Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The tangent to a curve at the point where x = 4 passes through the points (2, 5) and (6, 21). Use these two points to estimate the gradient of the curve at x = 4.
- 2.A tree is 2 metres tall. Each year its height increases by 10% of its height at the start of that year. Work out the height of the tree after 3 years, giving your answer to 1 decimal place.
- 3.A runner's journey is shown on a distance-time graph: she runs 8 km in the first hour, rests for 30 minutes with no distance gained, then runs a further 4 km in the next 30 minutes. Work out her average speed for the whole journey, in kilometres per hour.
- 4.A tram sets off from a stop. Its velocity-time graph rises in a straight line from 0 m/s to 12 m/s over the first 8 seconds, then stays constant at 12 m/s for a further 10 seconds. Work out the total distance the tram travels in these 18 seconds, using the area under the graph.
- 5.A bath is filled with water; the graph of volume (litres) against time (minutes) is a curve, since the flow rate changes. The tangent to the curve at t = 10 minutes passes through the points (8, 130) and (12, 190), and the volume in the bath at t = 10 minutes is 160 litres. Use the gradient of this tangent to estimate the volume in the bath 5 minutes after t = 10 minutes.
- 6.A cyclist's speed rises from rest to a maximum — quickly at first, then more and more slowly — so her speed-time graph is a curve that is concave down (its gradient decreases as time goes on). A trapezium estimate is made for the distance travelled during this phase, using two points on the curve. Is the trapezium estimate an overestimate or an underestimate of the true distance, and why?
- 7.A distance-time graph is a straight line from (0, 0) to (4, 100), where time is in hours and distance is in kilometres. Work out the gradient of the line.
- 8.A company's weekly profit, in £, is modelled by y = f(x), where x is the number of weeks since launch. The graph of y = f(x) has a maximum at (10, 45000). A rival company uses the same marketing strategy but starts trading 6 weeks later and has fixed costs £8000 higher every week, so its profit is modelled by y = f(x − 6) − 8000. In which week does the rival's maximum weekly profit occur, and what is it?
- 9.A car park charges by the hour. Parking for 1 hour costs £5, 2 hours costs £9, 3 hours costs £13 and 4 hours costs £17, with the cost increasing by the same amount for each extra hour. Work out an expression, in terms of n, for the cost, in pounds, of parking for n hours.
- 10.The equation x³ − 2x − 7 = 0 has exactly one solution. It can be found using the iterative formula xₙ₊₁ = ∛(2xₙ + 7), with starting value x₀ = 2, so that x₁ is the value after the formula has been used once. Work out the solution correct to 2 decimal places, iterating until two consecutive values round to the same 2 decimal places.
- 11.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 12.A student uses the iterative formula xₙ₊₁ = √(7xₙ + 3) to find an approximate solution of an equation. Work out which equation this iterative formula solves.
- 13.An allotment is in the shape of a rectangle. Its length is 5 m more than its width, x metres, and its area is 20 m². This gives x² + 5x − 20 = 0, which can be solved using the iterative formula xₙ₊₁ = 20 ÷ (xₙ + 5). Taking x₀ = 2, so that x₁ is the value found after the formula has been used once, work out x₂ correct to 2 decimal places.
- 14.The equation x² + 2x − 5 = 0 can be solved using the iterative formula xₙ₊₁ = 5/(xₙ + 2). The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₂ correct to 2 decimal places.
- 15.A plumber charges a call-out fee of £30 plus £25 per hour worked. Work out the total charge for a job that takes 3 hours.
Answer key
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (d) 2.7 — The height after 3 years of 10% compound growth is 2 × 1.1³ = 2.662 m, which rounds to 2.7 m. A candidate who adds 10% of the original height (0.2 m) in each of the 3 years, instead of compounding on the new height each time, would reach 2 + 3×0.2 = 2.6 m. A candidate who compounds for only 2 years would reach 2 × 1.1² = 2.42 m, rounding to 2.4 m. A candidate who compounds for 4 years instead of 3 would reach 2 × 1.1⁴ = 2.928 m, rounding to 2.9 m.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (d) 168 m — Split the area under the graph into two parts. The rising section (0 to 8 s) is a triangle: area = 0.5 × 8 × 12 = 48. The constant section, from 8 s to 18 s (10 s), is a rectangle: area = 12 × 10 = 120. Total distance = 48 + 120 = 168 m. Leaving out the 0.5 doubles the triangle, giving 8 × 12 + 120 = 216 m; ignoring the triangle section altogether gives only 120 m; averaging the start and final speeds over the whole 18 seconds, (0 + 12) ÷ 2 = 6, then 6 × 18 = 108 m, wrongly treats the tram as accelerating the whole time, when the graph is flat for the last 10 seconds.
- (b) 235 litres — The flow rate at t = 10 is the gradient of the tangent: change in volume ÷ change in time = (190 − 130) ÷ (12 − 8) = 60 ÷ 4 = 15 litres per minute. Treating this rate as roughly constant for a short interval, the volume 5 minutes after t = 10 is estimated as 160 + 5 × 15 = 235 litres. Using the tangent's own point spacing — 2 minutes, from t = 10 to t = 12 — instead of the 5 minutes actually asked for gives 160 + 2 × 15 = 190, which is just the volume already given at one of the tangent's own points, not an answer to the question asked. Multiplying the gradient by the time WITHOUT adding the starting volume, 5 × 15 = 75, forgets that a rate estimates a CHANGE, which must be added to the starting volume, not given as the answer on its own. Subtracting instead of adding, 160 − 5 × 15 = 85, extrapolates backward in time rather than forward.
- (a) Underestimate: the chord lies below the curve — For a curve that is concave down (bending downward), the straight line joining any two points on the curve lies BELOW the curve. The trapezium's top edge is this straight line, so the trapezium's area is smaller than the true area under the curve — the trapezium rule UNDERESTIMATES the distance in this case. This is because a curve whose gradient keeps decreasing bends away from any chord joining two of its points, dropping the chord below every point of the curve in between. The reverse, a chord lying above the curve, is the rule for a concave-up curve, not this one — check which way the curve bends before deciding. The trapezium rule does not always overestimate or underestimate, and it is not exact except when the graph really is a straight line.
- (a) 25 — Gradient = change in y ÷ change in x = (100 − 0) ÷ (4 − 0) = 100 ÷ 4 = 25. Dividing time by distance instead of distance by time gives 0.04; multiplying the two values instead of dividing gives 400; stopping at the change in distance, 100, forgets to divide by the change in time.
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (c) 2.26 — Method: apply the formula repeatedly, keeping the whole display each time, and stop when two values in a row round to the same 2 decimal places; that shared rounded value is the solution to that accuracy. Working: x₁ = ∛(2 × 2 + 7) = ∛11 = 2.22398…; x₂ = ∛(2 × 2.22398… + 7) = ∛11.44796… = 2.25377…; x₃ = ∛11.50754… = 2.25767…; x₄ = ∛11.51534… = 2.25818…. Now x₃ and x₄ both round to 2.26, so the sequence has settled. Answer: 2.26. The distractors: 2.22 is x₁ rounded, quoted by a candidate who stops after one use of the formula; 2.25 is x₂ rounded, quoted by a candidate who stops as soon as two values look close instead of waiting until two consecutive values round to the same figure; 1.91 is ∛7, which comes from ignoring the 2x term and solving x³ = 7 instead.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (d) x² − 7x − 3 = 0 — Method: an iteration settles where the next value equals the one before it, so both can be written as the same letter x; replace every xₙ by x, square both sides to clear the square root, and collect all the terms on one side. Working: x = √(7x + 3) gives x² = 7x + 3 on squaring both sides; subtracting 7x and 3 from both sides gives x² − 7x − 3 = 0. Answer: x² − 7x − 3 = 0. The distractors: x² + 7x − 3 = 0 moves the 7x across the equals sign without changing its sign; x² − 7x + 3 = 0 makes that same slip on the constant instead, leaving the 3 positive as it crosses; x² − 7x − 9 = 0 squares the expression term by term, squaring the 3 to give 9 as though squaring √(7x + 3) gave 7x + 9, which is the (a + b)² = a² + b² mistake dressed as a square root.
- (a) 2.55 — x₁ = 20 ÷ (2 + 5) = 20 ÷ 7 = 2.857142857. x₂ = 20 ÷ (2.857142857 + 5) = 20 ÷ 7.857142857 = 2.545454545, which rounds to 2.55. Reporting x₁ instead of x₂ gives 2.857142857, which rounds to 2.86. Dropping the +5 in the denominator, using xₙ₊₁ = 20 ÷ xₙ, gives x₁ = 20 ÷ 2 = 10 and x₂ = 20 ÷ 10 = 2, which is 2.00. A sign error in the denominator, using xₙ₊₁ = 20 ÷ (xₙ − 5), gives x₁ = 20 ÷ (2 − 5) = −6.666666667 and x₂ = 20 ÷ (−6.666666667 − 5) = −1.714285714, which rounds to −1.71.
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
Build your own mix at the worksheet builder.