Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Work out the coordinates of the point where the graph of y = 2x − 6 crosses the x-axis.y = 2x − 6
- 2.The iterative formula xₙ₊₁ = 12 ÷ (xₙ + 2) is used repeatedly, starting from x₀ = 1. Work out the value that xₙ approaches, correct to 2 decimal places.
- 3.Solve the inequality x² + 6x + 9 > 0.
- 4.A sequence is defined by aₙ = aₙ₋₁ + aₙ₋₂ for n ≥ 3. Given that a₃ = 11 and a₅ = 29, work out a₁.
- 5.A car's journey is represented by a velocity-time graph. The total distance travelled, found from the area under the graph, is 350 metres, and the total time for the journey is 25 seconds. Work out the car's average speed for the whole journey, in m/s.
- 6.A mobile phone plan charges a fixed monthly fee plus an amount for each gigabyte of data used. The total cost £C for using g gigabytes in a month is given by C = 15 + 2g. What does the number 2 represent in this formula?
- 7.The nth term of a sequence is n² + 3. Work out the first term of the sequence that is greater than 50.
- 8.A car passes the 15 km marker on a road and passes the 195 km marker 3 hours later. Work out the gradient of the distance-time graph, that is the rate of change of distance with time.
- 9.A student uses the iterative formula xₙ₊₁ = √(7xₙ + 3) to find an approximate solution of an equation. Work out which equation this iterative formula solves.
- 10.For the graph of y = 1/x, where x cannot be zero, which of these statements is correct?
- 11.Simplify (2x² + 7x + 3) ÷ (x² − 9), giving your answer as a single fraction.
- 12.Two numbers have a sum of 45. The larger number is 9 more than the smaller number. Form an equation using n for the smaller number, and solve it to find the larger number.
- 13.The area under a speed-time graph between t = 0 and t = 6 seconds is estimated using three strips of equal width, using the speeds, in m/s, at t = 0, 2, 4 and 6: 0, 5, 9 and 12. Using the trapezium rule with these three trapezia, estimate the distance travelled.
- 14.A plumber charges a call-out fee of £30 plus £25 per hour worked. Work out the total charge for a job that takes 3 hours.
- 15.The graph of y = x³ − 5x is reflected in the y-axis. Work out the equation of the image.y = x
Answer key
- (d) (3, 0) — Method: every point on the x-axis has y-coordinate 0, so substituting y = 0 into the equation and solving gives the x-coordinate of the crossing point. Working: 0 = 2x − 6 gives 2x = 6, so x = 6 ÷ 2 = 3 and the graph crosses the x-axis at (3, 0). Answer: (3, 0). The distractors: (0, −6) is where the graph crosses the y-axis, found by substituting x = 0 rather than y = 0; (−3, 0) comes from moving the 6 across the equals sign without changing its sign, giving 2x = −6; (6, 0) comes from reading the constant straight off as the crossing point and never dividing by the gradient 2.
- (c) 2.61 — The limit L satisfies L = 12 ÷ (L + 2), so L(L + 2) = 12, giving L² + 2L − 12 = 0 and L = (−2 + √52) ÷ 2 = 2.6056, which is 2.61 to 2 decimal places (the early iterates 4, 2, 3, 2.4, 2.73, ... oscillate around this value before settling). Choosing 3.00 reads off x₃, one of the early oscillating values, before the sequence has settled close to the limit. Choosing 4.00 reads off x₁, the very first iterate, not the value the sequence approaches. Choosing 6.00 comes from writing the limit equation as L = 12 ÷ 2, leaving L itself out of the denominator.
- (c) every value of x except x = −3 — Method: factorise the quadratic, then use the fact that a squared bracket is never negative to decide where the expression is strictly greater than zero. Working: x² + 6x + 9 factorises as (x + 3)², and a square is greater than or equal to 0 for every value of x; (x + 3)² is equal to 0 only when x + 3 = 0, that is when x = −3, so it is strictly greater than 0 at every other value. Answer: every value of x except x = −3. The distractors: 'every value of x, with no exceptions' comes from remembering that a square cannot be negative but forgetting that it can be zero, which a strict > rules out; 'x > −3 only' comes from taking the square root of both sides to get x + 3 > 0 and keeping only that branch; 'x < −3 only' comes from the same square-rooting followed by turning the sign round, as though the step had been a division by a negative number.
- (a) 4 — a₅ = a₄ + a₃, so a₄ = a₅ − a₃ = 29 − 11 = 18. a₄ = a₃ + a₂, so a₂ = a₄ − a₃ = 18 − 11 = 7. a₃ = a₂ + a₁, so a₁ = a₃ − a₂ = 11 − 7 = 4. Checking forwards: 4, 7, 11, 18, 29. Answering 7 stops one step early, reporting a₂ = 7 instead of continuing back one more step to a₁ — wrong, because the question asks for a₁, not a₂. Answering 18 reports a₄ = 18, an intermediate value found along the way, instead of a₁ — wrong, because a₄ is a term used to reach the answer, not the term the question asks for. Answering 3 takes one backward step too many, working out a further term a₀ = a₂ − a₁ = 7 − 4 = 3 — wrong, because the sequence starts at a₁, so a₁ = 4 is as far back as the question goes.
- (b) 14 m/s — Average speed for a whole journey is total distance divided by total time: 350 ÷ 25 = 14 m/s. Multiplying the distance and time instead of dividing gives 350 × 25 = 8750 m/s. Adding the distance and time instead of dividing gives 350 + 25 = 375 m/s. Inverting the division, working out time divided by distance, gives 25 ÷ 350, which rounds to 0.07 m/s.
- (c) The cost, in pounds, for each extra gigabyte of data used — In C = 15 + 2g, the number multiplying g is the gradient, which gives the extra cost for each extra unit of g — here, £2 for each extra gigabyte. 'The fixed monthly fee, in pounds' describes the constant term 15, not the coefficient of g. 'The total number of gigabytes included in the plan' misreads the coefficient as a quantity of data rather than a cost per gigabyte. 'The cost … for each extra 2 gigabytes' doubles the unit the coefficient actually applies to — it is the cost for each single extra gigabyte.
- (a) 52 — Test successive terms: n=6 gives 6²+3=39, which is not greater than 50. n=7 gives 7²+3=52, which is greater than 50, so the first term greater than 50 is 52. A candidate who stops at n=6, before checking whether 39 actually exceeds 50, would give 39. A candidate who solves n²>50 instead of n²+3>50, ignoring the +3 in the search, would find n=8 is the first value with n²>50 (since 7²=49) and compute 8²+3=67. A candidate who computes n² by doubling n instead of squaring it would compute 2×7+3=17.
- (b) 60 km/h — Method: the gradient of a distance-time graph is the change in distance divided by the change in time, and for a journey at a steady rate that gradient is the speed. Working: the change in distance is 195 − 15 = 180 km and the change in time is 3 hours, so the gradient is 180 ÷ 3 = 60 km/h. Answer: 60 km/h. The distractors: 180 km/h comes from stopping at the change in distance and never dividing by the 3 hours; 195 km/h comes from reading the final marker as the rate instead of working with the change between the two markers; 3 km/h comes from quoting the time taken, which belongs on the bottom of the fraction, as though it were the value of the fraction itself.
- (d) x² − 7x − 3 = 0 — Method: an iteration settles where the next value equals the one before it, so both can be written as the same letter x; replace every xₙ by x, square both sides to clear the square root, and collect all the terms on one side. Working: x = √(7x + 3) gives x² = 7x + 3 on squaring both sides; subtracting 7x and 3 from both sides gives x² − 7x − 3 = 0. Answer: x² − 7x − 3 = 0. The distractors: x² + 7x − 3 = 0 moves the 7x across the equals sign without changing its sign; x² − 7x + 3 = 0 makes that same slip on the constant instead, leaving the 3 positive as it crosses; x² − 7x − 9 = 0 squares the expression term by term, squaring the 3 to give 9 as though squaring √(7x + 3) gave 7x + 9, which is the (a + b)² = a² + b² mistake dressed as a square root.
- (d) The graph never crosses either axis — Since x ≠ 0, there is no point on the graph where x = 0, so it cannot cross the y-axis; likewise 1/x is never equal to 0 for any x, so it cannot cross the x-axis either — the graph never touches either axis. A candidate who forgets the restriction x ≠ 0 might think the graph behaves like other graphs and passes through the origin, (0, 0). A candidate who correctly rules out the x-axis but forgets that x = 0 is also excluded might say the graph crosses the y-axis but never the x-axis. A candidate who only pictures the branch where x and y are both positive might say the graph has only one branch, in quadrant 1, forgetting the second branch where x and y are both negative.
- (b) (2x + 1)/(x − 3) — Factorise both the numerator and the denominator before you cancel anything. The numerator 2x² + 7x + 3 factorises to (2x + 1)(x + 3), and the denominator x² − 9 is a difference of two squares, factorising to (x − 3)(x + 3). The (x + 3) factor is common to both, so it cancels, leaving (2x + 1)/(x − 3). Writing (2x + 1)/(x + 3) comes from factorising x² − 9 as (x + 3)² instead of (x − 3)(x + 3) — a difference of two squares always has one plus and one minus bracket. Writing (2x + 3)/(x − 3) comes from mis-factorising the numerator as (2x + 3)(x + 1) and then wrongly cancelling the (x + 1) against the denominator's (x + 3) as though they were the same bracket. Writing 2x + 1 comes from cancelling the (x + 3) factor correctly but then dropping the remaining (x − 3) on the denominator altogether.
- (a) 27 — Method: let the smaller number be n, so the larger number is n + 9. Form the equation n + (n + 9) = 45. Working: simplify: 2n + 9 = 45, so 2n = 36, giving n = 18. The larger number is 18 + 9 = 27. Answer: 27. 18 is the smaller number, found correctly, but given as the answer to the question asking for the larger number. 22.5 comes from ignoring the "9 more" part and simply halving the total, 45 ÷ 2. 36 comes from a sign error when isolating the constant, treating the equation as 2n = 45 + 9 instead of 2n = 45 − 9.
- (d) 40 m — Each trapezium has width 2. Its area is width × the average of its two heights. Strip 1: average of 0 and 5 is 2.5, so area = 2 × 2.5 = 5. Strip 2: average of 5 and 9 is 7, so area = 2 × 7 = 14. Strip 3: average of 9 and 12 is 10.5, so area = 2 × 10.5 = 21. Total distance = 5 + 14 + 21 = 40 m. Leaving out the division by 2 in the averaging step doubles every strip, giving 80 m instead of 40 m. Using only the LEFT height of each strip as a rectangle, 0 × 2 + 5 × 2 + 9 × 2 = 28, or only the RIGHT height, 5 × 2 + 9 × 2 + 12 × 2 = 52, both ignore that the graph curves between the two ends of each strip — always average the two heights of a trapezium, never use just one of them.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (a) y = −x³ + 5x — Reflecting a graph in the y-axis replaces every x in the equation with −x: y = (−x)³ − 5(−x) = −x³ + 5x. Writing y = −x³ − 5x comes from substituting −x into the x³ term only and leaving the −5x term as it was. Writing y = x³ + 5x comes from substituting −x into the −5x term only and leaving the x³ term as it was. Writing y = x³ − 5x is the original equation with no reflection applied at all — every term needs the substitution, not just one of them.
Build your own mix at the worksheet builder.