Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) (2, 4) and (−2, −4) — Substitute y = 2x into x² + y² = 20: x² + (2x)² = 20, which gives x² + 4x² = 20, so 5x² = 20, x² = 4, and x = 2 or x = −2. Using y = 2x for each x-value: x = 2 gives y = 4; x = −2 gives y = −4. The path meets the pond's edge at (2, 4) and (−2, −4). Distractor routes: (2, −4) and (−2, 4) swaps the sign pairing, matching each x-value with the wrong sign of y instead of keeping each x with its own correctly-signed y. (2, 1) and (−2, −1) comes from using y = x/2 instead of y = 2x when finding the y-coordinates. (2, 4) alone stops after the positive square root of x² = 4 and never finds the second point from x = −2.
- (d) x² − 7x − 3 = 0 — Method: an iteration settles where the next value equals the one before it, so both can be written as the same letter x; replace every xₙ by x, square both sides to clear the square root, and collect all the terms on one side. Working: x = √(7x + 3) gives x² = 7x + 3 on squaring both sides; subtracting 7x and 3 from both sides gives x² − 7x − 3 = 0. Answer: x² − 7x − 3 = 0. The distractors: x² + 7x − 3 = 0 moves the 7x across the equals sign without changing its sign; x² − 7x + 3 = 0 makes that same slip on the constant instead, leaving the 3 positive as it crosses; x² − 7x − 9 = 0 squares the expression term by term, squaring the 3 to give 9 as though squaring √(7x + 3) gave 7x + 9, which is the (a + b)² = a² + b² mistake dressed as a square root.
- (c) 4.30 — Method: substitute the starting value into the right-hand side to get x₁, then feed each value back in, keeping the whole display and respecting the order of operations, which divides before it subtracts. Working: x₁ = 5 − 3 ÷ 2.5 = 5 − 1.2 = 3.8; x₂ = 5 − 3 ÷ 3.8 = 5 − 0.78947… = 4.21052…; x₃ = 5 − 3 ÷ 4.21052… = 5 − 0.7125 = 4.2875; x₄ = 5 − 3 ÷ 4.2875 = 5 − 0.69970… = 4.30029…, which is 4.30 correct to 3 significant figures. Answer: 4.30. The distractors: 4.29 is x₃ = 4.2875 rounded, reached by counting the starting value itself as the first iterate and so stopping one use of the formula early; 3.80 is x₁, the value after a single use of the formula; 2.50 comes from working out (5 − 3) ÷ xₙ instead of 5 − (3 ÷ xₙ), subtracting before dividing, which produces the sequence 0.8, 2.5, 0.8, 2.5 and lands on 2.5 at the fourth step.
- (d) 400 m — The distance travelled equals the area under the speed-time graph. The first 10 seconds form a triangle with base 10 and height 20, giving an area of 0.5 × 10 × 20 = 100 m. The next 15 seconds form a rectangle with base 15 and height 20, giving an area of 15 × 20 = 300 m. The total distance is 100 + 300 = 400 m. The option 500 m treats the whole 25 seconds as travelled at the constant 20 m/s, ignoring that the speed was building up during the first 10 seconds: 25 × 20 = 500. The option 300 m only counts the constant-speed section and forgets the triangle section entirely. The option 200 m comes from working out the triangle's area without halving it (10 × 20 = 200) and forgetting the rectangle altogether.
- (d) x = −4, y = −19 — x² + 8x − 3 = (x + 4)² − 4² − 3 = (x + 4)² − 19. Substituting x = −4: (−4)² = 16, 8 × (−4) = −32, so 16 − 32 − 3 = −19, confirming the minimum value −19 at x = −4: turning point (−4, −19). Using 8 instead of half of it inside the bracket gives (x + 8)² − 67, turning point (−8, −67) — wrong, because only half the coefficient of x belongs inside the bracket. Reading the bracket's sign directly as the turning point's x-coordinate gives (4, −19) — wrong, because (x + 4)² is zero at x = −4, not x = 4. Computing 16 + 3 = 19 instead of −3 − 16 = −19 flips the sign of the constant, giving (−4, 19) — wrong, since the completed square's constant must be evaluated as −3 minus 16, not 16 plus 3. Check by substitution whenever the sign of a constant feels uncertain.
- (c) (3, 9) — Reflecting in the horizontal line y = 2 keeps the x-coordinate the same and maps y to 2 × 2 − y = 4 − (−5) = 9, so S = (3, 9). A candidate who uses k − y instead of 2k − y gets 2 − (−5) = 7, giving (3, 7). A candidate who reflects in the x-axis instead of the line y = 2, simply changing the sign of y, gets (3, 5). A candidate who also changes the sign of the x-coordinate, as if reflecting in both axes, gets (−3, 9).
- (a) They always charge the same, since 3(2n + 4) = 6n + 12. — Expand Advert A's formula by multiplying both terms inside the bracket by 3: 3 × 2n = 6n, and 3 × 4 = 12, giving 3(2n + 4) = 6n + 12, which is identical to Advert B's formula — so the two adverts always charge the same amount, whatever n is. Getting 6n + 4 comes from multiplying the 2n by 3 but leaving the 4 unmultiplied. Getting 2n + 7 comes from adding 3 to the bracket instead of multiplying by it. Saying it depends on n avoids expanding the bracket at all — once expanded, both formulas are identical for every value of n, so the cost can be compared directly.
- (b) 6x + 6 — Perimeter = 2[(2x + 5) + (x − 2)] = 2(3x + 3) = 6x + 6. A candidate who adds the length and width but forgets to double for the perimeter gets 3x + 3. A candidate who makes a sign error and adds 2 instead of subtracting it before doubling gets 2[(2x + 5) + (x + 2)] = 6x + 14. A candidate who multiplies the length and width instead of adding them, confusing the perimeter formula with the area formula, and then doubles that product, gets 2(2x + 5)(x − 2) = 4x² + 2x − 20.
- (b) The total volume of water, in litres, that has flowed in. — On a rate-time graph, the y-axis is in litres per minute and the x-axis is in minutes; multiplying a rate by a time gives litres per minute × minutes = litres, a total volume. So the area under the graph represents the total volume of water that has flowed in. Thinking the area itself represents the rate, rather than what the rate accumulates to, gives the wrong claim about the average rate of flow. Confusing the area with the gradient of the graph — which measures how the rate is changing — gives the wrong claim about litres per minute squared. Ignoring the flow-rate axis and focusing only on the time axis gives the wrong claim that the area is simply the total time.
- (c) 81 m — Split the velocity-time graph into its three phases. The accelerating phase (0 to 4 s) is a triangle: 1/2 × 4 × 6 = 12. The constant phase (4 s at 6 m/s, for 10 s) is a rectangle: 10 × 6 = 60. The decelerating phase (3 s) is a triangle: 1/2 × 3 × 6 = 9. Total distance: 12 + 60 + 9 = 81 m. Forgetting the final decelerating phase entirely and adding only the first two areas gives 12 + 60 = 72 m. Treating all three phases as rectangles, forgetting to halve either triangular phase, gives 4 × 6 + 10 × 6 + 3 × 6 = 102 m. Halving only the deceleration triangle correctly but treating the acceleration phase as a rectangle too gives 4 × 6 + 60 + 9 = 93 m.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (d) 6.0 — Subtract 1.8 from both sides: 6.3x ≤ 38.2. Divide both sides by 6.3: x ≤ 6.0634… . The question asks for the greatest value to 1 decimal place that still satisfies the inequality. Testing 6.1: 6.3 × 6.1 + 1.8 = 40.23, which is more than 40, so 6.1 fails. Testing 6.0: 6.3 × 6.0 + 1.8 = 39.6, which is no more than 40, so 6.0 works and is the greatest such value. A candidate who simply rounds 6.0634… to 1 decimal place answers 6.1, without checking that it satisfies the inequality. A candidate who adds 1.8 instead of subtracting works out 41.8 ÷ 6.3 and answers 6.6. A candidate who forgets the 1.8 altogether divides 40 by 6.3 and answers 6.3.
- (c) P — Sequence P has a common ratio of 2 (4 × 2 = 8, 8 × 2 = 16, 16 × 2 = 32), so it is geometric. Sequence Q has a common difference of 4, which is arithmetic, not geometric — a candidate who confuses a constant difference with a constant ratio picks Q. Sequence R has increasing differences of 3, 5, 7, a quadratic sequence, not geometric — a candidate who assumes any fast-growing sequence must be geometric picks R. Sequence S is the square numbers from 2² onwards (2², 3², 4², 5²), which is also quadratic, not geometric — a candidate who thinks squaring always means geometric growth picks S.
- (b) 3.38 — r₁ = √(300 ÷ (π × 8)) = √11.9366 = 3.4550. r₂ = √(300 ÷ (π × 8.4550)) = √11.2947 = 3.3608. r₃ = √(300 ÷ (π × 8.3608)) = √11.4232 = 3.3798, which rounds to 3.38. Choosing 3.36 stops at r₂, one iteration too early. Choosing 4.82 leaves out the '+ 5' inside the bracket, dividing by π × rₙ instead of π × (rₙ + 5). Choosing 3.45 comes from using π ≈ 3 instead of the calculator's π key throughout.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
Build your own mix at the worksheet builder.