Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A scout leader is 44 years old and one of the scouts is 16 years old. Work out how many years it will be until the leader is exactly twice as old as the scout.
- 2.A gas company charges a standing charge plus a rate per unit used. The total cost, y in pounds, for using x units is given by y = 0.15x + 20. Work out the cost of using 200 units.y = 0.15x + 20
- 3.A ferry's distance-time graph is a straight line from (0 minutes, 0 km) to (25 minutes, 15 km). Work out the ferry's speed in kilometres per hour.
- 4.Two numbers have a sum of 45. The larger number is 9 more than the smaller number. Form an equation using n for the smaller number, and solve it to find the larger number.
- 5.A rectangular photo has length (x + 3) cm and width x cm. Its area is 40 cm². Work out the value of x.
- 6.f(x) = x³ − 3x − 5. Given that f(2.2) = −0.952 and f(2.3) = 0.267, work out what this shows about the equation x³ − 3x − 5 = 0.y = x
- 7.A gym charges a joining fee plus a monthly fee. Anna paid £100 in total after 3 months of membership. Ben paid £160 in total after 6 months of membership (same joining fee and monthly fee as Anna). Work out the monthly fee.
- 8.A cyclist accelerates uniformly from rest to 6 m/s in 4 seconds, travels at a constant 6 m/s for 10 seconds, then decelerates uniformly to rest in 3 seconds. Work out the total distance the cyclist travels.
- 9.The formula connecting speed, distance and time is v = s ÷ t. Work out v, in km/h, when s = 180 and t = 4.
- 10.The tangent to a curve at the point (5, 2) is the line y = mx + c. This tangent crosses the y-axis at (0, −8). Work out the gradient, m, of the tangent.
- 11.A ball is thrown in the air. Its height, h metres, above the ground after t seconds is given in this table: when t = 0, h = 0; when t = 1, h = 15; when t = 2, h = 20; when t = 3, h = 15; when t = 4, h = 0. Use the table to find the two times, in seconds, at which the ball is at ground level.
- 12.By completing the square, find the turning point of the curve y = 3x² + 12x + 7.y = 3x² + 12x + 7
- 13.f(x) = x³ − 5x − 6. Given that f(2.6) = −1.424 and f(2.7) = 0.183, work out what this shows about the equation x³ − 5x − 6 = 0.y = x
- 14.A tree is 2 metres tall. Each year its height increases by 10% of its height at the start of that year. Work out the height of the tree after 3 years, giving your answer to 1 decimal place.
- 15.The equation 7x = x² + 3 can be solved using the iterative formula xₙ₊₁ = (xₙ² + 3) ÷ 7. Taking x₀ = 0.4, x₁ = 0.4514 correct to 4 decimal places. Using the full unrounded value of x₁, work out x₂ correct to 3 decimal places.
Answer key
- (b) 12 years — Method: call the number of years t, add t to both ages, and form an equation from the comparison at that future time. Working: in t years the leader will be 44 + t and the scout will be 16 + t, so 44 + t = 2(16 + t); expanding gives 44 + t = 32 + 2t, and subtracting t and 32 from both sides gives t = 12. Checking: in 12 years the leader will be 56 and the scout 28, and 56 = 2 × 28. Answer: 12 years. The distractors: 6 years comes from halving the leader's present age instead, so that the scout has to reach 22, which takes 6 years; 14 years comes from halving the 28-year gap between the two ages; 28 years comes from giving the age gap itself as the number of years.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (a) 36 km/h — Speed is distance ÷ time. Convert 25 minutes to hours: 25 ÷ 60 = 5/12 hours. Then 15 ÷ (5/12) = 15 × 12/5 = 36 km/h. Dividing 15 by 25 without converting minutes to hours gives 0.6 km/h. Multiplying 15 by 25/60 instead of dividing by it gives 6.25 km/h. Working out the speed in km per minute, 0.6, and then multiplying by 24 instead of 60 gives 14.4 km/h.
- (a) 27 — Method: let the smaller number be n, so the larger number is n + 9. Form the equation n + (n + 9) = 45. Working: simplify: 2n + 9 = 45, so 2n = 36, giving n = 18. The larger number is 18 + 9 = 27. Answer: 27. 18 is the smaller number, found correctly, but given as the answer to the question asking for the larger number. 22.5 comes from ignoring the "9 more" part and simply halving the total, 45 ÷ 2. 36 comes from a sign error when isolating the constant, treating the equation as 2n = 45 + 9 instead of 2n = 45 − 9.
- (b) x = 5 — Area = length × width, so x(x + 3) = 40, which rearranges to x² + 3x − 40 = 0. This factorises as (x + 8)(x − 5) = 0: the two numbers in the brackets must multiply to −40 and add to +3, and the pair 8 and −5 does both. This gives x = −8 or x = 5. Since x is a length, it cannot be negative, so x = 5. A candidate who gives both solutions without rejecting the negative one, which cannot be a length, answers x = 5 or x = −8. A candidate who picks the wrong factor pair of 40, such as 10 and −4 instead of 8 and −5, gets (x + 10)(x − 4) = 0 and answers x = 4. A candidate who rejects the wrong root, keeping the negative solution instead of the positive one, answers x = −8.
- (d) It has a solution between x = 2.2 and x = 2.3 — Since f(2.2) is negative and f(2.3) is positive, the graph of f crosses the x-axis somewhere between x = 2.2 and x = 2.3, so the equation has a solution in that interval. Choosing 'between x = −2.2 and x = −2.3' confuses the negative f-VALUE at 2.2 with a negative x-value. Choosing 'no solution' misreads a change of sign as meaning the opposite of what it shows. Choosing 'exactly two solutions' assumes a single change of sign must give two roots, which is not what the rule guarantees.
- (d) £20 — Let f be the joining fee and m the monthly fee: f + 3m = 100 and f + 6m = 160. Subtracting the first equation from the second eliminates f: 3m = 60, so m = 20. A candidate who finds the joining fee instead of the monthly fee would get f = 100 − 3(20) = £40. A candidate who divides Ben's total by his number of months, ignoring that part of the cost is a fixed joining fee, would get 160 ÷ 6 ≈ £26.67. A candidate who divides the difference in cost by the total number of months instead of the difference in months would get (160 − 100) ÷ 9 ≈ £6.67.
- (c) 81 m — Split the velocity-time graph into its three phases. The accelerating phase (0 to 4 s) is a triangle: 1/2 × 4 × 6 = 12. The constant phase (4 s at 6 m/s, for 10 s) is a rectangle: 10 × 6 = 60. The decelerating phase (3 s) is a triangle: 1/2 × 3 × 6 = 9. Total distance: 12 + 60 + 9 = 81 m. Forgetting the final decelerating phase entirely and adding only the first two areas gives 12 + 60 = 72 m. Treating all three phases as rectangles, forgetting to halve either triangular phase, gives 4 × 6 + 10 × 6 + 3 × 6 = 102 m. Halving only the deceleration triangle correctly but treating the acceleration phase as a rectangle too gives 4 × 6 + 60 + 9 = 93 m.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (d) 2 — The gradient between two points on a line is the change in y divided by the change in x. Using (5, 2) and (0, −8): (2 − (−8)) ÷ (5 − 0) = 10 ÷ 5 = 2. Inverting the fraction, dividing the change in x by the change in y instead, gives 5 ÷ 10 = 0.5. Reversing the order of the x-values in the denominator, giving (2 − (−8)) ÷ (0 − 5) = 10 ÷ (−5), gives −2. Misreading the y-intercept as 8 instead of −8, giving (2 − 8) ÷ 5 = −6 ÷ 5, gives −1.2.
- (a) t = 0 or t = 4 — The ball is at ground level exactly when h = 0. From the table, h = 0 at t = 0 and at t = 4, so those are the two times. Distractor origins: t = 1 or t = 3 picks the times with equal (but non-zero) height instead of ground level; t = 2 picks the time of maximum height instead of ground level; t = 0 finds only the starting time and misses the second one.
- (d) x = −2, y = −5 — 3x² + 12x + 7 rewrites as 3(x² + 4x) + 7, then as 3[(x + 2)² − 4] + 7, which simplifies to 3(x + 2)² − 5, since −3 × 4 + 7 = −5. Substituting x = −2: 3 × (−2)² = 12, 12 × (−2) = −24, so 12 − 24 + 7 = −5, confirming the minimum value −5 at x = −2: turning point x = −2, y = −5. Halving b instead of halving b/a — using −4 as the shift instead of −2 — lands on turning point x = −4, y = −41, which is wrong because when a ≠ 1 the shift inside the bracket is b/(2a), not b/a alone. Reading the bracket's sign directly as the turning point's x-coordinate gives x = 2, y = −5 — wrong, because (x + 2)² is zero at x = −2, not x = 2. Computing 12 − 7 = 5 instead of 7 − 12 = −5 flips the sign of the constant, giving x = −2, y = 5 — wrong, since the completed square's constant must be evaluated as 7 minus 12, not 12 minus 7. Whenever a ≠ 1, factor a out of the x² and x terms first, and always check a turning point by substituting back into the original equation.
- (a) It has a solution between x = 2.6 and x = 2.7 — f(2.6) is negative and f(2.7) is positive, so the graph of f crosses the x-axis between x = 2.6 and x = 2.7, meaning the equation has a solution there. Choosing 'x = 2.6 is a solution' reads an end of the interval as the root itself, but f(2.6) = −1.424, which is not zero — the change of sign locates a root between the two values, it does not land on either of them. Choosing 'between x = −2.6 and x = −2.7' confuses the negative f-VALUE at 2.6 with a negative x-value. Choosing 'no root in this interval' misapplies the rule, which needs a CHANGE of sign — and a change of sign is exactly what these two values show.
- (d) 2.7 — The height after 3 years of 10% compound growth is 2 × 1.1³ = 2.662 m, which rounds to 2.7 m. A candidate who adds 10% of the original height (0.2 m) in each of the 3 years, instead of compounding on the new height each time, would reach 2 + 3×0.2 = 2.6 m. A candidate who compounds for only 2 years would reach 2 × 1.1² = 2.42 m, rounding to 2.4 m. A candidate who compounds for 4 years instead of 3 would reach 2 × 1.1⁴ = 2.928 m, rounding to 2.9 m.
- (b) 0.458 — x₁ = (0.4² + 3) ÷ 7 = 3.16 ÷ 7 = 0.4514 (unrounded, 0.451428...). x₂ = (x₁² + 3) ÷ 7 = (0.2038 + 3) ÷ 7 = 3.2038 ÷ 7 = 0.458 (3 d.p.). Choosing 0.632 divides only the 3 by 7 instead of dividing the whole sum x₁² + 3 by 7. Choosing 0.451 repeats the calculation for x₁ instead of moving on to x₂. Choosing 0.493 uses x₁ itself instead of x₁² inside the formula.
Build your own mix at the worksheet builder.