Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A taxi firm charges a fixed fee of £3.50 plus £2.20 per mile. Work out the total cost of a journey of 6 miles.
- 2.A gardener charges a fixed fee of £15 plus £8 for each hour worked. The total charge, £T, for a job lasting h hours is given by T = 15 + 8h. Work out the charge for a job lasting 4 hours, and identify what kind of statement T = 15 + 8h is.
- 3.Harry is 14 years old and Mia is 8 years old. Will Harry ever be exactly twice as old as Mia? Give a reason for your answer.
- 4.A ball's height, h metres, t seconds after being thrown follows h = (t − 1)(9 − t). Given that the ball is at ground level at t = 1 and t = 9, work out at what time t the ball reaches its maximum height, using symmetry.
- 5.The point (20, 21) lies on the circle x² + y² = 841, which has centre O(0, 0). The tangent to the circle at (20, 21) crosses the x-axis at P and the y-axis at Q. Work out the area of triangle OPQ, correct to 1 decimal place.
- 6.Solve 5x² − 15x = 0.
- 7.The tangent to a curve at the point where x = 4 passes through the points (2, 5) and (6, 21). Use these two points to estimate the gradient of the curve at x = 4.
- 8.A car's speed-time graph shows the following: its speed increases steadily from 0 m/s to 20 m/s over the first 10 seconds, then stays constant at 20 m/s for the next 15 seconds. Work out the total distance travelled in the first 25 seconds.
- 9.Kai writes the expression 8 − 3x + 5x² and says it has three terms. Ryan says it only has two terms because a number on its own is not a term. Work out the correct number of terms in the expression.
- 10.A square tile has an area of 144 cm². Work out the side length of the tile.
- 11.The equation x² − 3x − 7 = 0 can be solved using the iterative formula xₙ₊₁ = √(3xₙ + 7). The starting value is x₀ = 4, so x₁ is the value after the formula has been used once. Work out x₃ correct to 3 decimal places.
- 12.A Fibonacci-type sequence is defined by aₙ = aₙ₋₁ + aₙ₋₂ for n ≥ 3. Given that a₁ = 5 and a₃ = 17, work out a₂.
- 13.A model rocket's height is given by h = −5t² + 20t, where h is in metres and t is in seconds. A student says the graph of h against t is n-shaped. Which statement gives the correct verdict on the SHAPE and the reason that settles it from the equation?
- 14.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 15.The diagram shows a distance–time graph for a cyclist travelling at a constant speed, for the first 6 minutes of a journey. Distance is in kilometres and time is in minutes. Work out how far the cyclist would travel in 20 minutes at the same speed.
Answer key
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (c) No — that moment has already passed — Method: call the number of years from now x, add x to both ages, form the equation from the comparison and then interpret the value of x that comes out. Working: in x years Harry will be 14 + x and Mia will be 8 + x, so 14 + x = 2(8 + x); expanding gives 14 + x = 16 + 2x, and subtracting x and 16 from both sides gives x = −2. A negative value of x places the moment two years in the past, when Harry was 12 and Mia was 6 and 12 = 2 × 6, so it is not something still to come. Answer: no — that moment has already passed. The distractors: the claim that it has never happened and never will comes from reaching x = −2 and reading a negative number of years as no solution at all, when x = −2 does not say that no such moment exists but says where it is — two years before now; the claim that it happens when Harry is 16 comes from doubling Mia's present age, 2 × 8 = 16, and reading that as the age Harry has to reach; the claim that it happens when Harry is 20 comes from expanding 2(8 + x) as 8 + 2x, doubling only the x, which gives x = 6.
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
- (c) x = 0 or x = 3 — Method: take out the common factor 5x: 5x(x − 3) = 0, so 5x = 0 or x − 3 = 0, giving x = 0 or x = 3. Distractor origins: x = 0 or x = 15 comes from forgetting to divide the second term by the common factor 5x correctly, leaving 15 instead of 3; x = 3 loses the solution x = 0 by dividing both sides by x; x = 5 or x = 3 mistakes the coefficient 5 itself for one of the solutions.
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (d) 400 m — The distance travelled equals the area under the speed-time graph. The first 10 seconds form a triangle with base 10 and height 20, giving an area of 0.5 × 10 × 20 = 100 m. The next 15 seconds form a rectangle with base 15 and height 20, giving an area of 15 × 20 = 300 m. The total distance is 100 + 300 = 400 m. The option 500 m treats the whole 25 seconds as travelled at the constant 20 m/s, ignoring that the speed was building up during the first 10 seconds: 25 × 20 = 500. The option 300 m only counts the constant-speed section and forgets the triangle section entirely. The option 200 m comes from working out the triangle's area without halving it (10 × 20 = 200) and forgetting the rectangle altogether.
- (b) 3 — Method: a term is any part of an expression separated from the rest by a + or − sign, including a number on its own. Working: 8 − 3x + 5x² splits at the + and − signs into 8, −3x and 5x² — that is three separate terms. Answer: 3. Ryan's answer of 2 comes from wrongly excluding the number 8, thinking a term must contain a letter. 5 comes from miscounting by treating the coefficients and powers as separate terms as well as the letters. 1 comes from treating the whole expression as a single term because it is written without brackets.
- (c) 12 cm — For a square, area = side². So side² = 144, giving side = ±12. Since a length must be positive, the side length is 12 cm. A candidate who gives both square roots without rejecting the negative one, which cannot be a length, answers 12 cm or −12 cm. A candidate who halves 144 instead of taking its square root gets 72 cm. A candidate who divides 144 by 4, confusing the area formula with a perimeter calculation, gets 36 cm.
- (d) 4.521 — x₁ = √(3 × 4 + 7) = √19 = 4.358898944. x₂ = √(3 × 4.358898944 + 7) = √20.076696833 = 4.480702716. x₃ = √(3 × 4.480702716 + 7) = √20.442108148 = 4.521294964, which rounds to 4.521. Mislabelling the starting value x₀ as x₁, so that the working stops one iteration too early, reports the true x₂ = 4.480702716, which rounds to 4.481. Working out one iteration too many reports the true x₄ = √(3 × 4.521294964 + 7) = 4.534741987, which rounds to 4.535. Applying the formula in the wrong order, calculating √(3xₙ) + 7 at every step instead of √(3xₙ + 7), gives, from x₀ = 4: √12 + 7 = 10.464101615, then √(3 × 10.464101615) + 7 = 12.602883619, then √(3 × 12.602883619) + 7 = 13.148873950, which rounds to 13.149.
- (d) 12 — Since a₃ = a₂ + a₁, rearranging gives a₂ = a₃ − a₁ = 17 − 5 = 12. 22 comes from adding instead of subtracting: a₃ + a₁ = 17 + 5 = 22. 11 comes from treating the sequence as if it were arithmetic and averaging the two given terms: (5 + 17) ÷ 2 = 11 — but a Fibonacci-type sequence isn't arithmetic, so this doesn't apply. −12 comes from subtracting in the wrong order: a₁ − a₃ = 5 − 17 = −12.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (b) 10 km — Method: find the constant speed from the graph (distance ÷ time for any point on the line), then multiply that speed by 20 minutes. Working: the line passes through (4 minutes, 2 km), so the speed is 2 ÷ 4 = 0.5 km per minute; in 20 minutes the cyclist travels 0.5 × 20 = 10 km. Answer: 10 km. Distractor refutation: 3 km comes from reading off the distance shown at the end of the plotted section (6 minutes) and stopping there, instead of extending the line to 20 minutes. 20 km comes from misreading the speed as 1 km per minute instead of 0.5 km per minute, doubling the true rate. 40 km comes from dividing 20 by the speed instead of multiplying by it, a reciprocal mix-up.
Build your own mix at the worksheet builder.