Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (c) 81 m — Split the velocity-time graph into its three phases. The accelerating phase (0 to 4 s) is a triangle: 1/2 × 4 × 6 = 12. The constant phase (4 s at 6 m/s, for 10 s) is a rectangle: 10 × 6 = 60. The decelerating phase (3 s) is a triangle: 1/2 × 3 × 6 = 9. Total distance: 12 + 60 + 9 = 81 m. Forgetting the final decelerating phase entirely and adding only the first two areas gives 12 + 60 = 72 m. Treating all three phases as rectangles, forgetting to halve either triangular phase, gives 4 × 6 + 10 × 6 + 3 × 6 = 102 m. Halving only the deceleration triangle correctly but treating the acceleration phase as a rectangle too gives 4 × 6 + 60 + 9 = 93 m.
- (b) 12 years — Method: call the number of years t, add t to both ages, and form an equation from the comparison at that future time. Working: in t years the leader will be 44 + t and the scout will be 16 + t, so 44 + t = 2(16 + t); expanding gives 44 + t = 32 + 2t, and subtracting t and 32 from both sides gives t = 12. Checking: in 12 years the leader will be 56 and the scout 28, and 56 = 2 × 28. Answer: 12 years. The distractors: 6 years comes from halving the leader's present age instead, so that the scout has to reach 22, which takes 6 years; 14 years comes from halving the 28-year gap between the two ages; 28 years comes from giving the age gap itself as the number of years.
- (b) £2.00 — Subtracting the second equation from the first eliminates the pastries: (3c + 2p) − (2c + 2p) = 9.60 − 7.60, so c = 2.00. A candidate who divides the first total by the number of coffees alone, ignoring the pastries, would get 9.60 ÷ 3 = £3.20. A candidate who finds the price of a pastry instead of a coffee — using c = 2.00 in 2c + 2p = 7.60 to get p = 1.80 — would answer £1.80. A candidate who reaches the correct difference of £2.00 but then mistakenly divides again or misplaces the decimal point would get £0.20.
- (d) 12 — Since a₃ = a₂ + a₁, rearranging gives a₂ = a₃ − a₁ = 17 − 5 = 12. 22 comes from adding instead of subtracting: a₃ + a₁ = 17 + 5 = 22. 11 comes from treating the sequence as if it were arithmetic and averaging the two given terms: (5 + 17) ÷ 2 = 11 — but a Fibonacci-type sequence isn't arithmetic, so this doesn't apply. −12 comes from subtracting in the wrong order: a₁ − a₃ = 5 − 17 = −12.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (c) Fastest at t = 2 min — steepest gradient. — The rate of cooling is given by the size (magnitude) of the gradient, ignoring its sign — the steeper the tangent, the faster the temperature is changing. Of −8, −3 and −0.5, the gradient −8 has the greatest magnitude, so the tea is cooling fastest at t = 2 minutes. 'Fastest at t = 20 min — largest gradient' confuses the signed value with the size of the rate: −0.5 is the largest NUMBER of the three, but it's the smallest in magnitude, meaning the tea is barely cooling at all by then. 'Cools at the same rate throughout' ignores that the three gradients are different sizes, not just all negative. 'Fastest at t = 10 min — the middle reading' isn't a mathematical reason at all — the gradients themselves have to be compared, not their position in the list.
- (c) 2.61 — The limit L satisfies L = 12 ÷ (L + 2), so L(L + 2) = 12, giving L² + 2L − 12 = 0 and L = (−2 + √52) ÷ 2 = 2.6056, which is 2.61 to 2 decimal places (the early iterates 4, 2, 3, 2.4, 2.73, ... oscillate around this value before settling). Choosing 3.00 reads off x₃, one of the early oscillating values, before the sequence has settled close to the limit. Choosing 4.00 reads off x₁, the very first iterate, not the value the sequence approaches. Choosing 6.00 comes from writing the limit equation as L = 12 ÷ 2, leaving L itself out of the denominator.
- (d) 3 and 4 — f(3) = 3³ − 3 × 3² − 4 = 27 − 27 − 4 = −4, and f(4) = 4³ − 3 × 4² − 4 = 64 − 48 − 4 = 12. Since f(3) is negative and f(4) is positive, there is a change of sign, so the solution lies between 3 and 4. A sign slip when expanding −3x², treating it as +3x², gives f(3) = 27 + 27 − 4 = 50, a positive value; taken with the correctly negative f(2) = 8 − 12 − 4 = −8, this reads as a change of sign between 2 and 3. The same sign slip applied at x = 1 gives f(1) = 1 + 3 − 4 = 0, read as the point the sign changes, against f(0) = 0 + 0 − 4 = −4, giving 0 and 1. Shifting the correctly found interval up by one integer, an indexing slip, reports the change as lying between 4 and 5 instead of 3 and 4.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
- (a) Subtracting 4x gives 3 = 10, which is never true. — Method: try to solve the equation as normal and see what happens. Working: subtract 4x from both sides: 4x + 3 − 4x = 4x + 10 − 4x, giving 3 = 10. This statement is false for every value of x, so the equation has no solution. Answer: subtracting 4x gives 3 = 10, which is never true. "x would have to be negative" invents a constraint on x that the equation never states. "It's true for every x" confuses this equation with an identity, where both sides would simplify to the same expression. "x = 7" misreads the false statement 3 = 10 as something to solve for x, rather than recognising it means no solution exists.
- (d) 2.7 — The height after 3 years of 10% compound growth is 2 × 1.1³ = 2.662 m, which rounds to 2.7 m. A candidate who adds 10% of the original height (0.2 m) in each of the 3 years, instead of compounding on the new height each time, would reach 2 + 3×0.2 = 2.6 m. A candidate who compounds for only 2 years would reach 2 × 1.1² = 2.42 m, rounding to 2.4 m. A candidate who compounds for 4 years instead of 3 would reach 2 × 1.1⁴ = 2.928 m, rounding to 2.9 m.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
Build your own mix at the worksheet builder.