Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A cyclist's speed-time graph is described as follows: speed increases steadily from 0 m/s to 8 m/s over the first 4 seconds, stays constant at 8 m/s for the next 6 seconds, then decreases steadily to 0 m/s over the final 2 seconds. Work out the total distance travelled.
- 2.The formula for converting a temperature in Fahrenheit, F, to Celsius, C, is C = 5(F − 32) ÷ 9. Work out C, to 1 decimal place, when F = 98.6.
- 3.A car park charges by the hour. Parking for 1 hour costs £5, 2 hours costs £9, 3 hours costs £13 and 4 hours costs £17, with the cost increasing by the same amount for each extra hour. Work out an expression, in terms of n, for the cost, in pounds, of parking for n hours.
- 4.A speed-time graph shows a constant speed of 15 m/s for 20 seconds. Work out the distance travelled, using the area under the graph.
- 5.A tap fills a tank at a varying rate. A graph shows the rate of flow, in litres per minute, against time, in minutes. What does the area under this graph represent?
- 6.A phone company works out a monthly bill, £B, using the formula B = 18 + 0.05t, where £18 is the fixed monthly charge and t is the number of extra text messages sent beyond the free allowance, each charged at 5p. Farida's bill for one month is £24.50. Work out the number of extra text messages, t, she sent.
- 7.The diagram shows a distance–time graph for a cyclist travelling at a constant speed, for the first 6 minutes of a journey. Distance is in kilometres and time is in minutes. Work out how far the cyclist would travel in 20 minutes at the same speed.
- 8.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 9.A company's cost, in £, for producing x items is shown on a graph. The tangent to the curve at x = 50 passes through (30, 400) and (70, 800). Interpret the gradient of this tangent in the context of the company's costs.
- 10.A company's weekly profit, in £, is modelled by y = f(x), where x is the number of weeks since launch. The graph of y = f(x) has a maximum at (10, 45000). A rival company uses the same marketing strategy but starts trading 6 weeks later and has fixed costs £8000 higher every week, so its profit is modelled by y = f(x − 6) − 8000. In which week does the rival's maximum weekly profit occur, and what is it?
- 11.A taxi company charges a £2.50 booking fee plus £1.80 per mile. A journey costs £15.10 in total. Work out the number of miles travelled.
- 12.A scout leader is 44 years old and one of the scouts is 16 years old. Work out how many years it will be until the leader is exactly twice as old as the scout.
- 13.An exponential model has equation y = A × bˣ, where b > 1. Its graph passes through the points (1, 135) and (2, 405). Work out the value of A.
- 14.A rectangular vegetable plot has an area of 30 m² and its length is 4 m greater than its width, x metres. This gives x² + 4x − 30 = 0, which can be solved using the iterative formula xₙ₊₁ = √(30 − 4xₙ). The starting value is x₀ = 3, so x₁ is the value after the formula has been used once. Work out x₃, and use it to find an estimate for the length of the plot, giving your answer correct to 1 decimal place.
- 15.A park is drawn on a grid in which 1 unit represents 1 km. The car park is at the point (0, 0) and the lake is at the point (3, 5). Work out the direct distance, in km, from the car park to the lake, giving your answer to 1 decimal place.
Answer key
- (c) 72 m — The first section is a triangle with base 4 s and height 8 m/s, area = 1/2 × 4 × 8 = 16 m. The middle section is a rectangle with base 6 s and height 8 m/s, area = 6 × 8 = 48 m. The final section is a triangle with base 2 s and height 8 m/s, area = 1/2 × 2 × 8 = 8 m. Total distance = 16 + 48 + 8 = 72 m. Treating both sloping sections as full rectangles instead of triangles — forgetting the factor of a half — gives 4 × 8 + 6 × 8 + 2 × 8 = 96 m, which is wrong because a sloping speed-time section is a triangle, not a rectangle. Leaving out the final, decreasing section entirely gives 16 + 48 = 64 m, which is wrong because the cyclist is still moving and covering distance while slowing down. Leaving out the middle, constant-speed section gives 16 + 8 = 24 m, which is wrong because the cyclist covers the most distance of all during the 6 seconds of constant speed.
- (d) 37.0 — C = 5(98.6 − 32) ÷ 9 = 5 × 66.6 ÷ 9 = 333 ÷ 9 = 37.0. A candidate who forgets to subtract 32 first gets 5 × 98.6 ÷ 9 = 54.8 (1 d.p.). A candidate who forgets the 5 ÷ 9 factor entirely and just works out F − 32 gets 66.6. A candidate who multiplies by 9 ÷ 5 instead of 5 ÷ 9 gets 66.6 × 9 ÷ 5 = 119.9 (1 d.p.).
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (b) The total volume of water, in litres, that has flowed in. — On a rate-time graph, the y-axis is in litres per minute and the x-axis is in minutes; multiplying a rate by a time gives litres per minute × minutes = litres, a total volume. So the area under the graph represents the total volume of water that has flowed in. Thinking the area itself represents the rate, rather than what the rate accumulates to, gives the wrong claim about the average rate of flow. Confusing the area with the gradient of the graph — which measures how the rate is changing — gives the wrong claim about litres per minute squared. Ignoring the flow-rate axis and focusing only on the time axis gives the wrong claim that the area is simply the total time.
- (a) 130 — Method: substitute the total bill into the formula, then subtract the fixed charge and divide by the cost per text message. Working: 24.50 = 18 + 0.05t, so 0.05t = 24.50 − 18 = 6.50, t = 6.50 ÷ 0.05 = 130. Answer: 130 extra text messages. 490 comes from dividing the whole bill by 0.05 without first subtracting the £18 fixed charge: 24.50 ÷ 0.05 = 490. 13 comes from dividing the £6.50 by 0.5 instead of 0.05, moving the decimal point one place too far: 6.50 ÷ 0.5 = 13. 65 comes from dividing the £6.50 by 0.1 instead of 0.05.
- (b) 10 km — Method: find the constant speed from the graph (distance ÷ time for any point on the line), then multiply that speed by 20 minutes. Working: the line passes through (4 minutes, 2 km), so the speed is 2 ÷ 4 = 0.5 km per minute; in 20 minutes the cyclist travels 0.5 × 20 = 10 km. Answer: 10 km. Distractor refutation: 3 km comes from reading off the distance shown at the end of the plotted section (6 minutes) and stopping there, instead of extending the line to 20 minutes. 20 km comes from misreading the speed as 1 km per minute instead of 0.5 km per minute, doubling the true rate. 40 km comes from dividing 20 by the speed instead of multiplying by it, a reciprocal mix-up.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
- (b) 12 years — Method: call the number of years t, add t to both ages, and form an equation from the comparison at that future time. Working: in t years the leader will be 44 + t and the scout will be 16 + t, so 44 + t = 2(16 + t); expanding gives 44 + t = 32 + 2t, and subtracting t and 32 from both sides gives t = 12. Checking: in 12 years the leader will be 56 and the scout 28, and 56 = 2 × 28. Answer: 12 years. The distractors: 6 years comes from halving the leader's present age instead, so that the scout has to reach 22, which takes 6 years; 14 years comes from halving the 28-year gap between the two ages; 28 years comes from giving the age gap itself as the number of years.
- (a) 45 — The ratio between the two given points, one power of x apart, gives b: 405 ÷ 135 = 3, so b = 3. Substituting back, at x = 1, y = A × b, so 135 = A × 3, giving A = 45. Giving the common ratio b itself instead of A confuses which unknown was asked for and produces 3 — wrong, because the question asks for A, not b. Giving 135 instead treats the first given point as the y-intercept and reads A off it directly — wrong, because that point is at x = 1, not x = 0, so 135 is A × b, not A. Assuming A equals b⁰ = 1 by itself, rather than substituting a known point to solve for A, gives 1 — wrong, because b⁰ is always 1 regardless of A; A must be found using an actual (x, y) pair from the graph.
- (a) 7.9 m — Method: the iteration converges on the width of the plot, so run the formula three times from the starting value and then add 4 m, because the length is 4 m greater than the width. Working: x₁ = √(30 − 4 × 3) = √18 = 4.24264…; x₂ = √(30 − 4 × 4.24264…) = √13.02943… = 3.60963…; x₃ = √(30 − 4 × 3.60963…) = √15.56147… = 3.94480…. The estimate for the length is 3.94480… + 4 = 7.94480…, which is 7.9 m correct to 1 decimal place. Answer: 7.9 m. The iteration is still oscillating at x₃, so this is the estimate that three uses of the formula give, not a settled value. The distractors: 3.9 m is x₃ itself, the width, given by a candidate who runs the iteration correctly and then stops before the step the question actually asks for; 7.6 m uses x₂ in place of x₃, one use of the formula short, and then adds the 4 m correctly; 15.8 m multiplies the width by 4 instead of adding 4 m to it, reading greater than as a multiplier.
- (a) 5.8 — The horizontal distance is 3 and the vertical distance is 5, so using Pythagoras' theorem the distance is √(3² + 5²) = √34 = 5.8 (1 d.p.). A candidate who adds the two differences instead of using Pythagoras gets 3 + 5 = 8.0. A candidate who works out 3² + 5² = 34 but forgets to take the square root gets 34.0. A candidate who subtracts the squares instead of adding them gets √(5² − 3²) = √16 = 4.0.
Build your own mix at the worksheet builder.