Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (d) £20 — Let f be the joining fee and m the monthly fee: f + 3m = 100 and f + 6m = 160. Subtracting the first equation from the second eliminates f: 3m = 60, so m = 20. A candidate who finds the joining fee instead of the monthly fee would get f = 100 − 3(20) = £40. A candidate who divides Ben's total by his number of months, ignoring that part of the cost is a fixed joining fee, would get 160 ÷ 6 ≈ £26.67. A candidate who divides the difference in cost by the total number of months instead of the difference in months would get (160 − 100) ÷ 9 ≈ £6.67.
- (c) 10 m/s — A symmetric chord gradient uses the two points either side of t = 3: (2, 40) and (4, 60). The gradient is the change in height divided by the change in time: (60 − 40) ÷ (4 − 2) = 20 ÷ 2 = 10 m/s. Using only the values either side of one gap, (2, 40) and (3, 54), instead of the full symmetric chord, gives (54 − 40) ÷ (3 − 2) = 14 m/s. Getting the correct number but dropping the time unit, leaving only metres, gives 10 m. Dividing time by height instead of height by time inverts the calculation to (4 − 2) ÷ (60 − 40) = 0.1 s/m.
- (d) An equation, true for one value of x — 2x + 5 = 17 is only true when x = 6, so it is an equation. A candidate who ignores the equals sign and focuses only on the x terms and numbers present picks the expression option. A candidate who sees an equals sign and assumes it must relate two different quantities, as a formula does, picks that option, missing that there is only one quantity, x, involved here. A candidate who wrongly checks whether both sides look similar in structure rather than testing specific values picks the identity option, missing that the two sides are not equal for every value of x.
- (c) 64 m — The distance travelled is the area under the speed-time graph. From t = 0 to t = 4, the shape is a triangle with base 4 and height 8, area 1/2 × 4 × 8 = 16. From t = 4 to t = 10, the shape is a rectangle with base 6 and height 8, area 6 × 8 = 48. Total distance: 16 + 48 = 64 m. Treating the whole 10 seconds as a single trapezium with parallel sides 0 and 8 and width 10, instead of splitting it into the triangle and rectangle, gives 40 m. Ignoring the acceleration phase completely and assuming the car travels at a constant 8 m/s for all 10 seconds gives 8 × 10 = 80 m. Misreading the second interval as running from t = 4 to t = 8 instead of t = 4 to t = 10 gives a rectangle area of 4 × 8 = 32, plus the correct triangle of 16, totalling 48 m.
- (c) 3.153 — x₁ = √(4 × 1 + 1) = √5 = 2.236067977. x₂ = √(4 × 2.236067977 + 1) = √9.944271908 = 3.153453965, which rounds to 3.153. Reporting x₁ instead of x₂ gives 2.236067977, which rounds to 2.236. A sign error inside the root, using xₙ₊₁ = √(4xₙ − 1) instead of √(4xₙ + 1), gives x₁ = √3 = 1.732050808 and x₂ = √(4 × 1.732050808 − 1) = √5.928203232 = 2.434790182, which rounds to 2.435. Applying the formula in the wrong order, working out √(4xₙ) + 1 at every step instead of √(4xₙ + 1), gives x₁ = √4 + 1 = 3 and x₂ = √(4 × 3) + 1 = 4.464101615, which rounds to 4.464.
- (a) 2.154 — Continuing xₙ₊₁ = ∛(3xₙ + 4) from x₁ = 2.154 gives x₂ = 2.187, x₃ = 2.195, settling towards the root near 2.196 — this is the formula that converges. Continuing xₙ₊₁ = (xₙ³ − 4) ÷ 3 from x₁ = 1.333 gives x₂ = −0.543 and then x₃ = −1.387, moving further from the root each time. Continuing xₙ₊₁ = 4 ÷ (xₙ² − 3) from x₁ = 4 gives x₂ = 0.308 and then x₃ = −1.377, swinging wildly rather than settling. Continuing xₙ₊₁ = xₙ³ − 2xₙ − 4 from x₁ = 0 gives x₂ = −4 and then x₃ = −60, running away from the root entirely.
- (c) 72 m — The first section is a triangle with base 4 s and height 8 m/s, area = 1/2 × 4 × 8 = 16 m. The middle section is a rectangle with base 6 s and height 8 m/s, area = 6 × 8 = 48 m. The final section is a triangle with base 2 s and height 8 m/s, area = 1/2 × 2 × 8 = 8 m. Total distance = 16 + 48 + 8 = 72 m. Treating both sloping sections as full rectangles instead of triangles — forgetting the factor of a half — gives 4 × 8 + 6 × 8 + 2 × 8 = 96 m, which is wrong because a sloping speed-time section is a triangle, not a rectangle. Leaving out the final, decreasing section entirely gives 16 + 48 = 64 m, which is wrong because the cyclist is still moving and covering distance while slowing down. Leaving out the middle, constant-speed section gives 16 + 8 = 24 m, which is wrong because the cyclist covers the most distance of all during the 6 seconds of constant speed.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (d) 8 — Working backwards by halving (undoing the doubling), one 4-hour step at a time: 9,600 (20 h) → 4,800 (16 h) → 2,400 (12 h) → 1,200 (8 h) → 600 (4 h) → 300 (0 h). Reading these in time order — 300, 600, 1,200, 2,400, 4,800, 9,600 at 0, 4, 8, 12, 16, 20 hours — the population is still at or below 1,000 at 4 hours (600) and first goes above 1,000 at 8 hours (1,200). So the recorded population first exceeds 1,000 at 8 hours. Answering 20 just reads off the time stated in the question, without working out when the threshold was actually first crossed — wrong, because 9,600 is only the value AT 20 hours, not necessarily the first time the population passed 1,000. Answering 0 comes from recovering the starting population by dividing 9,600 by 5 (the number of 4-hour gaps up to 20 hours) instead of by 2⁵ = 32 (the correct number of halvings), giving a wrongly-inflated starting value of 9,600 ÷ 5 = 1,920 — already above 1,000 at 0 hours — wrong, because doubling means the value must be halved five times, dividing by 2 five times (2⁵ = 32), not divided once by the number of gaps. Answering 12 comes from halving back only twice, from 9,600 to 4,800 (16 h) to 2,400 (12 h), and stopping there because 2,400 is already above 1,000, without checking that 1,200 at 8 hours is also above 1,000 and occurs earlier — wrong, because the FIRST recorded time above 1,000 is the earliest such time, not the first one reached while working backwards from 20 hours.
- (c) £8,000 — The multiplier for one year is 1 − 0.18 = 0.82, so 0.82 × 0.82 = 0.6724. Original value = 5,379.20 ÷ 0.6724 = £8,000. Treating the total drop as simple depreciation (18% × 2 = 36% lost in total, so dividing by 0.64 instead of 0.6724) gives 5,379.20 ÷ 0.64 = £8,405 (nearest pound) — wrong, because the depreciation compounds year by year rather than adding up. Dividing by 0.82 only once, forgetting the second year entirely, gives 5,379.20 ÷ 0.82 = £6,560 — wrong, because two years of depreciation have passed, not one. Multiplying by 0.6724 instead of dividing by it — repeating the depreciation forward instead of reversing it — gives 5,379.20 × 0.6724 = £3,617 (nearest pound) — wrong, because to find the ORIGINAL value you must undo the depreciation, not apply it again.
- (c) 26.6 — h² = 1.6² = 2.56, so B = 68 ÷ 2.56 = 26.5625, which rounds to 26.6 (1 d.p.). A candidate who forgets to square the height gets 68 ÷ 1.6 = 42.5. A candidate who squares the mass instead of the height gets 68² ÷ 1.6 = 2890.0. A candidate who truncates 26.5625 instead of rounding it gets 26.5.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (a) 1.861 — x₁ = ∛(10 − 2²) = ∛6 = 1.817120593. x₂ = ∛(10 − 1.817120593²) = ∛6.698072751 = 1.885022855. x₃ = ∛(10 − 1.885022855²) = ∛6.446688837 = 1.861139399, which rounds to 1.861. Reporting x₂ instead of x₃ gives 1.885022855, which rounds to 1.885. Stopping after the first iteration and reporting x₁ instead of x₃ gives 1.817120593, which rounds to 1.817. A sign error inside the cube root, using xₙ₊₁ = ∛(10 + xₙ²) instead of ∛(10 − xₙ²), gives x₁ = ∛14 = 2.410142264, x₂ = ∛(10 + 2.410142264²) = 2.509763724, and x₃ = ∛(10 + 2.509763724²) = 2.535437381, which rounds to 2.535.
Build your own mix at the worksheet builder.