time, in minutes, for a chicken as T = 40m + 20, where m is the mass in kg. A chicken has a mass of 1.8 kg. Work out the cooking time in hours and minutes.
- 4.Solve the inequality 6.3x + 1.8 ≤ 40. Hence write down the greatest number with exactly one decimal place that satisfies the inequality.
- 5.The table shows the speed, in m/s, of a cyclist at times, in seconds, 1 second apart: 0 at t = 0, 7 at t = 1, 12 at t = 2, 15 at t = 3, 16 at t = 4, 14 at t = 5, 9 at t = 6. Using the trapezium rule with strip width 1 second, estimate the distance the cyclist travels between t = 2 and t = 5 only.
- 6.A school trip costs a £15 deposit plus £9 per student for the coach. The total cost for a class is £186. Work out how many students went on the trip.
- 7.A stack of firewood has 3 logs in the top layer. Each layer below has 4 more logs than the layer above it. Work out the number of logs in the 6th layer from the top.
- 8.The graph of P = 480 ÷ V shows how the pressure, P pascals, of a gas depends on its volume, V cm³, at constant temperature. Use the relationship to work out the volume when the pressure is 32 pascals, and then work out by how much the volume increases when the pressure drops to 24 pascals.
- 9.A gardener charges a fixed fee of £15 plus £8 for each hour worked. The total charge, £T, for a job lasting h hours is given by T = 15 + 8h. Work out the charge for a job lasting 4 hours, and identify what kind of statement T = 15 + 8h is.
- 10.Work out the value of 5m² + 3m when m = −2.4
- 11.The formula connecting distance (d), speed (s) and time (t) is d = st. Make s the subject of the formula.
- 12.The tangent to a curve at the point where x = 4 passes through the points (2, 5) and (6, 21). Use these two points to estimate the gradient of the curve at x = 4.
- 13.The graph of y = 60 × (0.5)ˣ is sketched for x ≥ 0. Which statement correctly describes what happens to the curve as x increases?
- 14.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 15.The table shows the rate at which water flows from a tank, in litres per minute, over a 6-minute period: 12 at t = 0 min, 12 at t = 2 min, 3 at t = 5 min, and 0 at t = 6 min. Between t = 0 and t = 2 the rate is constant. Between t = 2 and t = 5, and between t = 5 and t = 6, the rate decreases at a constant rate in each section. Estimate the total volume of water that has flowed out, using the areas of a rectangle and two trapeziums.
Answer key
- (d) 8 — Since the mean of the four numbers is 12.5, their total is 4 × 12.5 = 50. The three known numbers add up to 8 + 15 + 19 = 42, so n = 50 − 42 = 8. A candidate who multiplies the mean by 3 instead of 4 gets a total of 37.5, giving n = 37.5 − 42 = −4.5. A candidate who forgets to subtract the three known numbers and gives the total itself as n states n = 50. A candidate who subtracts the mean from the total of the three known numbers instead of the other way round gets n = 42 − 12.5 = 29.5.
- (b) 14 m/s — Average speed for a whole journey is total distance divided by total time: 350 ÷ 25 = 14 m/s. Multiplying the distance and time instead of dividing gives 350 × 25 = 8750 m/s. Adding the distance and time instead of dividing gives 350 + 25 = 375 m/s. Inverting the division, working out time divided by distance, gives 25 ÷ 350, which rounds to 0.07 m/s.
- (d) 1 hour 32 minutes — T = 40 × 1.8 + 20 = 72 + 20 = 92 minutes. Since 92 = 60 + 32, the cooking time is 1 hour 32 minutes. A candidate who rounds the mass to 2 kg before substituting gets 40 × 2 + 20 = 100 minutes = 1 hour 40 minutes. A candidate who forgets to add the 20 minutes gets 40 × 1.8 = 72 minutes = 1 hour 12 minutes. A candidate who multiplies the mass by (40 + 20) = 60 instead of substituting into the formula gets 1.8 × 60 = 108 minutes = 1 hour 48 minutes.
- (d) 6.0 — Subtract 1.8 from both sides: 6.3x ≤ 38.2. Divide both sides by 6.3: x ≤ 6.0634… . The question asks for the greatest value to 1 decimal place that still satisfies the inequality. Testing 6.1: 6.3 × 6.1 + 1.8 = 40.23, which is more than 40, so 6.1 fails. Testing 6.0: 6.3 × 6.0 + 1.8 = 39.6, which is no more than 40, so 6.0 works and is the greatest such value. A candidate who simply rounds 6.0634… to 1 decimal place answers 6.1, without checking that it satisfies the inequality. A candidate who adds 1.8 instead of subtracting works out 41.8 ÷ 6.3 and answers 6.6. A candidate who forgets the 1.8 altogether divides 40 by 6.3 and answers 6.3.
- (d) 44 m — The trapezium rule between t = 2 and t = 5 uses only the speeds at t = 2, 3, 4 and 5 — 12, 15, 16 and 14 — with three strips of width 1: adding the first and last readings and twice the sum of the middle readings gives 12 + 14 + 2 × (15 + 16) = 88, and half of that is 44 m. Writing 68.5 m comes from applying the trapezium rule to the whole table, from t = 0 to t = 6, instead of restricting it to the interval t = 2 to t = 5 that the question asks for. Writing 28.5 m comes from forgetting to double the two middle readings, 15 and 16, in the trapezium rule formula. Writing 39 m comes from averaging only the first and last speeds in the interval, 12 and 14, and multiplying by the 3-second interval, ignoring the readings at t = 3 and t = 4 in between.
- (c) 19 — Method: set up the equation 15 + 9n = 186, then subtract the deposit and divide by the cost per student. Working: 9n = 186 − 15 = 171; n = 171 ÷ 9 = 19. Answer: 19 students. 20.67 comes from dividing the whole £186 by £9 without first subtracting the deposit: 186 ÷ 9 ≈ 20.67. 11.8 comes from swapping the two amounts round, subtracting £9 and dividing by £15: (186 − 9) ÷ 15 = 11.8. 22.33 comes from adding the deposit instead of subtracting it: (186 + 15) ÷ 9 ≈ 22.33.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (b) 5 cm³ — When P = 32, V = 480 ÷ 32 = 15 cm³. When P = 24, V = 480 ÷ 24 = 20 cm³. The increase in volume is 20 − 15 = 5 cm³. Giving only the second volume, 20 cm³, forgets to subtract the first volume. Giving only the first volume, 15 cm³, answers the wrong part of the question. Subtracting the two pressures instead of the two volumes, 32 − 24 = 8, mixes up which quantity the question asks for.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (b) s = d / t — Method: undo the multiplication by t by dividing both sides by t. Working: d = st, so dividing both sides by t gives s = d / t. The value s = dt comes from multiplying by t instead of dividing. The value s = t / d comes from inverting the fraction, dividing t by d instead of d by t. The value s = d − t comes from subtracting t instead of dividing by it.
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (a) It gets closer to zero but never actually reaches it. — y = 60 × (0.5)ˣ is always positive, however large x is, because a positive number raised to any power stays positive. As x increases, (0.5)ˣ gets smaller and smaller but never equals zero, so y approaches zero without ever reaching it. Believing the curve reaches zero when x = 60, because 60 is the starting value, mixes up the y-intercept with a stopping point — an exponential decay curve like this one never actually reaches the x-axis, so this is wrong. Believing the curve goes negative for large x is wrong because multiplying a positive number by (0.5) any number of times can never produce a negative result. Believing the curve levels off at y = 0.5, confusing the base of the exponential with its eventual level, is wrong: the base only controls how fast the curve falls, not where it settles — this curve settles at y = 0, not y = 0.5. Whenever you sketch an exponential decay curve, draw it approaching the x-axis but never touching it.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (a) 48 litres — Split the area into three sections. The rectangle (t = 0 to 2) has area 2 × 12 = 24. The first trapezium (t = 2 to 5, parallel sides 12 and 3, width 3) has area 1/2 × (12 + 3) × 3 = 22.5. The second trapezium (t = 5 to 6, parallel sides 3 and 0, width 1) has area 1/2 × (3 + 0) × 1 = 1.5. Total volume: 24 + 22.5 + 1.5 = 48 litres. Forgetting the rectangle and adding only the two trapeziums gives 22.5 + 1.5 = 24 litres. Using a single trapezium across the whole 6 minutes, with parallel sides 12 and 0, ignoring that the first 2 minutes are constant, gives 1/2 × (12 + 0) × 6 = 36 litres. Correctly finding the rectangle and the first trapezium but forgetting to halve the second trapezium, using (3 + 0) × 1 = 3 instead of 1.5, gives 24 + 22.5 + 3 = 49.5 litres.
Build your own mix at the worksheet builder.