Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
- (b) 118 m — Width = 840 ÷ 35 = 24 m. Perimeter = 2 × (length + width) = 2 × (35 + 24) = 2 × 59 = 118 m. The option 59 m gives the sum of the length and width but forgets to double it for the perimeter. The option 70 m doubles only the length (2 × 35 = 70) and leaves out the width entirely. The option 48 m doubles only the width (2 × 24 = 48) and leaves out the length entirely.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (b) y decreases towards zero but never reaches it — Method: as x gets larger, dividing 20 by a bigger number gives a smaller result, so y decreases; because 20/x can never be exactly zero for any positive x, the curve gets closer to zero without ever reaching it, so y decreases towards zero but never reaches it. Distractor origins: 'y increases towards a limit but never reaches it' has the relationship backwards, treating y as increasing when it is actually decreasing; 'y decreases at a steady rate and reaches zero' wrongly assumes the graph behaves like a straight line that eventually hits zero; 'y stays the same however large x becomes' wrongly assumes there is no change in y at all.
- (b) 6 — 3n + 4.5 = 22.5, so 3n = 18 and n = 6. A candidate who divides 22.5 by 3 first and ignores the 4.5 gets n = 7.5. A candidate who makes a sign error and forms the equation 3n − 4.5 = 22.5 gets 3n = 27 and n = 9. A candidate who divides by 3 before subtracting the 4.5, working out 22.5 ÷ 3 + 4.5, gets n = 12.
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (b) 12.7 m/s — Find the total distance from the area under the graph, then divide by the total time. Break the graph into its four straight sections: a triangle from (0, 0) to (5, 20), where 5 × 20 = 100 gives an area of 50 m when halved; a rectangle from (5, 20) to (12, 20), area 7 × 20 = 140 m; a trapezium from (12, 20) to (16, 4), where (20 + 4) × 4 = 96 gives an area of 48 m when halved; and a rectangle from (16, 4) to (20, 4), area 4 × 4 = 16 m — a total distance of 50 + 140 + 48 + 16 = 254 m. Dividing by the 20 seconds gives an average speed of 254 ÷ 20 = 12.7 m/s. Writing 15.1 m/s comes from forgetting to halve the trapezium area for the third section, using 96 instead of 48: a total of 302 m, and 302 ÷ 20 = 15.1 m/s. Writing 11.9 m/s comes from leaving out the final section, from (16, 4) to (20, 4), entirely: a total of 238 m, and 238 ÷ 20 = 11.9 m/s. Writing 12.1 m/s comes from dividing the correct total distance by 21 instead of 20 — a fencepost slip, counting the whole seconds from t = 0 to t = 20 inclusive as 21 seconds of travel rather than reading the journey as a duration of 20 seconds: 254 ÷ 21 = 12.1 m/s (1 d.p.).
- (d) x = 4 or x = −4 — Method: divide both sides by 2 to get x² = 16, then take the square root of both sides: x = 4 or x = −4. Distractor origins: x = 4 forgets the negative root; x = 8 comes from halving 16 instead of taking its square root; x = 16 stops at x² = 16 without ever taking the square root.
- (c) xₙ₊₁ = ∛(9 − 4xₙ) — Method: a formula xₙ₊₁ = f(xₙ) is a correct rearrangement when the equation x = f(x) turns back into the equation you started with, so rearrange x³ + 4x − 9 = 0 by making the cube the subject. Working: x³ + 4x − 9 = 0 gives x³ = 9 − 4x, because the 4x and the 9 each change sign as they cross the equals sign; taking the cube root of both sides gives x = ∛(9 − 4x), which is the formula xₙ₊₁ = ∛(9 − 4xₙ). Answer: xₙ₊₁ = ∛(9 − 4xₙ). The distractors: ∛(9 + 4xₙ) comes from writing x³ = 9 + 4x, moving the 4x across the equals sign without changing its sign; (9 + xₙ³)/4 comes from making the linear term the subject but keeping the sign of the cube, writing 4x = 9 + x³ when the equation gives 4x = 9 − x³; ∛(9 − 4xₙ³) cubes the x in the linear term as well, changing a term the original equation never cubed.
- (c) 5 — Method: let a be the number of adult tickets, so the number of child tickets is 9 − a. Form the equation 10a + 6(9 − a) = 74. Working: expand the bracket: 10a + 54 − 6a = 74, so 4a = 20, giving a = 5. Answer: 5 adult tickets. 4 comes from correctly finding the number of child tickets but reporting it instead of the number of adult tickets asked for. 1.25 comes from a sign error expanding the bracket, writing 10a + 54 + 6a = 74 instead of subtracting, which gives 16a = 20. 7.4 comes from dividing the total takings by the adult ticket price only, ignoring the children entirely, 74 ÷ 10.
- (a) It gets closer to zero but never actually reaches it. — y = 60 × (0.5)ˣ is always positive, however large x is, because a positive number raised to any power stays positive. As x increases, (0.5)ˣ gets smaller and smaller but never equals zero, so y approaches zero without ever reaching it. Believing the curve reaches zero when x = 60, because 60 is the starting value, mixes up the y-intercept with a stopping point — an exponential decay curve like this one never actually reaches the x-axis, so this is wrong. Believing the curve goes negative for large x is wrong because multiplying a positive number by (0.5) any number of times can never produce a negative result. Believing the curve levels off at y = 0.5, confusing the base of the exponential with its eventual level, is wrong: the base only controls how fast the curve falls, not where it settles — this curve settles at y = 0, not y = 0.5. Whenever you sketch an exponential decay curve, draw it approaching the x-axis but never touching it.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (b) x² + y² = 1369 — For a circle centred at the origin, the radius squared equals the sum of the squares of the coordinates of any point on it: r² = 12² + 35² = 144 + 1225 = 1369. The equation is x² + y² = 1369. x² + y² = 2209 comes from adding the coordinates first and then squaring the sum: (12 + 35)² = 47² = 2209, instead of squaring each coordinate separately. x² + y² = 1225 comes from using only 35² and leaving out the 12² term. x² + y² = 144 comes from using only 12² and leaving out the 35² term.
Build your own mix at the worksheet builder.