Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The equation x³ − 3x − 4 = 0 has a root near x = 2. Four students each try a different iterative formula, all starting from x₀ = 2: xₙ₊₁ = ∛(3xₙ + 4); xₙ₊₁ = (xₙ³ − 4) ÷ 3; xₙ₊₁ = 4 ÷ (xₙ² − 3); xₙ₊₁ = xₙ³ − 2xₙ − 4. Only one of these formulas keeps producing values that settle near the root when it is repeated. Work out x₁, correct to 3 decimal places, for the formula that does this.
- 2.A tram sets off from a stop. Its velocity-time graph rises in a straight line from 0 m/s to 12 m/s over the first 8 seconds, then stays constant at 12 m/s for a further 10 seconds. Work out the total distance the tram travels in these 18 seconds, using the area under the graph.
- 3.A rectangular photo has length (x + 3) cm and width x cm. Its area is 40 cm². Work out the value of x.
- 4.A model rocket's height is given by h = −5t² + 20t, where h is in metres and t is in seconds. A student says the graph of h against t is n-shaped. Which statement gives the correct verdict on the SHAPE and the reason that settles it from the equation?
- 5.The point (9, 12) lies on the circle x² + y² = 225, which has centre (0, 0). The tangent to the circle at (9, 12) crosses the x-axis at the point P. Work out the x-coordinate of P.
- 6.A car's journey is represented by a velocity-time graph. The total distance travelled, found from the area under the graph, is 350 metres, and the total time for the journey is 25 seconds. Work out the car's average speed for the whole journey, in m/s.
- 7.The braking distance of a car, in metres, is estimated using the formula d = 0.4v² + 6, where v is the speed in mph. A car travelling at 35 mph brakes. Work out the estimated braking distance.
- 8.A graph shows the total monthly cost of a mobile phone tariff against the number of minutes of calls. The line starts at £12 and stays level until 200 minutes, then rises by 5p for each further minute of calls. Use the graph to work out the total cost of a month in which 250 minutes of calls are made.
- 9.The graph of y = 60 × (0.5)ˣ is sketched for x ≥ 0. Which statement correctly describes what happens to the curve as x increases?
- 10.On Monday, a runner covers 15 km in 2.5 hours. On Tuesday, she covers 12 km in 1.5 hours. Using the formula speed = distance ÷ time, work out on which day she ran faster, and by how much.
- 11.f(x) = x³ − 3x − 5. Given that f(2.2) = −0.952 and f(2.3) = 0.267, work out what this shows about the equation x³ − 3x − 5 = 0.y = x
- 12.The table shows the height, in metres, of a firework rocket at various times, in seconds, during its flight: 40 at t = 2, 54 at t = 3, and 60 at t = 4. Use the chord between t = 2 and t = 4 to estimate the gradient of the height-time graph at t = 3, stating the correct units.
- 13.Solve the inequality 2(3x − 1) ≥ 4x + 8.
- 14.A rectangular sheet of metal measures 20 cm by 12 cm. A square of side x cm is cut from each corner and the sides are folded up to make an open box of volume 200 cm³. This gives x³ − 16x² + 60x − 50 = 0, which can be solved using the iterative formula xₙ₊₁ = (16xₙ² − xₙ³ + 50)/60. The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₃, and use it to find the longer side of the base of the box correct to 1 decimal place.
- 15.The iterative formula xₙ₊₁ = √(2xₙ + 15) is used repeatedly, starting from x₀ = 1. Work out the value that xₙ approaches, correct to 2 decimal places.
Answer key
- (a) 2.154 — Continuing xₙ₊₁ = ∛(3xₙ + 4) from x₁ = 2.154 gives x₂ = 2.187, x₃ = 2.195, settling towards the root near 2.196 — this is the formula that converges. Continuing xₙ₊₁ = (xₙ³ − 4) ÷ 3 from x₁ = 1.333 gives x₂ = −0.543 and then x₃ = −1.387, moving further from the root each time. Continuing xₙ₊₁ = 4 ÷ (xₙ² − 3) from x₁ = 4 gives x₂ = 0.308 and then x₃ = −1.377, swinging wildly rather than settling. Continuing xₙ₊₁ = xₙ³ − 2xₙ − 4 from x₁ = 0 gives x₂ = −4 and then x₃ = −60, running away from the root entirely.
- (d) 168 m — Split the area under the graph into two parts. The rising section (0 to 8 s) is a triangle: area = 0.5 × 8 × 12 = 48. The constant section, from 8 s to 18 s (10 s), is a rectangle: area = 12 × 10 = 120. Total distance = 48 + 120 = 168 m. Leaving out the 0.5 doubles the triangle, giving 8 × 12 + 120 = 216 m; ignoring the triangle section altogether gives only 120 m; averaging the start and final speeds over the whole 18 seconds, (0 + 12) ÷ 2 = 6, then 6 × 18 = 108 m, wrongly treats the tram as accelerating the whole time, when the graph is flat for the last 10 seconds.
- (b) x = 5 — Area = length × width, so x(x + 3) = 40, which rearranges to x² + 3x − 40 = 0. This factorises as (x + 8)(x − 5) = 0: the two numbers in the brackets must multiply to −40 and add to +3, and the pair 8 and −5 does both. This gives x = −8 or x = 5. Since x is a length, it cannot be negative, so x = 5. A candidate who gives both solutions without rejecting the negative one, which cannot be a length, answers x = 5 or x = −8. A candidate who picks the wrong factor pair of 40, such as 10 and −4 instead of 8 and −5, gets (x + 10)(x − 4) = 0 and answers x = 4. A candidate who rejects the wrong root, keeping the negative solution instead of the positive one, answers x = −8.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (b) 25 — The tangent at (9, 12) is 9x + 12y = 225. Setting y = 0 (the x-axis): 9x = 225, so x = 25. Choosing 18.75 comes from swapping the coefficients in the tangent equation (using 12x + 9y = 225) before setting y = 0. Choosing 15 is where the circle itself meets the x-axis (from x² = 225), not where the tangent does. Choosing 9 is just the x-coordinate of the original point (9, 12), not the point P.
- (b) 14 m/s — Average speed for a whole journey is total distance divided by total time: 350 ÷ 25 = 14 m/s. Multiplying the distance and time instead of dividing gives 350 × 25 = 8750 m/s. Adding the distance and time instead of dividing gives 350 + 25 = 375 m/s. Inverting the division, working out time divided by distance, gives 25 ÷ 350, which rounds to 0.07 m/s.
- (c) 496 — d = 0.4v² + 6. First v² = 35 × 35 = 1225. Then 0.4 × 1225 = 490. Add 6: 490 + 6 = 496 m. 490 comes from forgetting to add the 6 at the end. 202 comes from squaring 0.4v together instead of squaring only v, (0.4 × 35)² + 6 = 14² + 6 = 202. 20 comes from using v instead of v², 0.4 × 35 + 6.
- (a) £14.50 — Method: the first 200 minutes are already covered by the £12, so only 250 − 200 = 50 minutes are charged extra. Extra charge = 50 × £0.05 = £2.50. Total cost = £12 + £2.50 = £14.50. Distractor origins: £24.50 charges 5p for all 250 minutes instead of only the 50 minutes over 200 (250 × £0.05 = £12.50, plus £12 = £24.50); £12.50 makes that same slip of charging all 250 minutes but then forgets to add the £12 monthly fee; £13.50 works out 250 − 200 wrongly as 30 extra minutes instead of 50 (30 × £0.05 = £1.50, plus £12 = £13.50).
- (a) It gets closer to zero but never actually reaches it. — y = 60 × (0.5)ˣ is always positive, however large x is, because a positive number raised to any power stays positive. As x increases, (0.5)ˣ gets smaller and smaller but never equals zero, so y approaches zero without ever reaching it. Believing the curve reaches zero when x = 60, because 60 is the starting value, mixes up the y-intercept with a stopping point — an exponential decay curve like this one never actually reaches the x-axis, so this is wrong. Believing the curve goes negative for large x is wrong because multiplying a positive number by (0.5) any number of times can never produce a negative result. Believing the curve levels off at y = 0.5, confusing the base of the exponential with its eventual level, is wrong: the base only controls how fast the curve falls, not where it settles — this curve settles at y = 0, not y = 0.5. Whenever you sketch an exponential decay curve, draw it approaching the x-axis but never touching it.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (d) It has a solution between x = 2.2 and x = 2.3 — Since f(2.2) is negative and f(2.3) is positive, the graph of f crosses the x-axis somewhere between x = 2.2 and x = 2.3, so the equation has a solution in that interval. Choosing 'between x = −2.2 and x = −2.3' confuses the negative f-VALUE at 2.2 with a negative x-value. Choosing 'no solution' misreads a change of sign as meaning the opposite of what it shows. Choosing 'exactly two solutions' assumes a single change of sign must give two roots, which is not what the rule guarantees.
- (c) 10 m/s — A symmetric chord gradient uses the two points either side of t = 3: (2, 40) and (4, 60). The gradient is the change in height divided by the change in time: (60 − 40) ÷ (4 − 2) = 20 ÷ 2 = 10 m/s. Using only the values either side of one gap, (2, 40) and (3, 54), instead of the full symmetric chord, gives (54 − 40) ÷ (3 − 2) = 14 m/s. Getting the correct number but dropping the time unit, leaving only metres, gives 10 m. Dividing time by height instead of height by time inverts the calculation to (4 − 2) ÷ (60 − 40) = 0.1 s/m.
- (b) x ≥ 5 — Expand the bracket: 2(3x − 1) = 6x − 2, so the inequality is 6x − 2 ≥ 4x + 8. Subtract 4x from both sides and add 2 to both sides: 2x ≥ 10. Divide both sides by 2: x ≥ 5. A candidate who only multiplies the 3x by 2 and forgets to multiply the −1 gets 6x − 1 ≥ 4x + 8, leading to x ≥ 4.5. A candidate who adds 4x instead of subtracting it gets 10x ≥ 10, leading to x ≥ 1. A candidate who multiplies by 2 instead of dividing gets x ≥ 20.
- (c) 17.7 cm — Method: the iteration converges on x, the depth of the box, which is also the side of each square cut away; a square is removed from both ends of the 20 cm side, so the longer side of the base is 20 − 2x. Run the formula three times, then carry out that subtraction. Working: x₁ = (16 × 1² − 1³ + 50) ÷ 60 = 65 ÷ 60 = 1.08333…; x₂ = 67.50636… ÷ 60 = 1.12510…; x₃ = 68.82959… ÷ 60 = 1.14715…. The longer side of the base is 20 − 2 × 1.14715… = 17.70568…, which is 17.7 cm correct to 1 decimal place. Answer: 17.7 cm. The distractors: 1.1 cm is x₃ itself rounded, the depth of the box, given by a candidate who runs the iteration correctly and then stops before the step the question actually asks for; 18.9 cm is 20 − 1.14715…, taking away one square instead of two and forgetting that a corner is cut from each end of that side; 9.7 cm is 12 − 2 × 1.14715…, the shorter side of the base, which measures the wrong edge of the sheet.
- (b) 5.00 — Continuing the iteration: x₁ = √(2 × 1 + 15) = √17 = 4.1231, x₂ = √(2 × 4.1231 + 15) = √23.2462 = 4.8214, x₃ = √(2 × 4.8214 + 15) = √24.6428 = 4.9642, x₄ = √(2 × 4.9642 + 15) = √24.9284 = 4.9928, and the values keep climbing towards 5.00 as n increases (the limit L satisfies L² = 2L + 15, so L² − 2L − 15 = 0, giving L = 5). Choosing 4.99 stops after x₄, one iteration before the value has settled fully to 5.00. Choosing 17.00 uses the value under the very first square root (2 × 1 + 15 = 17) as if that number itself were the limit. Choosing 1.00 assumes the sequence never moves from the starting value x₀.
Build your own mix at the worksheet builder.