Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Solve 7x − 5 = 3x + 11
- 2.An exponential model has equation y = A × bˣ, where b > 1. Its graph passes through the points (1, 135) and (2, 405). Work out the value of A.
- 3.A scout leader is 44 years old and one of the scouts is 16 years old. Work out how many years it will be until the leader is exactly twice as old as the scout.
- 4.p = 4. Work out the value of 2p³.
- 5.Which line of algebra shows that the sum of two consecutive odd numbers is always a multiple of 4?
- 6.The equation x² − 7 = 0 has a positive root. Let f(x) = x² − 7. Given that x₁ = 2.6 and x₂ = 2.65, work out which of these is correct.y = x² − 7
- 7.The formula y = x² + 1 gives y in terms of x. Work out the value of y when x = −2.y = x² + 1
- 8.The formula connecting distance (d), speed (s) and time (t) is d = st. Make s the subject of the formula.
- 9.A region R satisfies y ≤ x + 1, x + y ≤ 5 and y ≥ 0. Which of these correctly describes R in words?
- 10.Write down the coefficient of xy in the expression 4x²y − 7xy + 2.
- 11.The nth term of a sequence is n² + 2n − 4. Work out the 7th term.
- 12.A school trip costs a £15 deposit plus £9 per student for the coach. The total cost for a class is £186. Work out how many students went on the trip.
- 13.A straight line has equation 4y = 12x + 20. Work out the gradient of the line.y = 12x + 20
- 14.A caterer uses the formula C = 6p + 20 to work out the total cost, £C, of a buffet for p people, where £20 covers fixed costs. A customer is charged £92. Work out how many people, p, the buffet was for.
- 15.A point has coordinates (x, y), where x + y = 0 and x is not 0. In which two quadrants could this point lie?
Answer key
- (d) 4 — Method: collect the x terms on one side and the number terms on the other. Working: subtract 3x from both sides: 4x − 5 = 11. Add 5 to both sides: 4x = 16. Divide by 4: x = 4. Answer: 4. 0.6 comes from adding the x terms instead of subtracting when collecting them, 7x + 3x = 10x, and also subtracting the constants the wrong way round, 11 − 5 = 6, giving 10x = 6. 1.5 comes from correctly collecting the x terms as 4x but subtracting the constants the wrong way round, 11 − 5 instead of 11 + 5. −4 comes from moving the x terms to the wrong side, giving 3x − 7x instead of 7x − 3x, along with a matching sign error on the constants.
- (a) 45 — The ratio between the two given points, one power of x apart, gives b: 405 ÷ 135 = 3, so b = 3. Substituting back, at x = 1, y = A × b, so 135 = A × 3, giving A = 45. Giving the common ratio b itself instead of A confuses which unknown was asked for and produces 3 — wrong, because the question asks for A, not b. Giving 135 instead treats the first given point as the y-intercept and reads A off it directly — wrong, because that point is at x = 1, not x = 0, so 135 is A × b, not A. Assuming A equals b⁰ = 1 by itself, rather than substituting a known point to solve for A, gives 1 — wrong, because b⁰ is always 1 regardless of A; A must be found using an actual (x, y) pair from the graph.
- (b) 12 years — Method: call the number of years t, add t to both ages, and form an equation from the comparison at that future time. Working: in t years the leader will be 44 + t and the scout will be 16 + t, so 44 + t = 2(16 + t); expanding gives 44 + t = 32 + 2t, and subtracting t and 32 from both sides gives t = 12. Checking: in 12 years the leader will be 56 and the scout 28, and 56 = 2 × 28. Answer: 12 years. The distractors: 6 years comes from halving the leader's present age instead, so that the scout has to reach 22, which takes 6 years; 14 years comes from halving the 28-year gap between the two ages; 28 years comes from giving the age gap itself as the number of years.
- (d) 128 — In 2p³ the index belongs to p only, so cube p first and multiply by the coefficient afterwards. Cubing gives 4 × 4 × 4 = 64, and then 2 × 64 = 128. Cubing the coefficient as well would mean working out (2 × 4)³, which is 512. Reading the index as an instruction to multiply by 3 gives 2 × 4 × 3 = 24, and ignoring the coefficient altogether leaves 64.
- (a) (2n + 1) + (2n + 3) = 4n + 4 = 4(n + 1) — Two consecutive odd numbers can be written as 2n + 1 and 2n + 3, for a whole number n. Adding them: (2n + 1) + (2n + 3) = 4n + 4 = 4(n + 1), which is a multiple of 4 for every whole number n, proving the general result. Using 2n + 1 twice does not represent two different numbers, so it proves nothing about a sum of two numbers; writing n + (n + 2) drops the +1 that makes the numbers odd in the first place, and only shows a multiple of 2; and check every constant term is added correctly — 1 + 3 is 4, not 3.
- (d) x₂ closer: f(x₂) = 0.0225, nearer to 0 — f(2.6) = 2.6² − 7 = 6.76 − 7 = −0.24, and f(2.65) = 2.65² − 7 = 7.0225 − 7 = 0.0225. The closer a value of x is to the root, the closer f(x) is to zero — regardless of sign. Since |0.0225| = 0.0225 is much smaller than |−0.24| = 0.24, x₂ = 2.65 is closer to the root. 'x₁ closer: −0.24 is the smaller value' comes from comparing the SIGNED values of f(x) rather than their distances from zero — −0.24 is indeed less than 0.0225 as a number, but that does not mean x₁ is closer to the root. 'x₁ closer: f(x₁) negative ⇒ nearer root' invents a rule that a negative f(x) means x is closer to the root; the sign of f(x) only tells you which side of the root x is on, not how close it is. 'x₂ is the exact root, since f(x₂) ≈ 0' misreads f(x₂) = 0.0225 as zero; the true root is √7 ≈ 2.6458, so f(2.65) is close to zero but not equal to it, and x₂ is an approximation, not the exact root.
- (c) 5 — Method: substitute the value into the formula, work out the index first and the addition afterwards. Working: x² = (−2) × (−2) = 4, so y = 4 + 1 = 5. Answer: 5. The distractors: −3 comes from squaring only the 2 and keeping the minus sign outside the index, giving −4 + 1; 1 comes from adding the 1 to x before squaring, giving (−2 + 1)²; 4 comes from squaring correctly but stopping there and never adding the 1.
- (b) s = d / t — Method: undo the multiplication by t by dividing both sides by t. Working: d = st, so dividing both sides by t gives s = d / t. The value s = dt comes from multiplying by t instead of dividing. The value s = t / d comes from inverting the fraction, dividing t by d instead of d by t. The value s = d − t comes from subtracting t instead of dividing by it.
- (d) Below y = x + 1, below x + y = 5, above y = 0 — For y ≤ x + 1, R lies on or below the line y = x + 1. For x + y ≤ 5 (that is, y ≤ 5 − x), R lies on or below that line too. For y ≥ 0, R lies on or above the x-axis. Combining all three: R is below y = x + 1, below x + y = 5, and above y = 0. Distractor routes: "Above y = x + 1" flips the first inequality, describing the wrong side of that line. "Above x + y = 5" flips the second inequality, describing the wrong side of that line. "Below y = 0" flips the third inequality, describing the wrong side of the x-axis.
- (a) −7 — The coefficient of xy is the number multiplying that exact term, including its sign: in 4x²y − 7xy + 2, the term in xy is −7xy, so the coefficient is −7. Answering 7 correctly picks out the number but drops the minus sign that belongs to it. Answering 4 picks the coefficient of the x²y term instead of the xy term — x²y and xy are different terms because their powers of x differ. Answering −5 combines −7 with the constant term +2, as though the coefficient of xy included the number with no letter attached to it. The coefficient of xy is −7.
- (c) 59 — Substitute n = 7: 7² + 2 × 7 − 4 = 49 + 14 − 4 = 59. A sign error on the +2n term, treating it as −2n, gives 49 − 14 − 4 = 31. Working out 7² + 2 × 7 but forgetting to subtract the final 4 gives 49 + 14 = 63. Using n = 6 instead of n = 7 gives 36 + 12 − 4 = 44.
- (c) 19 — Method: set up the equation 15 + 9n = 186, then subtract the deposit and divide by the cost per student. Working: 9n = 186 − 15 = 171; n = 171 ÷ 9 = 19. Answer: 19 students. 20.67 comes from dividing the whole £186 by £9 without first subtracting the deposit: 186 ÷ 9 ≈ 20.67. 11.8 comes from swapping the two amounts round, subtracting £9 and dividing by £15: (186 − 9) ÷ 15 = 11.8. 22.33 comes from adding the deposit instead of subtracting it: (186 + 15) ÷ 9 ≈ 22.33.
- (b) 3 — Method: rearrange the equation into the form y = mx + c first, then read off the gradient. Working: dividing 4y = 12x + 20 by 4 gives y = 3x + 5, so the gradient is 3. The value 12 comes from reading the coefficient of x before dividing the equation by 4. The value 20 comes from using the constant term of the unsimplified equation instead of the gradient. The value 5 comes from finding the y-intercept, 20 / 4 = 5, and giving that instead of the gradient.
- (b) 12 — Method: substitute the total cost into the formula, then subtract the fixed cost and divide by the cost per person. Working: 92 = 6p + 20, so 6p = 92 − 20 = 72, p = 72 ÷ 6 = 12. Answer: 12 people. 15.33 comes from dividing the whole £92 by £6 without first subtracting the £20 fixed cost: 92 ÷ 6 ≈ 15.33. 4.3 comes from swapping the two amounts round, subtracting £6 and dividing by £20: (92 − 6) ÷ 20 = 4.3. 18.67 comes from adding the fixed cost instead of subtracting it: (92 + 20) ÷ 6 ≈ 18.67.
- (c) Second and fourth — If x + y = 0 then y = −x, so x and y always have opposite signs, one positive and one negative. A point with a negative x and a positive y lies in the second quadrant, and a point with a positive x and a negative y lies in the fourth quadrant, so the point lies in the second or the fourth. A candidate who reads x + y = 0 as meaning x and y have the same sign picks First and third, which is where x × y is positive, not where x + y = 0. A candidate who decides that y must be the positive coordinate picks the two quadrants above the x-axis, First and second. A candidate who decides that y must be the negative coordinate picks the two quadrants below the x-axis, Third and fourth.
Build your own mix at the worksheet builder.