Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A rule turns each input into an output. An input of 0 gives an output of −1, an input of 1 gives an output of 1, and an input of 2 gives an output of 3. Work out the rule, writing the input as x and the output as y.
- 2.Solve the simultaneous equations 2x + y = 7 and x − y = 2.
- 3.The formula connecting distance (d), speed (s) and time (t) is d = st. Make s the subject of the formula.
- 4.Work out the coordinates of the point where the graph of y = 2x − 6 crosses the x-axis.y = 2x − 6
- 5.Factorise 3x² + 10x − 8.
- 6.Solve 4(x − 3) = 2x + 6.
- 7.A rectangular lawn is 4 m longer than it is wide. Its area is 96 m². Work out the length of the lawn.
- 8.The first five terms of a quadratic sequence are −1, 4, 13, 26, 43. Work out an expression, in terms of n, for the nth term.
- 9.Which of these is an identity?
- 10.The table shows the speed, in m/s, of a car at times, in seconds, all 2 seconds apart: 0 at t = 0, 3 at t = 2, 8 at t = 4, 15 at t = 6, 24 at t = 8. A student uses the trapezium rule with these five readings to estimate the distance the car travels. By finding the second differences of the speed values, decide whether this trapezium estimate is an overestimate or an underestimate of the true distance.
- 11.The simultaneous equations kx + 2y = 4 and 3x + y = 5 have no solution. Work out the value of k.
- 12.A tap fills a tank at a varying rate. A graph shows the rate of flow, in litres per minute, against time, in minutes. What does the area under this graph represent?
- 13.By completing the square, find the turning point of the curve y = x² − 10x + 30.y = x² − 10x + 30
- 14.A cinema sells adult tickets for £10 and child tickets for £6. A family group buys 9 tickets in total, spending £74. Work out how many adult tickets were bought.
- 15.A company charges for hiring chairs for a day. Hiring 1 chair costs £12, hiring 2 chairs costs £19, hiring 3 chairs costs £26, and hiring 4 chairs costs £33. Work out an expression, in terms of n, for the cost in pounds of hiring n chairs for a day.
Answer key
- (b) y = 2x − 1 — Method: in a rule that multiplies and then adds, the multiplier is the step in the outputs for each step of 1 in the input, and the number added on is the output when the input is 0. Working: the inputs 0, 1, 2 rise in ones while the outputs −1, 1, 3 rise by 2 each time, so the input is multiplied by 2; an input of 0 gives 2 × 0 = 0 and the output must be −1, so 1 is subtracted. Answer: y = 2x − 1, checked against the last pair by 2 × 2 − 1 = 3. The distractors: y = 2x + 1 comes from finding the multiplier 2 correctly and then reading the output at an input of 0 as +1 instead of −1; y = x − 1 comes from taking the multiplier as 1 because the inputs go up in ones, instead of using the step in the outputs; y = 3x − 1 comes from reading the largest output, 3, as the multiplier.
- (c) x = 3, y = 1 — Method: the y terms are +y and −y, so adding the two equations removes y and leaves an equation in x alone. Working: adding 2x + y = 7 and x − y = 2 gives 3x = 9, so x = 3; substituting x = 3 into x − y = 2 gives 3 − y = 2, so y = 1. Answer: x = 3, y = 1, which also satisfies 2 × 3 + 1 = 7. The distractors: x = 1, y = 3 comes from finding the two values correctly and then writing them against the wrong letters; x = 3, y = 2 comes from substituting x = 3 into 2x + y = 7 as 2 + 3 + y = 7, adding the coefficient instead of multiplying by it; x = 3, y = −1 comes from substituting into x − y = 2 as though it read x + y = 2.
- (b) s = d / t — Method: undo the multiplication by t by dividing both sides by t. Working: d = st, so dividing both sides by t gives s = d / t. The value s = dt comes from multiplying by t instead of dividing. The value s = t / d comes from inverting the fraction, dividing t by d instead of d by t. The value s = d − t comes from subtracting t instead of dividing by it.
- (d) (3, 0) — Method: every point on the x-axis has y-coordinate 0, so substituting y = 0 into the equation and solving gives the x-coordinate of the crossing point. Working: 0 = 2x − 6 gives 2x = 6, so x = 6 ÷ 2 = 3 and the graph crosses the x-axis at (3, 0). Answer: (3, 0). The distractors: (0, −6) is where the graph crosses the y-axis, found by substituting x = 0 rather than y = 0; (−3, 0) comes from moving the 6 across the equals sign without changing its sign, giving 2x = −6; (6, 0) comes from reading the constant straight off as the crossing point and never dividing by the gradient 2.
- (d) (3x − 2)(x + 4) — For 3x² + 10x − 8, find two numbers multiplying to 3 × (−8) = −24 and adding to 10: these are 12 and −2. Rewrite: 3x² + 12x − 2x − 8 = 3x(x + 4) − 2(x + 4) = (3x − 2)(x + 4). Choosing (3x + 2)(x − 4) expands to 3x² − 10x − 8 — the correct factor pair but the wrong signs, giving the middle term the wrong sign. Choosing (x − 2)(3x + 4) expands to 3x² − 2x − 8 — the 3 is attached to the wrong bracket, changing which terms combine for the x-coefficient. Choosing (3x − 4)(x + 2) expands to 3x² + 2x − 8 — this uses 4 and 2 instead of the correct pair 12 and 2, so the middle term does not come to 10x.
- (d) 9 — Method: expand the brackets fully first, then collect the x-terms and constants before dividing. Working: 4(x − 3) = 4x − 12, so 4x − 12 = 2x + 6; 4x − 2x = 6 + 12; 2x = 18; x = 9. Answer: x = 9. 4.5 comes from expanding only the x-term in the bracket and forgetting to multiply the 3, giving 4x − 3 = 2x + 6, then 2x = 9, x = 4.5. −3 comes from a sign error when expanding, giving 4x + 12 = 2x + 6, then 2x = −6, x = −3. 3 comes from a sign error collecting the x-terms, adding instead of subtracting: 4x + 2x = 6 + 12, so 6x = 18, x = 3.
- (d) 12 m — Method: give the width a letter, write the length in terms of it and use length × width = area to form a quadratic. Working: with a width of x metres the length is x + 4, so x(x + 4) = 96, which rearranges to x² + 4x − 96 = 0; factorising gives (x + 12)(x − 8) = 0, and a width must be positive, so x = 8 and the length is 8 + 4 = 12. Answer: 12 m, and 12 × 8 = 96 as the area requires. The distractors: 8 m is the width rather than the length asked for; 16 m comes from taking the other root as 12 and adding 4 to it, ignoring that the root −12 cannot be a width; 24 m comes from dividing the area by the 4 in the question instead of forming an equation.
- (d) 2n² − n − 2 — First differences: 5, 9, 13, 17. Second differences: 4, 4, 4, so a = 4 ÷ 2 = 2. Subtracting 2n² (2, 8, 18, 32, 50) from the terms (−1, 4, 13, 26, 43) leaves −3, −4, −5, −6, −7, which is the linear expression −n − 2. So the nth term is 2n² − n − 2. Using the second difference itself as a, without halving it, gives 4n² − n − 2. Finding a = 2 correctly but dropping the linear remainder −n − 2 entirely leaves 2n². Treating the first first difference (5) as a common difference and building a + (n − 1)d = −1 + 5(n − 1) gives 5n − 6, which only matches the first two terms.
- (a) 2(3x + 1) = 6x + 2 — Expanding 2(3x + 1) = 6x + 2 gives an expression that matches the right-hand side exactly for every value of x — it is an identity. 4x − 3 = 3x + 5 is an ordinary equation with one solution, x = 8. 7 − x = x − 7 is also an ordinary equation with one solution, x = 7. 5x + 1 = 5(x + 1) never holds for any value of x at all, since expanding the right-hand side gives 5x + 5, and 5x + 1 = 5x + 5 would require 1 = 5, which is impossible.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (b) k = 6 — Method: two simultaneous linear equations have no solution when the lines they describe are parallel, so write each equation in the form y = mx + c and make the gradients equal. Working: kx + 2y = 4 rearranges to y = −(k/2)x + 2, so its gradient is −k/2, and 3x + y = 5 rearranges to y = −3x + 5, so its gradient is −3; setting −k/2 = −3 gives k = 6, and the first equation is then 6x + 2y = 4, which simplifies to 3x + y = 2 and can never agree with 3x + y = 5. Answer: k = 6. The distractors: k = −6 comes from reading the gradient of kx + 2y = 4 as +k/2 and solving k/2 = −3; k = 3 comes from making the x terms identical instead of making the gradients equal; k = 2/3 comes from writing the gradient of 3x + y = 5 upside down as −1/3 and solving −k/2 = −1/3.
- (b) The total volume of water, in litres, that has flowed in. — On a rate-time graph, the y-axis is in litres per minute and the x-axis is in minutes; multiplying a rate by a time gives litres per minute × minutes = litres, a total volume. So the area under the graph represents the total volume of water that has flowed in. Thinking the area itself represents the rate, rather than what the rate accumulates to, gives the wrong claim about the average rate of flow. Confusing the area with the gradient of the graph — which measures how the rate is changing — gives the wrong claim about litres per minute squared. Ignoring the flow-rate axis and focusing only on the time axis gives the wrong claim that the area is simply the total time.
- (c) x = 5, y = 5 — x² − 10x + 30 = (x − 5)² − 5² + 30 = (x − 5)² + 5. Substituting x = 5: 5² = 25, 10 × 5 = 50, so 25 − 50 + 30 = 5, confirming the minimum value 5 at x = 5: turning point (5, 5). Using −10 instead of half of it inside the bracket gives (x − 10)² − 70, turning point (10, −70) — wrong, because only half the coefficient of x belongs inside the bracket. Reading the bracket's sign directly as the turning point's x-coordinate gives (−5, 5) — wrong, because (x − 5)² is zero at x = 5, not x = −5. Computing 25 − 30 = −5 instead of 30 − 25 = 5 flips the sign of the constant, giving (5, −5) — wrong, since the completed square's constant must be evaluated as 30 minus 25, not 25 minus 30. Always check a turning point by substituting its x-value back into the original equation.
- (c) 5 — Method: let a be the number of adult tickets, so the number of child tickets is 9 − a. Form the equation 10a + 6(9 − a) = 74. Working: expand the bracket: 10a + 54 − 6a = 74, so 4a = 20, giving a = 5. Answer: 5 adult tickets. 4 comes from correctly finding the number of child tickets but reporting it instead of the number of adult tickets asked for. 1.25 comes from a sign error expanding the bracket, writing 10a + 54 + 6a = 74 instead of subtracting, which gives 16a = 20. 7.4 comes from dividing the total takings by the adult ticket price only, ignoring the children entirely, 74 ÷ 10.
- (d) 7n + 5 — Method: find the rate charged per extra chair, then find the fixed part of the cost that fits hiring 1 chair. Working: the cost rises by £7 for each extra chair (19 − 12 = 7, 26 − 19 = 7, 33 − 26 = 7), so the cost has the form 7n + c. Substituting n = 1: 7(1) + c = 12, so c = 5. Answer: the cost in pounds is 7n + 5. The value 7n comes from ignoring the fixed part of the charge entirely. The value 7n + 12 comes from using the cost of 1 chair as the fixed part directly, without subtracting the per-chair rate first. The value 12n + 7 comes from swapping the roles of the cost of hiring 1 chair, £12, and the rate per extra chair, £7 — using the total for one chair as the coefficient of n and the rate as the fixed part.
Build your own mix at the worksheet builder.