Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (d) x = −4, y = −19 — x² + 8x − 3 = (x + 4)² − 4² − 3 = (x + 4)² − 19. Substituting x = −4: (−4)² = 16, 8 × (−4) = −32, so 16 − 32 − 3 = −19, confirming the minimum value −19 at x = −4: turning point (−4, −19). Using 8 instead of half of it inside the bracket gives (x + 8)² − 67, turning point (−8, −67) — wrong, because only half the coefficient of x belongs inside the bracket. Reading the bracket's sign directly as the turning point's x-coordinate gives (4, −19) — wrong, because (x + 4)² is zero at x = −4, not x = 4. Computing 16 + 3 = 19 instead of −3 − 16 = −19 flips the sign of the constant, giving (−4, 19) — wrong, since the completed square's constant must be evaluated as −3 minus 16, not 16 plus 3. Check by substitution whenever the sign of a constant feels uncertain.
- (c) £9.70 — F = 2.50 + 1.20 × 6 = 2.50 + 7.20 = £9.70. £7.20 comes from forgetting to add the £2.50 fixed charge. £10.20 comes from adding the 2.50 to the number of miles before multiplying by 1.20, 1.20 × (6 + 2.50). £22.20 comes from adding the fixed charge and the rate together first and then multiplying by the miles, (2.50 + 1.20) × 6.
- (b) 235 litres — The flow rate at t = 10 is the gradient of the tangent: change in volume ÷ change in time = (190 − 130) ÷ (12 − 8) = 60 ÷ 4 = 15 litres per minute. Treating this rate as roughly constant for a short interval, the volume 5 minutes after t = 10 is estimated as 160 + 5 × 15 = 235 litres. Using the tangent's own point spacing — 2 minutes, from t = 10 to t = 12 — instead of the 5 minutes actually asked for gives 160 + 2 × 15 = 190, which is just the volume already given at one of the tangent's own points, not an answer to the question asked. Multiplying the gradient by the time WITHOUT adding the starting volume, 5 × 15 = 75, forgets that a rate estimates a CHANGE, which must be added to the starting volume, not given as the answer on its own. Subtracting instead of adding, 160 − 5 × 15 = 85, extrapolates backward in time rather than forward.
- (c) x = 0 or x = 3 — Method: take out the common factor 5x: 5x(x − 3) = 0, so 5x = 0 or x − 3 = 0, giving x = 0 or x = 3. Distractor origins: x = 0 or x = 15 comes from forgetting to divide the second term by the common factor 5x correctly, leaving 15 instead of 3; x = 3 loses the solution x = 0 by dividing both sides by x; x = 5 or x = 3 mistakes the coefficient 5 itself for one of the solutions.
- (c) P — Sequence P has a common ratio of 2 (4 × 2 = 8, 8 × 2 = 16, 16 × 2 = 32), so it is geometric. Sequence Q has a common difference of 4, which is arithmetic, not geometric — a candidate who confuses a constant difference with a constant ratio picks Q. Sequence R has increasing differences of 3, 5, 7, a quadratic sequence, not geometric — a candidate who assumes any fast-growing sequence must be geometric picks R. Sequence S is the square numbers from 2² onwards (2², 3², 4², 5²), which is also quadratic, not geometric — a candidate who thinks squaring always means geometric growth picks S.
- (c) 2.26 — Method: apply the formula repeatedly, keeping the whole display each time, and stop when two values in a row round to the same 2 decimal places; that shared rounded value is the solution to that accuracy. Working: x₁ = ∛(2 × 2 + 7) = ∛11 = 2.22398…; x₂ = ∛(2 × 2.22398… + 7) = ∛11.44796… = 2.25377…; x₃ = ∛11.50754… = 2.25767…; x₄ = ∛11.51534… = 2.25818…. Now x₃ and x₄ both round to 2.26, so the sequence has settled. Answer: 2.26. The distractors: 2.22 is x₁ rounded, quoted by a candidate who stops after one use of the formula; 2.25 is x₂ rounded, quoted by a candidate who stops as soon as two values look close instead of waiting until two consecutive values round to the same figure; 1.91 is ∛7, which comes from ignoring the 2x term and solving x³ = 7 instead.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (a) 27 — Method: let the smaller number be n, so the larger number is n + 9. Form the equation n + (n + 9) = 45. Working: simplify: 2n + 9 = 45, so 2n = 36, giving n = 18. The larger number is 18 + 9 = 27. Answer: 27. 18 is the smaller number, found correctly, but given as the answer to the question asking for the larger number. 22.5 comes from ignoring the "9 more" part and simply halving the total, 45 ÷ 2. 36 comes from a sign error when isolating the constant, treating the equation as 2n = 45 + 9 instead of 2n = 45 − 9.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (d) 680 m — First find how long the acceleration takes: acceleration = change in speed ÷ time, so 2.5 = 20 ÷ t, giving t = 20 ÷ 2.5 = 8 seconds. The distance during this phase is the area of a triangle with base 8 and height 20: 1/2 × 8 × 20 = 80 m. The distance during the constant-speed phase is 20 × 30 = 600 m, since distance = speed × time at a constant speed. The total distance is 80 + 600 = 680 m. Using the given 30 seconds for the acceleration phase as well, 1/2 × 30 × 20 = 300, plus the correct 600, gives 900 m — but 30 seconds is only stated for the constant-speed phase. Leaving out the 1/2 and using the full rectangle for the acceleration phase, 8 × 20 = 160, plus the correct 600, gives 760 m — the speed is not constant during acceleration, so this area is a triangle, not a rectangle. Swapping the two times round, and using 8 seconds for the constant-speed distance instead of 30, 20 × 8 = 160, plus the correct triangle area of 80, gives 240 m.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (c) 16 km/h — Method: total distance = 12 + 8 = 20 km. Total time = 30 + 30 + 15 = 75 minutes = 1.25 hours. Average speed = total distance ÷ total time = 20 ÷ 1.25 = 16 km/h. Distractor origins: 20 km/h gives the total distance without ever dividing by the total time; 24 km/h uses only the speed of the first stage (12 km in 30 minutes), ignoring the second stage and the rest; 28 km/h averages the two separate stage speeds, 24 km/h and 32 km/h, instead of using total distance over total time.
Build your own mix at the worksheet builder.