Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Solve 3x + 14 = 8x − 6
- 2.Solve 3(2x − 1) = 27
- 3.A mobile phone plan charges a fixed monthly fee plus an amount for each gigabyte of data used. The total cost £C for using g gigabytes in a month is given by C = 15 + 2g. What does the number 2 represent in this formula?
- 4.The first five terms of a quadratic sequence are 2, 5, 10, 17, 26. Work out the next term in the sequence.
- 5.A coach company charges a booking fee plus a price for each passenger. A booking for 1 passenger costs £9, for 2 passengers costs £15, for 3 passengers costs £21, and for 4 passengers costs £27. Work out an expression, in terms of n, for the cost in pounds of a booking for n passengers.
- 6.The first five terms of a quadratic sequence are 6, 11, 18, 27, 38. Work out an expression, in terms of n, for the nth term.
- 7.The first term of an arithmetic sequence is 5, and each term after that increases by 6. Work out the 8th term of the sequence.
- 8.a = 2 and b = 5. Work out the value of a²b.
- 9.The graph of y = f(x) has a root (an x-intercept) at x = 5. Work out the x-coordinate of the corresponding root on the graph of y = f(x + 2).
- 10.A plumber charges a £40 call-out fee plus £25 for each hour worked. The total charge, £C, for a job lasting h hours is given by C = 40 + 25h. Work out the charge for a job lasting 3 hours, and name what kind of statement C = 40 + 25h is.
- 11.f(x) = 2x² + 1 and g(x) = x − 1. Work out fg(x), giving your answer in expanded form.y = 2x² + 1
- 12.Points A(−1, 2) and B(5, 8) are the endpoints of a line segment. Work out the equation of the perpendicular bisector of AB.
- 13.A rectangle has length (2x + 5) cm and width (x − 2) cm. Work out an expression, in terms of x, for the perimeter of the rectangle. Give your answer in its simplest form.
- 14.A car's speed increases steadily while it accelerates. Its speed v m/s after t seconds is given by v = u + at, where u is the starting speed in m/s and a is the acceleration in m/s². A car starts at u = 4 m/s and accelerates at a = 2 m/s² until it reaches v = 20 m/s. Work out t, the time taken in seconds.
- 15.A car's speed, in m/s, during a journey is: 0 at t = 0 s, 8 at t = 4 s, and 8 (constant) from t = 4 s to t = 10 s, increasing at a constant rate between t = 0 and t = 4. Estimate the total distance the car travels, using the areas of a triangle and a rectangle.
Answer key
- (c) x = 4 — Method: with an unknown on both sides, subtract the smaller x term from both sides so that all the x is on one side, then collect the numbers on the other. Working: subtracting 3x from both sides gives 14 = 5x − 6; adding 6 to both sides gives 20 = 5x; dividing both sides by 5 gives x = 4. Checking: 3 × 4 + 14 = 26 and 8 × 4 − 6 = 26. Answer: x = 4. The distractors: x = 2.5 comes from taking 3x off the left-hand side only, leaving 14 = 8x − 6 and so 8x = 20; x = −1.6 comes from changing the sign of the 8x when it is moved across but leaving the sign of the 14 unchanged, giving 3x − 8x = −6 + 14 and so −5x = 8; x = 15 comes from reaching 5x = 20 correctly and then subtracting 5 instead of dividing by 5.
- (b) 5 — Method: expand the bracket first, then solve the resulting linear equation. Working: 3(2x − 1) = 6x − 3, so 6x − 3 = 27. Add 3 to both sides: 6x = 30. Divide by 6: x = 5. Answer: 5. 4 2/3 comes from multiplying only the 2x inside the bracket by 3 and forgetting to multiply the −1 as well, giving 6x − 1 = 27. 4 comes from a sign error when expanding, writing 6x + 3 instead of 6x − 3. 4.5 comes from dividing 27 by 3 to get 2x − 1 = 9, then forgetting to add 1 back before dividing by 2, using 2x = 9 instead of 2x = 10.
- (c) The cost, in pounds, for each extra gigabyte of data used — In C = 15 + 2g, the number multiplying g is the gradient, which gives the extra cost for each extra unit of g — here, £2 for each extra gigabyte. 'The fixed monthly fee, in pounds' describes the constant term 15, not the coefficient of g. 'The total number of gigabytes included in the plan' misreads the coefficient as a quantity of data rather than a cost per gigabyte. 'The cost … for each extra 2 gigabytes' doubles the unit the coefficient actually applies to — it is the cost for each single extra gigabyte.
- (c) 37 — The first differences are 3, 5, 7, 9 — they increase by 2 each time (the second difference), so the next first difference is 11, giving 26+11=37. A candidate who repeats the last first difference (9) instead of increasing it would reach 26+9=35. A candidate who increases the difference by 4 instead of 2 would reach 26+13=39. A candidate who adds only the second difference (2) to the last term, instead of the next first difference, would reach 26+2=28.
- (d) 6n + 3 — Method: find the price per passenger, then find the booking fee that fits a booking for 1 passenger. Working: the cost rises by £6 for each extra passenger (15 − 9 = 6, 21 − 15 = 6, 27 − 21 = 6), so the cost has the form 6n + c. Substituting n = 1: 6(1) + c = 9, so c = 3. Answer: the cost in pounds is 6n + 3. 6n ignores the booking fee altogether. 6n + 9 uses the cost of one passenger, £9, as the fee without first subtracting the £6 per-passenger price. 9n + 6 swaps the two numbers, using the first cost as the price per passenger and the difference as the fee.
- (b) n² + 2n + 3 — First differences: 5, 7, 9, 11. Second differences: 2, 2, 2, so a = 2 ÷ 2 = 1. Subtracting n² (1, 4, 9, 16, 25) from the terms (6, 11, 18, 27, 38) leaves 5, 7, 9, 11, 13, which is the linear expression 2n + 3. So the nth term is n² + 2n + 3. Using the second difference itself as a, without halving it, gives 2n² + 2n + 3. Finding a = 1 correctly but then dropping the linear part 2n, keeping only the constant, gives n² + 3. Finding a = 1 correctly but dropping the constant +3 gives n² + 2n.
- (d) 47 — To reach the 8th term from the 1st term, the difference of 6 is added 7 times (8 − 1 = 7): 5 + 7 × 6 = 47. A candidate who multiplies by the term number itself, rather than one less, would compute 5 + 8 × 6 = 53. A candidate who uses one step too few (6 instead of 7) would reach 5 + 6 × 6 = 41. A candidate who forgets to include the first term at all would compute just 8 × 6 = 48.
- (b) 20 — a²b means a² multiplied by b: a² = 2² = 4, and 4 × 5 = 20. Reading the expression as (ab)² instead of a²b gives (2 × 5)² = 100. Squaring b instead of a, 2 × 5² = 50, squares the wrong letter. Adding a² and b instead of multiplying them, 2² + 5 = 9, uses the wrong operation.
- (a) 3 — y = f(x + 2) is f(x) translated 2 units to the LEFT (inside the bracket, adding moves the graph in the negative x-direction). The root moves with the whole graph: 5 − 2 = 3. Moving right instead of left gives 7; assuming a bracket shift leaves the root unchanged gives 5; writing down the shift amount 2 itself skips the translation altogether.
- (b) £115, and C = 40 + 25h is a formula — Substitute h = 3 into the rule, multiplying before adding. The hours cost 25 × 3 = 75, and adding the call-out fee gives 40 + 75 = 115, so the charge is £115. The rule itself links two different quantities, C and h, and lets one be worked out from the other, so it is a formula; an expression would have no equals sign in it. Adding the fee before multiplying gives 65 × 3 = 195, which charges the call-out fee three times over, and stopping at 40 + 25 leaves £65, the charge for a single hour.
- (d) 2x² − 4x + 3 — fg(x) means f(g(x)): substitute g(x) into f in place of x. g(x) = x − 1, so fg(x) = f(x − 1) = 2(x − 1)² + 1. Expanding (x − 1)² = x² − 2x + 1, so fg(x) = 2(x² − 2x + 1) + 1 = 2x² − 4x + 2 + 1 = 2x² − 4x + 3. Writing 2x² comes from working out gf(x) instead — g(f(x)) = f(x) − 1 = (2x² + 1) − 1 = 2x², which applies the functions in the wrong order. Writing 2x² − 1 comes from expanding (x − 1)² as x² − 1, dropping the middle term, so f(x − 1) becomes 2(x² − 1) + 1 = 2x² − 2 + 1 = 2x² − 1. Writing 2x² − 4x + 2 comes from expanding correctly but forgetting the final + 1 from f, stopping at 2(x² − 2x + 1) = 2x² − 4x + 2.
- (d) x + y = 7 — The midpoint of AB is (−1 + 5)/2, (2 + 8)/2, which is (2, 5). The gradient of AB is (8 − 2)/(5 − (−1)) = 6/6 = 1. The perpendicular bisector has gradient −1 and passes through (2, 5): y − 5 = −(x − 2), which rearranges to x + y = 7. Distractor routes: x − y = −3 uses the gradient of AB itself, 1, rather than its negative reciprocal, giving a line PARALLEL to AB through the midpoint instead of perpendicular to it. x + y = 12 comes from adding the y-coordinates, 2 + 8 = 10, but forgetting to divide by 2, using the midpoint (2, 10) instead of (2, 5). x + y = 4 comes from using A's x-coordinate, −1, directly instead of averaging it with B's, giving the point (−1, 5) instead of the true midpoint (2, 5).
- (b) 6x + 6 — Perimeter = 2[(2x + 5) + (x − 2)] = 2(3x + 3) = 6x + 6. A candidate who adds the length and width but forgets to double for the perimeter gets 3x + 3. A candidate who makes a sign error and adds 2 instead of subtracting it before doubling gets 2[(2x + 5) + (x + 2)] = 6x + 14. A candidate who multiplies the length and width instead of adding them, confusing the perimeter formula with the area formula, and then doubles that product, gets 2(2x + 5)(x − 2) = 4x² + 2x − 20.
- (b) 8 s — Rearranging v = u + at for t: subtract u from both sides to get v − u = at, then divide by a: t = (v − u)/a. Substituting u = 4, a = 2, v = 20: t = (20 − 4)/2 = 16/2 = 8 s. Answering 12 s comes from adding u instead of subtracting it: (20 + 4)/2 = 12. Answering 32 s comes from multiplying (v − u) by a instead of dividing by it: 16 × 2 = 32. Answering 6 s divides v by a first and then subtracts u, in the wrong order: 20/2 − 4 = 10 − 4 = 6. The time taken is 8 s.
- (c) 64 m — The distance travelled is the area under the speed-time graph. From t = 0 to t = 4, the shape is a triangle with base 4 and height 8, area 1/2 × 4 × 8 = 16. From t = 4 to t = 10, the shape is a rectangle with base 6 and height 8, area 6 × 8 = 48. Total distance: 16 + 48 = 64 m. Treating the whole 10 seconds as a single trapezium with parallel sides 0 and 8 and width 10, instead of splitting it into the triangle and rectangle, gives 40 m. Ignoring the acceleration phase completely and assuming the car travels at a constant 8 m/s for all 10 seconds gives 8 × 10 = 80 m. Misreading the second interval as running from t = 4 to t = 8 instead of t = 4 to t = 10 gives a rectangle area of 4 × 8 = 32, plus the correct triangle of 16, totalling 48 m.
Build your own mix at the worksheet builder.