Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A colony of bacteria doubles in number every hour. At 9am there are 5 bacteria in the colony. Work out how many bacteria there will be at 12 noon.
- 2.By completing the square, find the turning point of the curve y = 3x² + 12x + 7.y = 3x² + 12x + 7
- 3.A car park charges by the hour. Parking for 1 hour costs £5, 2 hours costs £9, 3 hours costs £13 and 4 hours costs £17, with the cost increasing by the same amount for each extra hour. Work out an expression, in terms of n, for the cost, in pounds, of parking for n hours.
- 4.Three consecutive integers add up to 72. Using n for the smallest integer, form an equation and solve it to find the smallest of the three integers.
- 5.A car's speed, in m/s, during a journey is: 0 at t = 0 s, 8 at t = 4 s, and 8 (constant) from t = 4 s to t = 10 s, increasing at a constant rate between t = 0 and t = 4. Estimate the total distance the car travels, using the areas of a triangle and a rectangle.
- 6.The formula connecting distance (d), speed (s) and time (t) is d = st. Make s the subject of the formula.
- 7.A plumber charges a call-out fee plus an hourly rate. The total cost, y in pounds, of a job lasting x hours is given by y = 45x + 60. Work out the total cost of a job that lasts 3 hours.y = 45x + 60
- 8.A tram travels between two stops. Its velocity-time graph consists of straight line segments joining the points (0, 0), (5, 20), (12, 20), (16, 4) and (20, 4), where time is in seconds and velocity is in m/s. Work out the average speed of the tram over the whole 20 seconds. Give your answer to 1 decimal place.
- 9.A gas company charges a standing charge plus a rate per unit used. The total cost, y in pounds, for using x units is given by y = 0.15x + 20. Work out the cost of using 200 units.y = 0.15x + 20
- 10.The equation x² − 4x − 1 = 0 can be solved using the iterative formula xₙ₊₁ = √(4xₙ + 1). The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₂ correct to 3 decimal places.
- 11.A cyclist's speed-time graph is described as follows: speed increases steadily from 0 m/s to 8 m/s over the first 4 seconds, stays constant at 8 m/s for the next 6 seconds, then decreases steadily to 0 m/s over the final 2 seconds. Work out the total distance travelled.
- 12.A taxi fare in pounds is given by F = 2.50 + 1.20m, where m is the number of miles travelled. Sam takes a taxi for a journey of 6 miles. Work out the fare.
- 13.The graph of P = 480 ÷ V shows how the pressure, P pascals, of a gas depends on its volume, V cm³, at constant temperature. Use the relationship to work out the volume when the pressure is 32 pascals, and then work out by how much the volume increases when the pressure drops to 24 pascals.
- 14.The equation 7x = x² + 3 can be solved using the iterative formula xₙ₊₁ = (xₙ² + 3) ÷ 7. Taking x₀ = 0.4, x₁ = 0.4514 correct to 4 decimal places. Using the full unrounded value of x₁, work out x₂ correct to 3 decimal places.
- 15.A closed cylinder has radius r cm and height (r + 5) cm. Its volume is 300 cm³, giving the equation πr²(r + 5) = 300, which can be solved using the iterative formula rₙ₊₁ = √(300 ÷ (π(rₙ + 5))). Taking r₀ = 3, work out r₃ correct to 2 decimal places.
Answer key
- (a) 40 — From 9am to 12 noon is 3 hours, so the population doubles three times: 5 × 2³ = 40. A candidate who counts the elapsed time as 4 hours (an off-by-one counting error) would reach 5 × 2⁴ = 80. A candidate who counts it as only 2 hours would reach 5 × 2² = 20. A candidate who misreads 'doubles' as 'increases by 2' each hour would compute 5 + 3 × 2 = 11.
- (d) x = −2, y = −5 — 3x² + 12x + 7 rewrites as 3(x² + 4x) + 7, then as 3[(x + 2)² − 4] + 7, which simplifies to 3(x + 2)² − 5, since −3 × 4 + 7 = −5. Substituting x = −2: 3 × (−2)² = 12, 12 × (−2) = −24, so 12 − 24 + 7 = −5, confirming the minimum value −5 at x = −2: turning point x = −2, y = −5. Halving b instead of halving b/a — using −4 as the shift instead of −2 — lands on turning point x = −4, y = −41, which is wrong because when a ≠ 1 the shift inside the bracket is b/(2a), not b/a alone. Reading the bracket's sign directly as the turning point's x-coordinate gives x = 2, y = −5 — wrong, because (x + 2)² is zero at x = −2, not x = 2. Computing 12 − 7 = 5 instead of 7 − 12 = −5 flips the sign of the constant, giving x = −2, y = 5 — wrong, since the completed square's constant must be evaluated as 7 minus 12, not 12 minus 7. Whenever a ≠ 1, factor a out of the x² and x terms first, and always check a turning point by substituting back into the original equation.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (d) 23 — Method: let the smallest integer be n, so the three consecutive integers are n, n + 1 and n + 2. Form the equation n + (n + 1) + (n + 2) = 72. Working: simplify the left side: 3n + 3 = 72, so 3n = 69, giving n = 23. Answer: 23. 24 comes from dividing 72 by 3 directly, 72 ÷ 3 = 24, which finds the middle integer rather than realising the three numbers differ. 25 comes from correctly finding n = 23 but reading off the largest integer, n + 2, instead of the smallest as asked. 21 comes from dividing first and subtracting after, (72 ÷ 3) − 3, instead of subtracting 3 before dividing by 3.
- (c) 64 m — The distance travelled is the area under the speed-time graph. From t = 0 to t = 4, the shape is a triangle with base 4 and height 8, area 1/2 × 4 × 8 = 16. From t = 4 to t = 10, the shape is a rectangle with base 6 and height 8, area 6 × 8 = 48. Total distance: 16 + 48 = 64 m. Treating the whole 10 seconds as a single trapezium with parallel sides 0 and 8 and width 10, instead of splitting it into the triangle and rectangle, gives 40 m. Ignoring the acceleration phase completely and assuming the car travels at a constant 8 m/s for all 10 seconds gives 8 × 10 = 80 m. Misreading the second interval as running from t = 4 to t = 8 instead of t = 4 to t = 10 gives a rectangle area of 4 × 8 = 32, plus the correct triangle of 16, totalling 48 m.
- (b) s = d / t — Method: undo the multiplication by t by dividing both sides by t. Working: d = st, so dividing both sides by t gives s = d / t. The value s = dt comes from multiplying by t instead of dividing. The value s = t / d comes from inverting the fraction, dividing t by d instead of d by t. The value s = d − t comes from subtracting t instead of dividing by it.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (b) 12.7 m/s — Find the total distance from the area under the graph, then divide by the total time. Break the graph into its four straight sections: a triangle from (0, 0) to (5, 20), where 5 × 20 = 100 gives an area of 50 m when halved; a rectangle from (5, 20) to (12, 20), area 7 × 20 = 140 m; a trapezium from (12, 20) to (16, 4), where (20 + 4) × 4 = 96 gives an area of 48 m when halved; and a rectangle from (16, 4) to (20, 4), area 4 × 4 = 16 m — a total distance of 50 + 140 + 48 + 16 = 254 m. Dividing by the 20 seconds gives an average speed of 254 ÷ 20 = 12.7 m/s. Writing 15.1 m/s comes from forgetting to halve the trapezium area for the third section, using 96 instead of 48: a total of 302 m, and 302 ÷ 20 = 15.1 m/s. Writing 11.9 m/s comes from leaving out the final section, from (16, 4) to (20, 4), entirely: a total of 238 m, and 238 ÷ 20 = 11.9 m/s. Writing 12.1 m/s comes from dividing the correct total distance by 21 instead of 20 — a fencepost slip, counting the whole seconds from t = 0 to t = 20 inclusive as 21 seconds of travel rather than reading the journey as a duration of 20 seconds: 254 ÷ 21 = 12.1 m/s (1 d.p.).
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (c) 3.153 — x₁ = √(4 × 1 + 1) = √5 = 2.236067977. x₂ = √(4 × 2.236067977 + 1) = √9.944271908 = 3.153453965, which rounds to 3.153. Reporting x₁ instead of x₂ gives 2.236067977, which rounds to 2.236. A sign error inside the root, using xₙ₊₁ = √(4xₙ − 1) instead of √(4xₙ + 1), gives x₁ = √3 = 1.732050808 and x₂ = √(4 × 1.732050808 − 1) = √5.928203232 = 2.434790182, which rounds to 2.435. Applying the formula in the wrong order, working out √(4xₙ) + 1 at every step instead of √(4xₙ + 1), gives x₁ = √4 + 1 = 3 and x₂ = √(4 × 3) + 1 = 4.464101615, which rounds to 4.464.
- (c) 72 m — The first section is a triangle with base 4 s and height 8 m/s, area = 1/2 × 4 × 8 = 16 m. The middle section is a rectangle with base 6 s and height 8 m/s, area = 6 × 8 = 48 m. The final section is a triangle with base 2 s and height 8 m/s, area = 1/2 × 2 × 8 = 8 m. Total distance = 16 + 48 + 8 = 72 m. Treating both sloping sections as full rectangles instead of triangles — forgetting the factor of a half — gives 4 × 8 + 6 × 8 + 2 × 8 = 96 m, which is wrong because a sloping speed-time section is a triangle, not a rectangle. Leaving out the final, decreasing section entirely gives 16 + 48 = 64 m, which is wrong because the cyclist is still moving and covering distance while slowing down. Leaving out the middle, constant-speed section gives 16 + 8 = 24 m, which is wrong because the cyclist covers the most distance of all during the 6 seconds of constant speed.
- (c) £9.70 — F = 2.50 + 1.20 × 6 = 2.50 + 7.20 = £9.70. £7.20 comes from forgetting to add the £2.50 fixed charge. £10.20 comes from adding the 2.50 to the number of miles before multiplying by 1.20, 1.20 × (6 + 2.50). £22.20 comes from adding the fixed charge and the rate together first and then multiplying by the miles, (2.50 + 1.20) × 6.
- (b) 5 cm³ — When P = 32, V = 480 ÷ 32 = 15 cm³. When P = 24, V = 480 ÷ 24 = 20 cm³. The increase in volume is 20 − 15 = 5 cm³. Giving only the second volume, 20 cm³, forgets to subtract the first volume. Giving only the first volume, 15 cm³, answers the wrong part of the question. Subtracting the two pressures instead of the two volumes, 32 − 24 = 8, mixes up which quantity the question asks for.
- (b) 0.458 — x₁ = (0.4² + 3) ÷ 7 = 3.16 ÷ 7 = 0.4514 (unrounded, 0.451428...). x₂ = (x₁² + 3) ÷ 7 = (0.2038 + 3) ÷ 7 = 3.2038 ÷ 7 = 0.458 (3 d.p.). Choosing 0.632 divides only the 3 by 7 instead of dividing the whole sum x₁² + 3 by 7. Choosing 0.451 repeats the calculation for x₁ instead of moving on to x₂. Choosing 0.493 uses x₁ itself instead of x₁² inside the formula.
- (b) 3.38 — r₁ = √(300 ÷ (π × 8)) = √11.9366 = 3.4550. r₂ = √(300 ÷ (π × 8.4550)) = √11.2947 = 3.3608. r₃ = √(300 ÷ (π × 8.3608)) = √11.4232 = 3.3798, which rounds to 3.38. Choosing 3.36 stops at r₂, one iteration too early. Choosing 4.82 leaves out the '+ 5' inside the bracket, dividing by π × rₙ instead of π × (rₙ + 5). Choosing 3.45 comes from using π ≈ 3 instead of the calculator's π key throughout.
Build your own mix at the worksheet builder.