Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 0 — the line does not intersect the circle — Substitute y = 2x + 7 into x² + y² = 4: x² + (2x + 7)² = 4, which expands to x² + 4x² + 28x + 49 = 4, giving 5x² + 28x + 45 = 0. The discriminant is b² − 4ac = 28² − 4 × 5 × 45. Since 28² = 784 and 4 × 5 × 45 = 900, the discriminant is 784 − 900 = −116. Since the discriminant is negative, the quadratic has no real solutions, so the line does not meet the circle at all: 0 intersection points. Distractor routes: "1 — the line is a tangent" confuses a negative discriminant with a zero one; a discriminant of exactly zero gives one point, a tangent, but −116 is not zero. "2 — the line crosses the circle at two points" assumes a positive discriminant without actually working it out. "It cannot be found without solving the quadratic" is the whole point the discriminant exists to avoid — its sign alone, without finding x, tells you the number of real solutions.
- (b) 2 < x < 6 — Factorise: x² − 8x + 12 = (x − 2)(x − 6), giving roots at x = 2 and x = 6. Since the coefficient of x² is positive, the graph is a U-shape that is negative, below the axis, between its roots. So P < 0 for 2 < x < 6. Distractor routes: x < 2 or x > 6 takes the region outside the roots, which is where P is positive, a profit, the opposite of a loss. 2 ≤ x ≤ 6 includes the endpoints, where P = 0 exactly, break-even rather than a loss, since the inequality is strict. −6 < x < −2 comes from factorising as (x + 2)(x + 6), reversing the sign of both roots.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (b) s = d / t — Method: undo the multiplication by t by dividing both sides by t. Working: d = st, so dividing both sides by t gives s = d / t. The value s = dt comes from multiplying by t instead of dividing. The value s = t / d comes from inverting the fraction, dividing t by d instead of d by t. The value s = d − t comes from subtracting t instead of dividing by it.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (b) 3 — Method: a term is any part of an expression separated from the rest by a + or − sign, including a number on its own. Working: 8 − 3x + 5x² splits at the + and − signs into 8, −3x and 5x² — that is three separate terms. Answer: 3. Ryan's answer of 2 comes from wrongly excluding the number 8, thinking a term must contain a letter. 5 comes from miscounting by treating the coefficients and powers as separate terms as well as the letters. 1 comes from treating the whole expression as a single term because it is written without brackets.
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
- (a) t = 0 or t = 4 — The ball is at ground level exactly when h = 0. From the table, h = 0 at t = 0 and at t = 4, so those are the two times. Distractor origins: t = 1 or t = 3 picks the times with equal (but non-zero) height instead of ground level; t = 2 picks the time of maximum height instead of ground level; t = 0 finds only the starting time and misses the second one.
- (a) 36 km/h — Speed is distance ÷ time. Convert 25 minutes to hours: 25 ÷ 60 = 5/12 hours. Then 15 ÷ (5/12) = 15 × 12/5 = 36 km/h. Dividing 15 by 25 without converting minutes to hours gives 0.6 km/h. Multiplying 15 by 25/60 instead of dividing by it gives 6.25 km/h. Working out the speed in km per minute, 0.6, and then multiplying by 24 instead of 60 gives 14.4 km/h.
- (c) £9.70 — F = 2.50 + 1.20 × 6 = 2.50 + 7.20 = £9.70. £7.20 comes from forgetting to add the £2.50 fixed charge. £10.20 comes from adding the 2.50 to the number of miles before multiplying by 1.20, 1.20 × (6 + 2.50). £22.20 comes from adding the fixed charge and the rate together first and then multiplying by the miles, (2.50 + 1.20) × 6.
- (c) 19 — Method: set up the equation 15 + 9n = 186, then subtract the deposit and divide by the cost per student. Working: 9n = 186 − 15 = 171; n = 171 ÷ 9 = 19. Answer: 19 students. 20.67 comes from dividing the whole £186 by £9 without first subtracting the deposit: 186 ÷ 9 ≈ 20.67. 11.8 comes from swapping the two amounts round, subtracting £9 and dividing by £15: (186 − 9) ÷ 15 = 11.8. 22.33 comes from adding the deposit instead of subtracting it: (186 + 15) ÷ 9 ≈ 22.33.
- (b) x = 5 — Area = length × width, so x(x + 3) = 40, which rearranges to x² + 3x − 40 = 0. This factorises as (x + 8)(x − 5) = 0: the two numbers in the brackets must multiply to −40 and add to +3, and the pair 8 and −5 does both. This gives x = −8 or x = 5. Since x is a length, it cannot be negative, so x = 5. A candidate who gives both solutions without rejecting the negative one, which cannot be a length, answers x = 5 or x = −8. A candidate who picks the wrong factor pair of 40, such as 10 and −4 instead of 8 and −5, gets (x + 10)(x − 4) = 0 and answers x = 4. A candidate who rejects the wrong root, keeping the negative solution instead of the positive one, answers x = −8.
- (d) 400 m — The distance travelled equals the area under the speed-time graph. The first 10 seconds form a triangle with base 10 and height 20, giving an area of 0.5 × 10 × 20 = 100 m. The next 15 seconds form a rectangle with base 15 and height 20, giving an area of 15 × 20 = 300 m. The total distance is 100 + 300 = 400 m. The option 500 m treats the whole 25 seconds as travelled at the constant 20 m/s, ignoring that the speed was building up during the first 10 seconds: 25 × 20 = 500. The option 300 m only counts the constant-speed section and forgets the triangle section entirely. The option 200 m comes from working out the triangle's area without halving it (10 × 20 = 200) and forgetting the rectangle altogether.
- (a) 130 — Method: substitute the total bill into the formula, then subtract the fixed charge and divide by the cost per text message. Working: 24.50 = 18 + 0.05t, so 0.05t = 24.50 − 18 = 6.50, t = 6.50 ÷ 0.05 = 130. Answer: 130 extra text messages. 490 comes from dividing the whole bill by 0.05 without first subtracting the £18 fixed charge: 24.50 ÷ 0.05 = 490. 13 comes from dividing the £6.50 by 0.5 instead of 0.05, moving the decimal point one place too far: 6.50 ÷ 0.5 = 13. 65 comes from dividing the £6.50 by 0.1 instead of 0.05.
- (d) 3.425 — x₁ = ∛(6 × 3 + 20) = ∛38 = 3.3620 (unrounded, 3.36198...). x₂ = ∛(6 × 3.3620 + 20) = ∛40.172 = 3.425 (3 d.p.). Choosing 3.362 stops at x₁ instead of continuing to x₂. Choosing 2.722 leaves out the '+ 20' inside the root, working out ∛(6 × 3.3620) = ∛20.172 = 2.722. Choosing 0.556 subtracts 20 instead of adding it, working out ∛(6 × 3.3620 − 20) = ∛0.172 = 0.556.
Build your own mix at the worksheet builder.