Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A car park charges by the hour. Parking for 1 hour costs £5, 2 hours costs £9, 3 hours costs £13 and 4 hours costs £17, with the cost increasing by the same amount for each extra hour. Work out an expression, in terms of n, for the cost, in pounds, of parking for n hours.
- 2.A ferry's distance-time graph is a straight line from (0 minutes, 0 km) to (25 minutes, 15 km). Work out the ferry's speed in kilometres per hour.
- 3.The equation x² + 2x − 5 = 0 can be solved using the iterative formula xₙ₊₁ = 5/(xₙ + 2). The starting value is x₀ = 1, so x₁ is the value after the formula has been used once. Work out x₂ correct to 2 decimal places.
- 4.A taxi firm charges a fixed fee of £3.50 plus £2.20 per mile. Work out the total cost of a journey of 6 miles.
- 5.A parcel delivery company's cost graph shows the following: the cost is a flat £5 for parcels weighing up to 2 kg, and then rises by £2 for each additional kg above 2 kg. Use the graph to work out the weight of a parcel that costs £17.
- 6.The point (20, 21) lies on the circle x² + y² = 841, which has centre O(0, 0). The tangent to the circle at (20, 21) crosses the x-axis at P and the y-axis at Q. Work out the area of triangle OPQ, correct to 1 decimal place.
- 7.A cuboid has a square base of side x metres and a height that is 3 m more than x. Its volume is 150 m³. This gives the equation x³ + 3x² − 150 = 0, which can be solved using the iterative formula xₙ₊₁ = ∛(150 − 3xₙ²). Taking x₀ = 4, work out x₂ correct to 2 decimal places.
- 8.The equation x² − 3x − 7 = 0 can be solved using the iterative formula xₙ₊₁ = √(3xₙ + 7). The starting value is x₀ = 4, so x₁ is the value after the formula has been used once. Work out x₃ correct to 3 decimal places.
- 9.An exponential graph y = A × rˣ passes through the points (0, 8) and (2, 18). Work out the value of r, correct to 2 decimal places.
- 10.A phone company works out a monthly bill, £B, using the formula B = 18 + 0.05t, where £18 is the fixed monthly charge and t is the number of extra text messages sent beyond the free allowance, each charged at 5p. Farida's bill for one month is £24.50. Work out the number of extra text messages, t, she sent.
- 11.Solve the inequality 2(3x − 1) ≥ 4x + 8.
- 12.A tap fills a tank at a varying rate. A graph shows the rate of flow, in litres per minute, against time, in minutes. What does the area under this graph represent?
- 13.The table shows the height, in metres, of a firework rocket at various times, in seconds, during its flight: 40 at t = 2, 54 at t = 3, and 60 at t = 4. Use the chord between t = 2 and t = 4 to estimate the gradient of the height-time graph at t = 3, stating the correct units.
- 14.A water tank is a cuboid with a square base of side x metres and height (x + 1) metres. Its volume is 10 m³. This gives x³ + x² − 10 = 0, which can be solved using the iterative formula xₙ₊₁ = ∛(10 − xₙ²). Taking x₀ = 2, so that x₁ is the value found after the formula has been used once, work out x₃ correct to 3 decimal places.
- 15.By completing the square, find the turning point of the curve y = 3x² + 12x + 7.y = 3x² + 12x + 7
Answer key
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (a) 36 km/h — Speed is distance ÷ time. Convert 25 minutes to hours: 25 ÷ 60 = 5/12 hours. Then 15 ÷ (5/12) = 15 × 12/5 = 36 km/h. Dividing 15 by 25 without converting minutes to hours gives 0.6 km/h. Multiplying 15 by 25/60 instead of dividing by it gives 6.25 km/h. Working out the speed in km per minute, 0.6, and then multiplying by 24 instead of 60 gives 14.4 km/h.
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (b) 8 kg — The cost above the flat £5 charge is 17 − 5 = £12. At £2 per kg, this covers 12 ÷ 2 = 6 kg above the first 2 kg, so the total weight is 2 + 6 = 8 kg. Dividing the full £17 by £2 per kg without first taking off the £5 flat charge gives 17 ÷ 2 = 8.5 kg. Taking off the £5 flat charge and dividing by £2 per kg, but forgetting to add back the 2 kg that the flat charge covers, gives 12 ÷ 2 = 6 kg. Taking off £2 instead of £5 as the flat charge, (17 − 2) ÷ 2 = 7.5 kg, swaps which number is the fixed fee.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
- (b) 4.39 — x₁ = ∛(150 − 3 × 4²) = ∛(150 − 48) = ∛102 = 4.672 (unrounded). x₂ = ∛(150 − 3 × 4.672²) = ∛(150 − 65.49) = ∛84.51 = 4.39 (2 d.p.). Choosing 4.67 stops after only one iteration, giving x₁ instead of x₂. Choosing 84.51 finds the value inside the cube root for x₂ but never takes the cube root. Choosing 6.32 comes from adding 3xₙ² instead of subtracting it inside the root, which does not match the given formula.
- (d) 4.521 — x₁ = √(3 × 4 + 7) = √19 = 4.358898944. x₂ = √(3 × 4.358898944 + 7) = √20.076696833 = 4.480702716. x₃ = √(3 × 4.480702716 + 7) = √20.442108148 = 4.521294964, which rounds to 4.521. Mislabelling the starting value x₀ as x₁, so that the working stops one iteration too early, reports the true x₂ = 4.480702716, which rounds to 4.481. Working out one iteration too many reports the true x₄ = √(3 × 4.521294964 + 7) = 4.534741987, which rounds to 4.535. Applying the formula in the wrong order, calculating √(3xₙ) + 7 at every step instead of √(3xₙ + 7), gives, from x₀ = 4: √12 + 7 = 10.464101615, then √(3 × 10.464101615) + 7 = 12.602883619, then √(3 × 12.602883619) + 7 = 13.148873950, which rounds to 13.149.
- (b) 1.50 — Substituting (0, 8) gives A = 8, since r⁰ = 1. Substituting (2, 18) gives 8 × r² = 18, so r² = 18 ÷ 8 = 2.25. Taking the square root of 2.25 gives r = 1.50 (2 d.p.). Stopping after finding r² and giving 2.25 as the final answer, without taking the square root, is wrong because r² is not the same as r. Dividing r² by the exponent 2 instead of taking its square root — treating the power as something you divide by rather than root — gives 2.25 ÷ 2 = 1.13 (2 d.p.), which is wrong. Inverting the ratio, working out 8 ÷ 18 instead of 18 ÷ 8, gives 0.44 (2 d.p.), which is wrong because the LATER value must be divided by the EARLIER one to find the growth multiplier, not the other way round.
- (a) 130 — Method: substitute the total bill into the formula, then subtract the fixed charge and divide by the cost per text message. Working: 24.50 = 18 + 0.05t, so 0.05t = 24.50 − 18 = 6.50, t = 6.50 ÷ 0.05 = 130. Answer: 130 extra text messages. 490 comes from dividing the whole bill by 0.05 without first subtracting the £18 fixed charge: 24.50 ÷ 0.05 = 490. 13 comes from dividing the £6.50 by 0.5 instead of 0.05, moving the decimal point one place too far: 6.50 ÷ 0.5 = 13. 65 comes from dividing the £6.50 by 0.1 instead of 0.05.
- (b) x ≥ 5 — Expand the bracket: 2(3x − 1) = 6x − 2, so the inequality is 6x − 2 ≥ 4x + 8. Subtract 4x from both sides and add 2 to both sides: 2x ≥ 10. Divide both sides by 2: x ≥ 5. A candidate who only multiplies the 3x by 2 and forgets to multiply the −1 gets 6x − 1 ≥ 4x + 8, leading to x ≥ 4.5. A candidate who adds 4x instead of subtracting it gets 10x ≥ 10, leading to x ≥ 1. A candidate who multiplies by 2 instead of dividing gets x ≥ 20.
- (b) The total volume of water, in litres, that has flowed in. — On a rate-time graph, the y-axis is in litres per minute and the x-axis is in minutes; multiplying a rate by a time gives litres per minute × minutes = litres, a total volume. So the area under the graph represents the total volume of water that has flowed in. Thinking the area itself represents the rate, rather than what the rate accumulates to, gives the wrong claim about the average rate of flow. Confusing the area with the gradient of the graph — which measures how the rate is changing — gives the wrong claim about litres per minute squared. Ignoring the flow-rate axis and focusing only on the time axis gives the wrong claim that the area is simply the total time.
- (c) 10 m/s — A symmetric chord gradient uses the two points either side of t = 3: (2, 40) and (4, 60). The gradient is the change in height divided by the change in time: (60 − 40) ÷ (4 − 2) = 20 ÷ 2 = 10 m/s. Using only the values either side of one gap, (2, 40) and (3, 54), instead of the full symmetric chord, gives (54 − 40) ÷ (3 − 2) = 14 m/s. Getting the correct number but dropping the time unit, leaving only metres, gives 10 m. Dividing time by height instead of height by time inverts the calculation to (4 − 2) ÷ (60 − 40) = 0.1 s/m.
- (a) 1.861 — x₁ = ∛(10 − 2²) = ∛6 = 1.817120593. x₂ = ∛(10 − 1.817120593²) = ∛6.698072751 = 1.885022855. x₃ = ∛(10 − 1.885022855²) = ∛6.446688837 = 1.861139399, which rounds to 1.861. Reporting x₂ instead of x₃ gives 1.885022855, which rounds to 1.885. Stopping after the first iteration and reporting x₁ instead of x₃ gives 1.817120593, which rounds to 1.817. A sign error inside the cube root, using xₙ₊₁ = ∛(10 + xₙ²) instead of ∛(10 − xₙ²), gives x₁ = ∛14 = 2.410142264, x₂ = ∛(10 + 2.410142264²) = 2.509763724, and x₃ = ∛(10 + 2.509763724²) = 2.535437381, which rounds to 2.535.
- (d) x = −2, y = −5 — 3x² + 12x + 7 rewrites as 3(x² + 4x) + 7, then as 3[(x + 2)² − 4] + 7, which simplifies to 3(x + 2)² − 5, since −3 × 4 + 7 = −5. Substituting x = −2: 3 × (−2)² = 12, 12 × (−2) = −24, so 12 − 24 + 7 = −5, confirming the minimum value −5 at x = −2: turning point x = −2, y = −5. Halving b instead of halving b/a — using −4 as the shift instead of −2 — lands on turning point x = −4, y = −41, which is wrong because when a ≠ 1 the shift inside the bracket is b/(2a), not b/a alone. Reading the bracket's sign directly as the turning point's x-coordinate gives x = 2, y = −5 — wrong, because (x + 2)² is zero at x = −2, not x = 2. Computing 12 − 7 = 5 instead of 7 − 12 = −5 flips the sign of the constant, giving x = −2, y = 5 — wrong, since the completed square's constant must be evaluated as 7 minus 12, not 12 minus 7. Whenever a ≠ 1, factor a out of the x² and x terms first, and always check a turning point by substituting back into the original equation.
Build your own mix at the worksheet builder.