Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) x = −2, y = −5 — 3x² + 12x + 7 rewrites as 3(x² + 4x) + 7, then as 3[(x + 2)² − 4] + 7, which simplifies to 3(x + 2)² − 5, since −3 × 4 + 7 = −5. Substituting x = −2: 3 × (−2)² = 12, 12 × (−2) = −24, so 12 − 24 + 7 = −5, confirming the minimum value −5 at x = −2: turning point x = −2, y = −5. Halving b instead of halving b/a — using −4 as the shift instead of −2 — lands on turning point x = −4, y = −41, which is wrong because when a ≠ 1 the shift inside the bracket is b/(2a), not b/a alone. Reading the bracket's sign directly as the turning point's x-coordinate gives x = 2, y = −5 — wrong, because (x + 2)² is zero at x = −2, not x = 2. Computing 12 − 7 = 5 instead of 7 − 12 = −5 flips the sign of the constant, giving x = −2, y = 5 — wrong, since the completed square's constant must be evaluated as 7 minus 12, not 12 minus 7. Whenever a ≠ 1, factor a out of the x² and x terms first, and always check a turning point by substituting back into the original equation.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (a) 1.861 — x₁ = ∛(10 − 2²) = ∛6 = 1.817120593. x₂ = ∛(10 − 1.817120593²) = ∛6.698072751 = 1.885022855. x₃ = ∛(10 − 1.885022855²) = ∛6.446688837 = 1.861139399, which rounds to 1.861. Reporting x₂ instead of x₃ gives 1.885022855, which rounds to 1.885. Stopping after the first iteration and reporting x₁ instead of x₃ gives 1.817120593, which rounds to 1.817. A sign error inside the cube root, using xₙ₊₁ = ∛(10 + xₙ²) instead of ∛(10 − xₙ²), gives x₁ = ∛14 = 2.410142264, x₂ = ∛(10 + 2.410142264²) = 2.509763724, and x₃ = ∛(10 + 2.509763724²) = 2.535437381, which rounds to 2.535.
- (c) 12 cm — For a square, area = side². So side² = 144, giving side = ±12. Since a length must be positive, the side length is 12 cm. A candidate who gives both square roots without rejecting the negative one, which cannot be a length, answers 12 cm or −12 cm. A candidate who halves 144 instead of taking its square root gets 72 cm. A candidate who divides 144 by 4, confusing the area formula with a perimeter calculation, gets 36 cm.
- (c) 307.1 g — The multiplier for one hour is 1 − 0.15 = 0.85. After 3 hours the mass is 500 × 0.85³. Since 0.85 × 0.85 = 0.7225 and 0.85 × 0.7225 = 0.614125, the mass is 500 × 0.614125 = 307.0625 g, which rounds to 307.1 g. Stopping after only 2 hours instead of 3 gives 500 × 0.7225 = 361.25 g, which rounds to 361.3 g — wrong, because the question asks for 3 hours, not 2. Treating the decay as simple (15% × 3 = 45% lost in total, applied once) gives 500 × 0.55 = 275.0 g, which is wrong because the decay compounds hour by hour rather than adding up. Working out the AMOUNT LOST instead of the mass remaining gives 500 − 307.0625 = 192.9375 g, which rounds to 192.9 g — wrong, because the question asks what remains, not what has decayed away. Whenever a percentage decreases repeatedly, multiply by the same factor each period rather than adding the percentages together.
- (c) 4 years — The yearly multiplier is 1 − 0.12 = 0.88. After 1 year: 2400 × 0.88 = 2112. After 2 years: 2112 × 0.88 = 1858.56. After 3 years: 1858.56 × 0.88 = 1635.5328. After 4 years: 1635.5328 × 0.88 = 1439.27 (2 d.p.), which is the first value below £1,500 — so it takes 4 complete years. Stopping after 3 years, where the value is still £1,635.53, above £1,500, gives 3 years — wrong, because the threshold has not been crossed yet at that point. Continuing for one year longer than needed gives 5 years — wrong, because the value has already fallen below £1,500 by year 4, so year 5 overcounts. Multiplying by the percentage itself instead of by the multiplier — using 0.12 in place of 0.88 — gives 2400 × 0.12 = £288 after a single year, apparently below £1,500 straight away, so 1 year — wrong, because 12% is the part lost each year, and the part left is 88%, so the multiplier is 0.88.
- (b) (2, 4) and (−2, −4) — Substitute y = 2x into x² + y² = 20: x² + (2x)² = 20, which gives x² + 4x² = 20, so 5x² = 20, x² = 4, and x = 2 or x = −2. Using y = 2x for each x-value: x = 2 gives y = 4; x = −2 gives y = −4. The path meets the pond's edge at (2, 4) and (−2, −4). Distractor routes: (2, −4) and (−2, 4) swaps the sign pairing, matching each x-value with the wrong sign of y instead of keeping each x with its own correctly-signed y. (2, 1) and (−2, −1) comes from using y = x/2 instead of y = 2x when finding the y-coordinates. (2, 4) alone stops after the positive square root of x² = 4 and never finds the second point from x = −2.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (a) 2.154 — Continuing xₙ₊₁ = ∛(3xₙ + 4) from x₁ = 2.154 gives x₂ = 2.187, x₃ = 2.195, settling towards the root near 2.196 — this is the formula that converges. Continuing xₙ₊₁ = (xₙ³ − 4) ÷ 3 from x₁ = 1.333 gives x₂ = −0.543 and then x₃ = −1.387, moving further from the root each time. Continuing xₙ₊₁ = 4 ÷ (xₙ² − 3) from x₁ = 4 gives x₂ = 0.308 and then x₃ = −1.377, swinging wildly rather than settling. Continuing xₙ₊₁ = xₙ³ − 2xₙ − 4 from x₁ = 0 gives x₂ = −4 and then x₃ = −60, running away from the root entirely.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (c) 81 m — Split the velocity-time graph into its three phases. The accelerating phase (0 to 4 s) is a triangle: 1/2 × 4 × 6 = 12. The constant phase (4 s at 6 m/s, for 10 s) is a rectangle: 10 × 6 = 60. The decelerating phase (3 s) is a triangle: 1/2 × 3 × 6 = 9. Total distance: 12 + 60 + 9 = 81 m. Forgetting the final decelerating phase entirely and adding only the first two areas gives 12 + 60 = 72 m. Treating all three phases as rectangles, forgetting to halve either triangular phase, gives 4 × 6 + 10 × 6 + 3 × 6 = 102 m. Halving only the deceleration triangle correctly but treating the acceleration phase as a rectangle too gives 4 × 6 + 60 + 9 = 93 m.
- (a) 3.5 km/h — Average speed is total distance ÷ total time. Total distance = 5 + 9 = 14 km. Total time, including the rest, = 1 + 1 + 2 = 4 hours. So average speed = 14 ÷ 4 = 3.5 km/h. Leaving out the 1 hour rest and dividing by only the 3 hours of walking gives 14 ÷ 3 = 4.67 km/h. Averaging the two separate speeds, 5 km/h and 4.5 km/h, instead of using total distance over total time, gives (5 + 4.5) ÷ 2 = 4.75 km/h. Dividing only the second leg's distance by the total time, 9 ÷ 4 = 2.25 km/h, ignores the first leg's distance.
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
Build your own mix at the worksheet builder.