Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The table shows the height, in metres, of a firework rocket at various times, in seconds, during its flight: 40 at t = 2, 54 at t = 3, and 60 at t = 4. Use the chord between t = 2 and t = 4 to estimate the gradient of the height-time graph at t = 3, stating the correct units.
- 2.The table shows the speed, in m/s, of a car at times, in seconds, all 2 seconds apart: 0 at t = 0, 3 at t = 2, 8 at t = 4, 15 at t = 6, 24 at t = 8. A student uses the trapezium rule with these five readings to estimate the distance the car travels. By finding the second differences of the speed values, decide whether this trapezium estimate is an overestimate or an underestimate of the true distance.
- 3.The tangent to a curve at the point where x = 4 passes through the points (2, 5) and (6, 21). Use these two points to estimate the gradient of the curve at x = 4.
- 4.A tram sets off from a stop. Its velocity-time graph rises in a straight line from 0 m/s to 12 m/s over the first 8 seconds, then stays constant at 12 m/s for a further 10 seconds. Work out the total distance the tram travels in these 18 seconds, using the area under the graph.
- 5.The iterative formula xₙ₊₁ = √(2xₙ + 15) is used repeatedly, starting from x₀ = 1. Work out the value that xₙ approaches, correct to 2 decimal places.
- 6.A gas company charges a standing charge plus a rate per unit used. The total cost, y in pounds, for using x units is given by y = 0.15x + 20. Work out the cost of using 200 units.y = 0.15x + 20
- 7.Two numbers have a sum of 45. The larger number is 9 more than the smaller number. Form an equation using n for the smaller number, and solve it to find the larger number.
- 8.Show that the equation x³ − x − 3 = 0 has a solution between x = 1 and x = 2, by working out f(1) and f(2), where f(x) = x³ − x − 3.y = x
- 9.A colony of bacteria doubles in number every hour. At 9am there are 5 bacteria in the colony. Work out how many bacteria there will be at 12 noon.
- 10.A cinema sells adult tickets for £10 and child tickets for £6. A family group buys 9 tickets in total, spending £74. Work out how many adult tickets were bought.
- 11.The graph of y = 60 × (0.5)ˣ is sketched for x ≥ 0. Which statement correctly describes what happens to the curve as x increases?
- 12.A cyclist's distance-time graph shows the following: she travels 12 km in the first 30 minutes at a steady speed, then rests for 30 minutes, then travels a further 8 km in the next 15 minutes. Work out her average speed, in km/h, for the whole journey.
- 13.A phone plan costs a fixed £15 per month plus 8p per minute of calls. In one month, Jamal's bill was £23.80. Form an equation using m for the number of minutes, and solve it to find how many minutes Jamal used that month.
- 14.The formula for the energy stored in a stretched spring is E = (1/2)kx², where E is in joules, k is the spring constant in N/m and x is the extension in m. A spring with a spring constant of 40 N/m is stretched so that its extension is 0.3 m. Work out the energy stored in the spring.
- 15.A water tank is a cuboid with a square base of side x metres and height (x + 1) metres. Its volume is 10 m³. This gives x³ + x² − 10 = 0, which can be solved using the iterative formula xₙ₊₁ = ∛(10 − xₙ²). Taking x₀ = 2, so that x₁ is the value found after the formula has been used once, work out x₃ correct to 3 decimal places.
Answer key
- (c) 10 m/s — A symmetric chord gradient uses the two points either side of t = 3: (2, 40) and (4, 60). The gradient is the change in height divided by the change in time: (60 − 40) ÷ (4 − 2) = 20 ÷ 2 = 10 m/s. Using only the values either side of one gap, (2, 40) and (3, 54), instead of the full symmetric chord, gives (54 − 40) ÷ (3 − 2) = 14 m/s. Getting the correct number but dropping the time unit, leaving only metres, gives 10 m. Dividing time by height instead of height by time inverts the calculation to (4 − 2) ÷ (60 − 40) = 0.1 s/m.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (d) 168 m — Split the area under the graph into two parts. The rising section (0 to 8 s) is a triangle: area = 0.5 × 8 × 12 = 48. The constant section, from 8 s to 18 s (10 s), is a rectangle: area = 12 × 10 = 120. Total distance = 48 + 120 = 168 m. Leaving out the 0.5 doubles the triangle, giving 8 × 12 + 120 = 216 m; ignoring the triangle section altogether gives only 120 m; averaging the start and final speeds over the whole 18 seconds, (0 + 12) ÷ 2 = 6, then 6 × 18 = 108 m, wrongly treats the tram as accelerating the whole time, when the graph is flat for the last 10 seconds.
- (b) 5.00 — Continuing the iteration: x₁ = √(2 × 1 + 15) = √17 = 4.1231, x₂ = √(2 × 4.1231 + 15) = √23.2462 = 4.8214, x₃ = √(2 × 4.8214 + 15) = √24.6428 = 4.9642, x₄ = √(2 × 4.9642 + 15) = √24.9284 = 4.9928, and the values keep climbing towards 5.00 as n increases (the limit L satisfies L² = 2L + 15, so L² − 2L − 15 = 0, giving L = 5). Choosing 4.99 stops after x₄, one iteration before the value has settled fully to 5.00. Choosing 17.00 uses the value under the very first square root (2 × 1 + 15 = 17) as if that number itself were the limit. Choosing 1.00 assumes the sequence never moves from the starting value x₀.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (a) 27 — Method: let the smaller number be n, so the larger number is n + 9. Form the equation n + (n + 9) = 45. Working: simplify: 2n + 9 = 45, so 2n = 36, giving n = 18. The larger number is 18 + 9 = 27. Answer: 27. 18 is the smaller number, found correctly, but given as the answer to the question asking for the larger number. 22.5 comes from ignoring the "9 more" part and simply halving the total, 45 ÷ 2. 36 comes from a sign error when isolating the constant, treating the equation as 2n = 45 + 9 instead of 2n = 45 − 9.
- (b) f(1) = −3 and f(2) = 3 — f(1) = 1³ − 1 − 3 = 1 − 1 − 3 = −3. f(2) = 2³ − 2 − 3 = 8 − 2 − 3 = 3. Since f(1) is negative and f(2) is positive, there is a change of sign, so a solution lies between x = 1 and x = 2. Dropping the −x term entirely gives f(1) = 1 − 3 = −2 and f(2) = 8 − 3 = 5. Using x² instead of x³ throughout gives f(1) = 1 − 1 − 3 = −3, which happens to coincide with the correct value at x = 1, but f(2) = 4 − 2 − 3 = −1, which does not show a change of sign at all. Working out −f(x) instead of f(x), a sign-flip error, gives f(1) = 3 and f(2) = −3, the correct sizes but with both signs reversed.
- (a) 40 — From 9am to 12 noon is 3 hours, so the population doubles three times: 5 × 2³ = 40. A candidate who counts the elapsed time as 4 hours (an off-by-one counting error) would reach 5 × 2⁴ = 80. A candidate who counts it as only 2 hours would reach 5 × 2² = 20. A candidate who misreads 'doubles' as 'increases by 2' each hour would compute 5 + 3 × 2 = 11.
- (c) 5 — Method: let a be the number of adult tickets, so the number of child tickets is 9 − a. Form the equation 10a + 6(9 − a) = 74. Working: expand the bracket: 10a + 54 − 6a = 74, so 4a = 20, giving a = 5. Answer: 5 adult tickets. 4 comes from correctly finding the number of child tickets but reporting it instead of the number of adult tickets asked for. 1.25 comes from a sign error expanding the bracket, writing 10a + 54 + 6a = 74 instead of subtracting, which gives 16a = 20. 7.4 comes from dividing the total takings by the adult ticket price only, ignoring the children entirely, 74 ÷ 10.
- (a) It gets closer to zero but never actually reaches it. — y = 60 × (0.5)ˣ is always positive, however large x is, because a positive number raised to any power stays positive. As x increases, (0.5)ˣ gets smaller and smaller but never equals zero, so y approaches zero without ever reaching it. Believing the curve reaches zero when x = 60, because 60 is the starting value, mixes up the y-intercept with a stopping point — an exponential decay curve like this one never actually reaches the x-axis, so this is wrong. Believing the curve goes negative for large x is wrong because multiplying a positive number by (0.5) any number of times can never produce a negative result. Believing the curve levels off at y = 0.5, confusing the base of the exponential with its eventual level, is wrong: the base only controls how fast the curve falls, not where it settles — this curve settles at y = 0, not y = 0.5. Whenever you sketch an exponential decay curve, draw it approaching the x-axis but never touching it.
- (c) 16 km/h — Method: total distance = 12 + 8 = 20 km. Total time = 30 + 30 + 15 = 75 minutes = 1.25 hours. Average speed = total distance ÷ total time = 20 ÷ 1.25 = 16 km/h. Distractor origins: 20 km/h gives the total distance without ever dividing by the total time; 24 km/h uses only the speed of the first stage (12 km in 30 minutes), ignoring the second stage and the rest; 28 km/h averages the two separate stage speeds, 24 km/h and 32 km/h, instead of using total distance over total time.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (a) 1.861 — x₁ = ∛(10 − 2²) = ∛6 = 1.817120593. x₂ = ∛(10 − 1.817120593²) = ∛6.698072751 = 1.885022855. x₃ = ∛(10 − 1.885022855²) = ∛6.446688837 = 1.861139399, which rounds to 1.861. Reporting x₂ instead of x₃ gives 1.885022855, which rounds to 1.885. Stopping after the first iteration and reporting x₁ instead of x₃ gives 1.817120593, which rounds to 1.817. A sign error inside the cube root, using xₙ₊₁ = ∛(10 + xₙ²) instead of ∛(10 − xₙ²), gives x₁ = ∛14 = 2.410142264, x₂ = ∛(10 + 2.410142264²) = 2.509763724, and x₃ = ∛(10 + 2.509763724²) = 2.535437381, which rounds to 2.535.
Build your own mix at the worksheet builder.