Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 2.A tram sets off from a stop. Its velocity-time graph rises in a straight line from 0 m/s to 12 m/s over the first 8 seconds, then stays constant at 12 m/s for a further 10 seconds. Work out the total distance the tram travels in these 18 seconds, using the area under the graph.
- 3.A company's weekly profit, in £, is modelled by y = f(x), where x is the number of weeks since launch. The graph of y = f(x) has a maximum at (10, 45000). A rival company uses the same marketing strategy but starts trading 6 weeks later and has fixed costs £8000 higher every week, so its profit is modelled by y = f(x − 6) − 8000. In which week does the rival's maximum weekly profit occur, and what is it?
- 4.A circle has centre (0, 0) and passes through the point (12, 35). Work out the equation of the circle.
- 5.A cup of tea cools after being made. Its temperature-time graph is a curve. Three tangents are drawn on the graph: at t = 2 minutes the tangent has gradient −8; at t = 10 minutes the tangent has gradient −3; at t = 20 minutes the tangent has gradient −0.5. Which of these statements about the tea's cooling is correct?
- 6.A number, n, is tripled and then 4.5 is added. The result is 22.5. Form an equation and solve it to find n.
- 7.The equation x³ − 2x − 7 = 0 has exactly one solution. It can be found using the iterative formula xₙ₊₁ = ∛(2xₙ + 7), with starting value x₀ = 2, so that x₁ is the value after the formula has been used once. Work out the solution correct to 2 decimal places, iterating until two consecutive values round to the same 2 decimal places.
- 8.Work out the value of 5m² + 3m when m = −2.4
- 9.A car park charges by the hour. Parking for 1 hour costs £5, 2 hours costs £9, 3 hours costs £13 and 4 hours costs £17, with the cost increasing by the same amount for each extra hour. Work out an expression, in terms of n, for the cost, in pounds, of parking for n hours.
- 10.A company's cost, in £, for producing x items is shown on a graph. The tangent to the curve at x = 50 passes through (30, 400) and (70, 800). Interpret the gradient of this tangent in the context of the company's costs.
- 11.The tangent to a curve at the point where x = 4 passes through the points (2, 5) and (6, 21). Use these two points to estimate the gradient of the curve at x = 4.
- 12.An exponential graph y = A × rˣ passes through the points (0, 8) and (2, 18). Work out the value of r, correct to 2 decimal places.
- 13.A gas company charges a standing charge plus a rate per unit used. The total cost, y in pounds, for using x units is given by y = 0.15x + 20. Work out the cost of using 200 units.y = 0.15x + 20
- 14.The point (20, 21) lies on the circle x² + y² = 841, which has centre O(0, 0). The tangent to the circle at (20, 21) crosses the x-axis at P and the y-axis at Q. Work out the area of triangle OPQ, correct to 1 decimal place.
- 15.A parcel delivery company's cost graph shows the following: the cost is a flat £5 for parcels weighing up to 2 kg, and then rises by £2 for each additional kg above 2 kg. Use the graph to work out the weight of a parcel that costs £17.
Answer key
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (d) 168 m — Split the area under the graph into two parts. The rising section (0 to 8 s) is a triangle: area = 0.5 × 8 × 12 = 48. The constant section, from 8 s to 18 s (10 s), is a rectangle: area = 12 × 10 = 120. Total distance = 48 + 120 = 168 m. Leaving out the 0.5 doubles the triangle, giving 8 × 12 + 120 = 216 m; ignoring the triangle section altogether gives only 120 m; averaging the start and final speeds over the whole 18 seconds, (0 + 12) ÷ 2 = 6, then 6 × 18 = 108 m, wrongly treats the tram as accelerating the whole time, when the graph is flat for the last 10 seconds.
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (b) x² + y² = 1369 — For a circle centred at the origin, the radius squared equals the sum of the squares of the coordinates of any point on it: r² = 12² + 35² = 144 + 1225 = 1369. The equation is x² + y² = 1369. x² + y² = 2209 comes from adding the coordinates first and then squaring the sum: (12 + 35)² = 47² = 2209, instead of squaring each coordinate separately. x² + y² = 1225 comes from using only 35² and leaving out the 12² term. x² + y² = 144 comes from using only 12² and leaving out the 35² term.
- (c) Fastest at t = 2 min — steepest gradient. — The rate of cooling is given by the size (magnitude) of the gradient, ignoring its sign — the steeper the tangent, the faster the temperature is changing. Of −8, −3 and −0.5, the gradient −8 has the greatest magnitude, so the tea is cooling fastest at t = 2 minutes. 'Fastest at t = 20 min — largest gradient' confuses the signed value with the size of the rate: −0.5 is the largest NUMBER of the three, but it's the smallest in magnitude, meaning the tea is barely cooling at all by then. 'Cools at the same rate throughout' ignores that the three gradients are different sizes, not just all negative. 'Fastest at t = 10 min — the middle reading' isn't a mathematical reason at all — the gradients themselves have to be compared, not their position in the list.
- (b) 6 — 3n + 4.5 = 22.5, so 3n = 18 and n = 6. A candidate who divides 22.5 by 3 first and ignores the 4.5 gets n = 7.5. A candidate who makes a sign error and forms the equation 3n − 4.5 = 22.5 gets 3n = 27 and n = 9. A candidate who divides by 3 before subtracting the 4.5, working out 22.5 ÷ 3 + 4.5, gets n = 12.
- (c) 2.26 — Method: apply the formula repeatedly, keeping the whole display each time, and stop when two values in a row round to the same 2 decimal places; that shared rounded value is the solution to that accuracy. Working: x₁ = ∛(2 × 2 + 7) = ∛11 = 2.22398…; x₂ = ∛(2 × 2.22398… + 7) = ∛11.44796… = 2.25377…; x₃ = ∛11.50754… = 2.25767…; x₄ = ∛11.51534… = 2.25818…. Now x₃ and x₄ both round to 2.26, so the sequence has settled. Answer: 2.26. The distractors: 2.22 is x₁ rounded, quoted by a candidate who stops after one use of the formula; 2.25 is x₂ rounded, quoted by a candidate who stops as soon as two values look close instead of waiting until two consecutive values round to the same figure; 1.91 is ∛7, which comes from ignoring the 2x term and solving x³ = 7 instead.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (b) 1.50 — Substituting (0, 8) gives A = 8, since r⁰ = 1. Substituting (2, 18) gives 8 × r² = 18, so r² = 18 ÷ 8 = 2.25. Taking the square root of 2.25 gives r = 1.50 (2 d.p.). Stopping after finding r² and giving 2.25 as the final answer, without taking the square root, is wrong because r² is not the same as r. Dividing r² by the exponent 2 instead of taking its square root — treating the power as something you divide by rather than root — gives 2.25 ÷ 2 = 1.13 (2 d.p.), which is wrong. Inverting the ratio, working out 8 ÷ 18 instead of 18 ÷ 8, gives 0.44 (2 d.p.), which is wrong because the LATER value must be divided by the EARLIER one to find the growth multiplier, not the other way round.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
- (b) 8 kg — The cost above the flat £5 charge is 17 − 5 = £12. At £2 per kg, this covers 12 ÷ 2 = 6 kg above the first 2 kg, so the total weight is 2 + 6 = 8 kg. Dividing the full £17 by £2 per kg without first taking off the £5 flat charge gives 17 ÷ 2 = 8.5 kg. Taking off the £5 flat charge and dividing by £2 per kg, but forgetting to add back the 2 kg that the flat charge covers, gives 12 ÷ 2 = 6 kg. Taking off £2 instead of £5 as the flat charge, (17 − 2) ÷ 2 = 7.5 kg, swaps which number is the fixed fee.
Build your own mix at the worksheet builder.