Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 2.A runner's journey is shown on a distance-time graph: she runs 8 km in the first hour, rests for 30 minutes with no distance gained, then runs a further 4 km in the next 30 minutes. Work out her average speed for the whole journey, in kilometres per hour.
- 3.A taxi fare in pounds is given by F = 2.50 + 1.20m, where m is the number of miles travelled. Sam takes a taxi for a journey of 6 miles. Work out the fare.
- 4.A company's cost, in £, for producing x items is shown on a graph. The tangent to the curve at x = 50 passes through (30, 400) and (70, 800). Interpret the gradient of this tangent in the context of the company's costs.
- 5.The formula for the energy stored in a stretched spring is E = (1/2)kx², where E is in joules, k is the spring constant in N/m and x is the extension in m. A spring with a spring constant of 40 N/m is stretched so that its extension is 0.3 m. Work out the energy stored in the spring.
- 6.A circular pond has equation x² + y² = 20, with lengths in metres from the centre of the garden. A straight path runs along the line y = 2x, entering the pond and leaving it again. Work out the coordinates of the two points where the path meets the edge of the pond.y = 2x
- 7.A bath is filled with water; the graph of volume (litres) against time (minutes) is a curve, since the flow rate changes. The tangent to the curve at t = 10 minutes passes through the points (8, 130) and (12, 190), and the volume in the bath at t = 10 minutes is 160 litres. Use the gradient of this tangent to estimate the volume in the bath 5 minutes after t = 10 minutes.
- 8.A person's body mass index is given by the formula B = m ÷ h², where m is the mass in kg and h is the height in metres. Work out B, to 1 decimal place, when m = 68 and h = 1.6.
- 9.The table shows the speed, in m/s, of a car at times, in seconds, all 2 seconds apart: 0 at t = 0, 3 at t = 2, 8 at t = 4, 15 at t = 6, 24 at t = 8. A student uses the trapezium rule with these five readings to estimate the distance the car travels. By finding the second differences of the speed values, decide whether this trapezium estimate is an overestimate or an underestimate of the true distance.
- 10.A graph shows the total monthly cost of a mobile phone tariff against the number of minutes of calls. The line starts at £12 and stays level until 200 minutes, then rises by 5p for each further minute of calls. Use the graph to work out the total cost of a month in which 250 minutes of calls are made.
- 11.Six years ago Harry was three times as old as his brother Leo. Harry is now 24 years old. Work out Leo's age now.
- 12.The graph of y = 60 × (0.5)ˣ is sketched for x ≥ 0. Which statement correctly describes what happens to the curve as x increases?
- 13.The equation x³ + 4x − 9 = 0 is to be solved by iteration. Work out which one of these iterative formulas comes from a correct rearrangement of that equation.
- 14.The graph of W = 840 ÷ L shows how the width, W metres, of a rectangular field of area 840 m² depends on its length, L metres. Use the relationship to work out the width when the length is 35 m, and hence the perimeter of the field.
- 15.The formula connecting speed, distance and time is v = s ÷ t. Work out v, in km/h, when s = 180 and t = 4.
Answer key
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (c) £9.70 — F = 2.50 + 1.20 × 6 = 2.50 + 7.20 = £9.70. £7.20 comes from forgetting to add the £2.50 fixed charge. £10.20 comes from adding the 2.50 to the number of miles before multiplying by 1.20, 1.20 × (6 + 2.50). £22.20 comes from adding the fixed charge and the rate together first and then multiplying by the miles, (2.50 + 1.20) × 6.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (b) (2, 4) and (−2, −4) — Substitute y = 2x into x² + y² = 20: x² + (2x)² = 20, which gives x² + 4x² = 20, so 5x² = 20, x² = 4, and x = 2 or x = −2. Using y = 2x for each x-value: x = 2 gives y = 4; x = −2 gives y = −4. The path meets the pond's edge at (2, 4) and (−2, −4). Distractor routes: (2, −4) and (−2, 4) swaps the sign pairing, matching each x-value with the wrong sign of y instead of keeping each x with its own correctly-signed y. (2, 1) and (−2, −1) comes from using y = x/2 instead of y = 2x when finding the y-coordinates. (2, 4) alone stops after the positive square root of x² = 4 and never finds the second point from x = −2.
- (b) 235 litres — The flow rate at t = 10 is the gradient of the tangent: change in volume ÷ change in time = (190 − 130) ÷ (12 − 8) = 60 ÷ 4 = 15 litres per minute. Treating this rate as roughly constant for a short interval, the volume 5 minutes after t = 10 is estimated as 160 + 5 × 15 = 235 litres. Using the tangent's own point spacing — 2 minutes, from t = 10 to t = 12 — instead of the 5 minutes actually asked for gives 160 + 2 × 15 = 190, which is just the volume already given at one of the tangent's own points, not an answer to the question asked. Multiplying the gradient by the time WITHOUT adding the starting volume, 5 × 15 = 75, forgets that a rate estimates a CHANGE, which must be added to the starting volume, not given as the answer on its own. Subtracting instead of adding, 160 − 5 × 15 = 85, extrapolates backward in time rather than forward.
- (c) 26.6 — h² = 1.6² = 2.56, so B = 68 ÷ 2.56 = 26.5625, which rounds to 26.6 (1 d.p.). A candidate who forgets to square the height gets 68 ÷ 1.6 = 42.5. A candidate who squares the mass instead of the height gets 68² ÷ 1.6 = 2890.0. A candidate who truncates 26.5625 instead of rounding it gets 26.5.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (a) £14.50 — Method: the first 200 minutes are already covered by the £12, so only 250 − 200 = 50 minutes are charged extra. Extra charge = 50 × £0.05 = £2.50. Total cost = £12 + £2.50 = £14.50. Distractor origins: £24.50 charges 5p for all 250 minutes instead of only the 50 minutes over 200 (250 × £0.05 = £12.50, plus £12 = £24.50); £12.50 makes that same slip of charging all 250 minutes but then forgets to add the £12 monthly fee; £13.50 works out 250 − 200 wrongly as 30 extra minutes instead of 50 (30 × £0.05 = £1.50, plus £12 = £13.50).
- (a) 12 — Method: write both ages as they were six years ago, call Leo's present age x, and form an equation from the comparison at that time. Working: six years ago Harry was 24 − 6 = 18 and Leo was x − 6, so 18 = 3(x − 6); expanding gives 18 = 3x − 18, adding 18 to both sides gives 36 = 3x, and dividing by 3 gives x = 12. Checking: six years ago Harry was 18 and Leo was 6, and 18 = 3 × 6. Answer: 12. The distractors: 6 comes from solving 18 = 3(x − 6) as far as Leo's age six years ago, 18 ÷ 3 = 6, and giving that as his age now; 8 comes from dividing Harry's present age by 3, 24 ÷ 3 = 8, using the multiple at the wrong moment in time; 36 comes from stopping at 3x = 36 and giving 36 as Leo's age.
- (a) It gets closer to zero but never actually reaches it. — y = 60 × (0.5)ˣ is always positive, however large x is, because a positive number raised to any power stays positive. As x increases, (0.5)ˣ gets smaller and smaller but never equals zero, so y approaches zero without ever reaching it. Believing the curve reaches zero when x = 60, because 60 is the starting value, mixes up the y-intercept with a stopping point — an exponential decay curve like this one never actually reaches the x-axis, so this is wrong. Believing the curve goes negative for large x is wrong because multiplying a positive number by (0.5) any number of times can never produce a negative result. Believing the curve levels off at y = 0.5, confusing the base of the exponential with its eventual level, is wrong: the base only controls how fast the curve falls, not where it settles — this curve settles at y = 0, not y = 0.5. Whenever you sketch an exponential decay curve, draw it approaching the x-axis but never touching it.
- (c) xₙ₊₁ = ∛(9 − 4xₙ) — Method: a formula xₙ₊₁ = f(xₙ) is a correct rearrangement when the equation x = f(x) turns back into the equation you started with, so rearrange x³ + 4x − 9 = 0 by making the cube the subject. Working: x³ + 4x − 9 = 0 gives x³ = 9 − 4x, because the 4x and the 9 each change sign as they cross the equals sign; taking the cube root of both sides gives x = ∛(9 − 4x), which is the formula xₙ₊₁ = ∛(9 − 4xₙ). Answer: xₙ₊₁ = ∛(9 − 4xₙ). The distractors: ∛(9 + 4xₙ) comes from writing x³ = 9 + 4x, moving the 4x across the equals sign without changing its sign; (9 + xₙ³)/4 comes from making the linear term the subject but keeping the sign of the cube, writing 4x = 9 + x³ when the equation gives 4x = 9 − x³; ∛(9 − 4xₙ³) cubes the x in the linear term as well, changing a term the original equation never cubed.
- (b) 118 m — Width = 840 ÷ 35 = 24 m. Perimeter = 2 × (length + width) = 2 × (35 + 24) = 2 × 59 = 118 m. The option 59 m gives the sum of the length and width but forgets to double it for the perimeter. The option 70 m doubles only the length (2 × 35 = 70) and leaves out the width entirely. The option 48 m doubles only the width (2 × 24 = 48) and leaves out the length entirely.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
Build your own mix at the worksheet builder.