Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The table shows the velocity, in m/s, of a train at various times, in seconds: 0 at t = 0, 20 at t = 4, 35 at t = 10, 27 at t = 14. Assuming the velocity changes at a constant rate between each pair of readings, estimate the distance the train travels between t = 0 and t = 12, using the trapezium rule.
- 2.A parcel delivery company's cost graph shows the following: the cost is a flat £5 for parcels weighing up to 2 kg, and then rises by £2 for each additional kg above 2 kg. Use the graph to work out the weight of a parcel that costs £17.
- 3.A circular pond has equation x² + y² = 20, with lengths in metres from the centre of the garden. A straight path runs along the line y = 2x, entering the pond and leaving it again. Work out the coordinates of the two points where the path meets the edge of the pond.y = 2x
- 4.A gardener charges a fixed fee of £15 plus £8 for each hour worked. The total charge, £T, for a job lasting h hours is given by T = 15 + 8h. Work out the charge for a job lasting 4 hours, and identify what kind of statement T = 15 + 8h is.
- 5.A phone plan costs a fixed £15 per month plus 8p per minute of calls. In one month, Jamal's bill was £23.80. Form an equation using m for the number of minutes, and solve it to find how many minutes Jamal used that month.
- 6.A gas company charges a standing charge plus a rate per unit used. The total cost, y in pounds, for using x units is given by y = 0.15x + 20. Work out the cost of using 200 units.y = 0.15x + 20
- 7.Solve 5x² − 15x = 0.
- 8.A plumber charges a call-out fee of £30 plus £25 per hour worked. Work out the total charge for a job that takes 3 hours.
- 9.A tram travels between two stops. Its velocity-time graph consists of straight line segments joining the points (0, 0), (5, 20), (12, 20), (16, 4) and (20, 4), where time is in seconds and velocity is in m/s. Work out the average speed of the tram over the whole 20 seconds. Give your answer to 1 decimal place.
- 10.An allotment is in the shape of a rectangle. Its length is 5 m more than its width, x metres, and its area is 20 m². This gives x² + 5x − 20 = 0, which can be solved using the iterative formula xₙ₊₁ = 20 ÷ (xₙ + 5). Taking x₀ = 2, so that x₁ is the value found after the formula has been used once, work out x₂ correct to 2 decimal places.
- 11.A distance-time graph is a straight line from (0, 0) to (4, 100), where time is in hours and distance is in kilometres. Work out the gradient of the line.
- 12.The graph of y = x² − 2x − 8 takes these values: when x = −2, y = 0; when x = −1, y = −5; when x = 0, y = −8; when x = 3, y = −5; when x = 4, y = 0. Use these values to write down the two solutions of x² − 2x − 8 = 0.y = x² − 2x − 8
- 13.The formula connecting speed, distance and time is v = s ÷ t. Work out v, in km/h, when s = 180 and t = 4.
- 14.Points A(−1, 2) and B(5, 8) are the endpoints of a line segment. Work out the equation of the perpendicular bisector of AB.
- 15.Look at the statement 2x + 5 = 17. Considering whether it is an expression, an equation, a formula, or an identity, which classification is correct?
Answer key
- (a) 271 m — The reading at t = 12 isn't in the table, so it must be interpolated between t = 10 (35 m/s) and t = 14 (27 m/s): the velocity falls by 8 m/s over the 4-second gap, so over 2 seconds it falls by 4 m/s, giving 35 − 4 = 31 m/s. The trapezium rule then uses three strips of unequal width, 4, 6 and 2 seconds, with areas of 40, 165 and 66: 40 + 165 + 66 = 271 m. Writing 267 m comes from skipping the interpolation and using the table's t = 14 reading, 27, directly as the height at t = 12. Writing 282 m comes from treating all three strips as though they were 4 seconds wide, instead of using the true gaps of 4, 6 and 2 seconds between the readings. Writing 275 m comes from using the t = 10 reading, 35, at both ends of the final strip, instead of interpolating a new value at t = 12.
- (b) 8 kg — The cost above the flat £5 charge is 17 − 5 = £12. At £2 per kg, this covers 12 ÷ 2 = 6 kg above the first 2 kg, so the total weight is 2 + 6 = 8 kg. Dividing the full £17 by £2 per kg without first taking off the £5 flat charge gives 17 ÷ 2 = 8.5 kg. Taking off the £5 flat charge and dividing by £2 per kg, but forgetting to add back the 2 kg that the flat charge covers, gives 12 ÷ 2 = 6 kg. Taking off £2 instead of £5 as the flat charge, (17 − 2) ÷ 2 = 7.5 kg, swaps which number is the fixed fee.
- (b) (2, 4) and (−2, −4) — Substitute y = 2x into x² + y² = 20: x² + (2x)² = 20, which gives x² + 4x² = 20, so 5x² = 20, x² = 4, and x = 2 or x = −2. Using y = 2x for each x-value: x = 2 gives y = 4; x = −2 gives y = −4. The path meets the pond's edge at (2, 4) and (−2, −4). Distractor routes: (2, −4) and (−2, 4) swaps the sign pairing, matching each x-value with the wrong sign of y instead of keeping each x with its own correctly-signed y. (2, 1) and (−2, −1) comes from using y = x/2 instead of y = 2x when finding the y-coordinates. (2, 4) alone stops after the positive square root of x² = 4 and never finds the second point from x = −2.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (c) x = 0 or x = 3 — Method: take out the common factor 5x: 5x(x − 3) = 0, so 5x = 0 or x − 3 = 0, giving x = 0 or x = 3. Distractor origins: x = 0 or x = 15 comes from forgetting to divide the second term by the common factor 5x correctly, leaving 15 instead of 3; x = 3 loses the solution x = 0 by dividing both sides by x; x = 5 or x = 3 mistakes the coefficient 5 itself for one of the solutions.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (b) 12.7 m/s — Find the total distance from the area under the graph, then divide by the total time. Break the graph into its four straight sections: a triangle from (0, 0) to (5, 20), where 5 × 20 = 100 gives an area of 50 m when halved; a rectangle from (5, 20) to (12, 20), area 7 × 20 = 140 m; a trapezium from (12, 20) to (16, 4), where (20 + 4) × 4 = 96 gives an area of 48 m when halved; and a rectangle from (16, 4) to (20, 4), area 4 × 4 = 16 m — a total distance of 50 + 140 + 48 + 16 = 254 m. Dividing by the 20 seconds gives an average speed of 254 ÷ 20 = 12.7 m/s. Writing 15.1 m/s comes from forgetting to halve the trapezium area for the third section, using 96 instead of 48: a total of 302 m, and 302 ÷ 20 = 15.1 m/s. Writing 11.9 m/s comes from leaving out the final section, from (16, 4) to (20, 4), entirely: a total of 238 m, and 238 ÷ 20 = 11.9 m/s. Writing 12.1 m/s comes from dividing the correct total distance by 21 instead of 20 — a fencepost slip, counting the whole seconds from t = 0 to t = 20 inclusive as 21 seconds of travel rather than reading the journey as a duration of 20 seconds: 254 ÷ 21 = 12.1 m/s (1 d.p.).
- (a) 2.55 — x₁ = 20 ÷ (2 + 5) = 20 ÷ 7 = 2.857142857. x₂ = 20 ÷ (2.857142857 + 5) = 20 ÷ 7.857142857 = 2.545454545, which rounds to 2.55. Reporting x₁ instead of x₂ gives 2.857142857, which rounds to 2.86. Dropping the +5 in the denominator, using xₙ₊₁ = 20 ÷ xₙ, gives x₁ = 20 ÷ 2 = 10 and x₂ = 20 ÷ 10 = 2, which is 2.00. A sign error in the denominator, using xₙ₊₁ = 20 ÷ (xₙ − 5), gives x₁ = 20 ÷ (2 − 5) = −6.666666667 and x₂ = 20 ÷ (−6.666666667 − 5) = −1.714285714, which rounds to −1.71.
- (a) 25 — Gradient = change in y ÷ change in x = (100 − 0) ÷ (4 − 0) = 100 ÷ 4 = 25. Dividing time by distance instead of distance by time gives 0.04; multiplying the two values instead of dividing gives 400; stopping at the change in distance, 100, forgets to divide by the change in time.
- (c) x = −2 or x = 4 — The solutions of x² − 2x − 8 = 0 are the x-values where y = 0. From the table, y = 0 when x = −2 and when x = 4, so those are the two solutions. Distractor origins: x = −1 or x = 3 picks the pair of x-values that give equal (but non-zero) y-values instead of y = 0; x = 0 or x = −8 mixes up an x-value with its corresponding y-value; x = −2 only reads off one of the two roots and misses the other.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (d) x + y = 7 — The midpoint of AB is (−1 + 5)/2, (2 + 8)/2, which is (2, 5). The gradient of AB is (8 − 2)/(5 − (−1)) = 6/6 = 1. The perpendicular bisector has gradient −1 and passes through (2, 5): y − 5 = −(x − 2), which rearranges to x + y = 7. Distractor routes: x − y = −3 uses the gradient of AB itself, 1, rather than its negative reciprocal, giving a line PARALLEL to AB through the midpoint instead of perpendicular to it. x + y = 12 comes from adding the y-coordinates, 2 + 8 = 10, but forgetting to divide by 2, using the midpoint (2, 10) instead of (2, 5). x + y = 4 comes from using A's x-coordinate, −1, directly instead of averaging it with B's, giving the point (−1, 5) instead of the true midpoint (2, 5).
- (d) An equation, true for one value of x — 2x + 5 = 17 is only true when x = 6, so it is an equation. A candidate who ignores the equals sign and focuses only on the x terms and numbers present picks the expression option. A candidate who sees an equals sign and assumes it must relate two different quantities, as a formula does, picks that option, missing that there is only one quantity, x, involved here. A candidate who wrongly checks whether both sides look similar in structure rather than testing specific values picks the identity option, missing that the two sides are not equal for every value of x.
Build your own mix at the worksheet builder.