Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The mass of a chemical sample decays by 15% every hour. It starts at 500 g. Work out the mass remaining after 3 hours, correct to 1 decimal place.
- 2.The graph of y = 20/x is drawn for x > 0. As the value of x increases, what happens to the value of y?
- 3.A phone plan costs a fixed £15 per month plus 8p per minute of calls. In one month, Jamal's bill was £23.80. Form an equation using m for the number of minutes, and solve it to find how many minutes Jamal used that month.
- 4.The equation x² − x − 6 = 0 has roots x = 3 and x = −2. It can be rearranged as xₙ₊₁ = xₙ² − 6. This formula is used with starting value x₀ = 2.9, close to the root x = 3. Work out what happens to the sequence of values as n increases.
- 5.A tram travels between two stops. Its velocity-time graph consists of straight line segments joining the points (0, 0), (5, 20), (12, 20), (16, 4) and (20, 4), where time is in seconds and velocity is in m/s. Work out the average speed of the tram over the whole 20 seconds. Give your answer to 1 decimal place.
- 6.The diagram shows a distance–time graph for a cyclist travelling at a constant speed, for the first 6 minutes of a journey. Distance is in kilometres and time is in minutes. Work out how far the cyclist would travel in 20 minutes at the same speed.
- 7.A parcel delivery company's cost graph shows the following: the cost is a flat £5 for parcels weighing up to 2 kg, and then rises by £2 for each additional kg above 2 kg. Use the graph to work out the weight of a parcel that costs £17.
- 8.A company's weekly profit, in £, is modelled by y = f(x), where x is the number of weeks since launch. The graph of y = f(x) has a maximum at (10, 45000). A rival company uses the same marketing strategy but starts trading 6 weeks later and has fixed costs £8000 higher every week, so its profit is modelled by y = f(x − 6) − 8000. In which week does the rival's maximum weekly profit occur, and what is it?
- 9.A rectangle has length (2x + 5) cm and width (x − 2) cm. Work out an expression, in terms of x, for the perimeter of the rectangle. Give your answer in its simplest form.
- 10.The equation x³ + 4x − 9 = 0 is to be solved by iteration. Work out which one of these iterative formulas comes from a correct rearrangement of that equation.
- 11.The equation x² − 3x − 7 = 0 can be solved using the iterative formula xₙ₊₁ = √(3xₙ + 7). The starting value is x₀ = 4, so x₁ is the value after the formula has been used once. Work out x₃ correct to 3 decimal places.
- 12.A ball is thrown in the air. Its height, h metres, above the ground after t seconds is given in this table: when t = 0, h = 0; when t = 1, h = 15; when t = 2, h = 20; when t = 3, h = 15; when t = 4, h = 0. Use the table to find the two times, in seconds, at which the ball is at ground level.
- 13.A student uses the iterative formula xₙ₊₁ = √(7xₙ + 3) to find an approximate solution of an equation. Work out which equation this iterative formula solves.
- 14.The equation 7x = x² + 3 can be solved using the iterative formula xₙ₊₁ = (xₙ² + 3) ÷ 7. Taking x₀ = 0.4, x₁ = 0.4514 correct to 4 decimal places. Using the full unrounded value of x₁, work out x₂ correct to 3 decimal places.
- 15.A graph shows the total monthly cost of a mobile phone tariff against the number of minutes of calls. The line starts at £12 and stays level until 200 minutes, then rises by 5p for each further minute of calls. Use the graph to work out the total cost of a month in which 250 minutes of calls are made.
Answer key
- (c) 307.1 g — The multiplier for one hour is 1 − 0.15 = 0.85. After 3 hours the mass is 500 × 0.85³. Since 0.85 × 0.85 = 0.7225 and 0.85 × 0.7225 = 0.614125, the mass is 500 × 0.614125 = 307.0625 g, which rounds to 307.1 g. Stopping after only 2 hours instead of 3 gives 500 × 0.7225 = 361.25 g, which rounds to 361.3 g — wrong, because the question asks for 3 hours, not 2. Treating the decay as simple (15% × 3 = 45% lost in total, applied once) gives 500 × 0.55 = 275.0 g, which is wrong because the decay compounds hour by hour rather than adding up. Working out the AMOUNT LOST instead of the mass remaining gives 500 − 307.0625 = 192.9375 g, which rounds to 192.9 g — wrong, because the question asks what remains, not what has decayed away. Whenever a percentage decreases repeatedly, multiply by the same factor each period rather than adding the percentages together.
- (b) y decreases towards zero but never reaches it — Method: as x gets larger, dividing 20 by a bigger number gives a smaller result, so y decreases; because 20/x can never be exactly zero for any positive x, the curve gets closer to zero without ever reaching it, so y decreases towards zero but never reaches it. Distractor origins: 'y increases towards a limit but never reaches it' has the relationship backwards, treating y as increasing when it is actually decreasing; 'y decreases at a steady rate and reaches zero' wrongly assumes the graph behaves like a straight line that eventually hits zero; 'y stays the same however large x becomes' wrongly assumes there is no change in y at all.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (c) The sequence diverges, moving away from x = 3 — Starting from x₀ = 2.9: x₁ = 2.9² − 6 = 2.41, x₂ = 2.41² − 6 = −0.19, x₃ = (−0.19)² − 6 = −5.96, x₄ = (−5.96)² − 6 = 29.56 — the values swing away from 3 and grow rapidly, so the sequence diverges rather than settling anywhere. Choosing 'settles towards x = 3' assumes that starting close to a root is enough for a rearrangement to converge to it, which is not always true — this rearrangement changes values too steeply near x = 3 to stay there. Choosing 'settles towards x = −2' assumes a diverging sequence must eventually land on the other root; instead it runs away to increasingly large values. Choosing 'stays constant at 2.9' ignores that applying the formula changes the value at every step.
- (b) 12.7 m/s — Find the total distance from the area under the graph, then divide by the total time. Break the graph into its four straight sections: a triangle from (0, 0) to (5, 20), where 5 × 20 = 100 gives an area of 50 m when halved; a rectangle from (5, 20) to (12, 20), area 7 × 20 = 140 m; a trapezium from (12, 20) to (16, 4), where (20 + 4) × 4 = 96 gives an area of 48 m when halved; and a rectangle from (16, 4) to (20, 4), area 4 × 4 = 16 m — a total distance of 50 + 140 + 48 + 16 = 254 m. Dividing by the 20 seconds gives an average speed of 254 ÷ 20 = 12.7 m/s. Writing 15.1 m/s comes from forgetting to halve the trapezium area for the third section, using 96 instead of 48: a total of 302 m, and 302 ÷ 20 = 15.1 m/s. Writing 11.9 m/s comes from leaving out the final section, from (16, 4) to (20, 4), entirely: a total of 238 m, and 238 ÷ 20 = 11.9 m/s. Writing 12.1 m/s comes from dividing the correct total distance by 21 instead of 20 — a fencepost slip, counting the whole seconds from t = 0 to t = 20 inclusive as 21 seconds of travel rather than reading the journey as a duration of 20 seconds: 254 ÷ 21 = 12.1 m/s (1 d.p.).
- (b) 10 km — Method: find the constant speed from the graph (distance ÷ time for any point on the line), then multiply that speed by 20 minutes. Working: the line passes through (4 minutes, 2 km), so the speed is 2 ÷ 4 = 0.5 km per minute; in 20 minutes the cyclist travels 0.5 × 20 = 10 km. Answer: 10 km. Distractor refutation: 3 km comes from reading off the distance shown at the end of the plotted section (6 minutes) and stopping there, instead of extending the line to 20 minutes. 20 km comes from misreading the speed as 1 km per minute instead of 0.5 km per minute, doubling the true rate. 40 km comes from dividing 20 by the speed instead of multiplying by it, a reciprocal mix-up.
- (b) 8 kg — The cost above the flat £5 charge is 17 − 5 = £12. At £2 per kg, this covers 12 ÷ 2 = 6 kg above the first 2 kg, so the total weight is 2 + 6 = 8 kg. Dividing the full £17 by £2 per kg without first taking off the £5 flat charge gives 17 ÷ 2 = 8.5 kg. Taking off the £5 flat charge and dividing by £2 per kg, but forgetting to add back the 2 kg that the flat charge covers, gives 12 ÷ 2 = 6 kg. Taking off £2 instead of £5 as the flat charge, (17 − 2) ÷ 2 = 7.5 kg, swaps which number is the fixed fee.
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (b) 6x + 6 — Perimeter = 2[(2x + 5) + (x − 2)] = 2(3x + 3) = 6x + 6. A candidate who adds the length and width but forgets to double for the perimeter gets 3x + 3. A candidate who makes a sign error and adds 2 instead of subtracting it before doubling gets 2[(2x + 5) + (x + 2)] = 6x + 14. A candidate who multiplies the length and width instead of adding them, confusing the perimeter formula with the area formula, and then doubles that product, gets 2(2x + 5)(x − 2) = 4x² + 2x − 20.
- (c) xₙ₊₁ = ∛(9 − 4xₙ) — Method: a formula xₙ₊₁ = f(xₙ) is a correct rearrangement when the equation x = f(x) turns back into the equation you started with, so rearrange x³ + 4x − 9 = 0 by making the cube the subject. Working: x³ + 4x − 9 = 0 gives x³ = 9 − 4x, because the 4x and the 9 each change sign as they cross the equals sign; taking the cube root of both sides gives x = ∛(9 − 4x), which is the formula xₙ₊₁ = ∛(9 − 4xₙ). Answer: xₙ₊₁ = ∛(9 − 4xₙ). The distractors: ∛(9 + 4xₙ) comes from writing x³ = 9 + 4x, moving the 4x across the equals sign without changing its sign; (9 + xₙ³)/4 comes from making the linear term the subject but keeping the sign of the cube, writing 4x = 9 + x³ when the equation gives 4x = 9 − x³; ∛(9 − 4xₙ³) cubes the x in the linear term as well, changing a term the original equation never cubed.
- (d) 4.521 — x₁ = √(3 × 4 + 7) = √19 = 4.358898944. x₂ = √(3 × 4.358898944 + 7) = √20.076696833 = 4.480702716. x₃ = √(3 × 4.480702716 + 7) = √20.442108148 = 4.521294964, which rounds to 4.521. Mislabelling the starting value x₀ as x₁, so that the working stops one iteration too early, reports the true x₂ = 4.480702716, which rounds to 4.481. Working out one iteration too many reports the true x₄ = √(3 × 4.521294964 + 7) = 4.534741987, which rounds to 4.535. Applying the formula in the wrong order, calculating √(3xₙ) + 7 at every step instead of √(3xₙ + 7), gives, from x₀ = 4: √12 + 7 = 10.464101615, then √(3 × 10.464101615) + 7 = 12.602883619, then √(3 × 12.602883619) + 7 = 13.148873950, which rounds to 13.149.
- (a) t = 0 or t = 4 — The ball is at ground level exactly when h = 0. From the table, h = 0 at t = 0 and at t = 4, so those are the two times. Distractor origins: t = 1 or t = 3 picks the times with equal (but non-zero) height instead of ground level; t = 2 picks the time of maximum height instead of ground level; t = 0 finds only the starting time and misses the second one.
- (d) x² − 7x − 3 = 0 — Method: an iteration settles where the next value equals the one before it, so both can be written as the same letter x; replace every xₙ by x, square both sides to clear the square root, and collect all the terms on one side. Working: x = √(7x + 3) gives x² = 7x + 3 on squaring both sides; subtracting 7x and 3 from both sides gives x² − 7x − 3 = 0. Answer: x² − 7x − 3 = 0. The distractors: x² + 7x − 3 = 0 moves the 7x across the equals sign without changing its sign; x² − 7x + 3 = 0 makes that same slip on the constant instead, leaving the 3 positive as it crosses; x² − 7x − 9 = 0 squares the expression term by term, squaring the 3 to give 9 as though squaring √(7x + 3) gave 7x + 9, which is the (a + b)² = a² + b² mistake dressed as a square root.
- (b) 0.458 — x₁ = (0.4² + 3) ÷ 7 = 3.16 ÷ 7 = 0.4514 (unrounded, 0.451428...). x₂ = (x₁² + 3) ÷ 7 = (0.2038 + 3) ÷ 7 = 3.2038 ÷ 7 = 0.458 (3 d.p.). Choosing 0.632 divides only the 3 by 7 instead of dividing the whole sum x₁² + 3 by 7. Choosing 0.451 repeats the calculation for x₁ instead of moving on to x₂. Choosing 0.493 uses x₁ itself instead of x₁² inside the formula.
- (a) £14.50 — Method: the first 200 minutes are already covered by the £12, so only 250 − 200 = 50 minutes are charged extra. Extra charge = 50 × £0.05 = £2.50. Total cost = £12 + £2.50 = £14.50. Distractor origins: £24.50 charges 5p for all 250 minutes instead of only the 50 minutes over 200 (250 × £0.05 = £12.50, plus £12 = £24.50); £12.50 makes that same slip of charging all 250 minutes but then forgets to add the £12 monthly fee; £13.50 works out 250 − 200 wrongly as 30 extra minutes instead of 50 (30 × £0.05 = £1.50, plus £12 = £13.50).
Build your own mix at the worksheet builder.