Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 23 — Method: let the smallest integer be n, so the three consecutive integers are n, n + 1 and n + 2. Form the equation n + (n + 1) + (n + 2) = 72. Working: simplify the left side: 3n + 3 = 72, so 3n = 69, giving n = 23. Answer: 23. 24 comes from dividing 72 by 3 directly, 72 ÷ 3 = 24, which finds the middle integer rather than realising the three numbers differ. 25 comes from correctly finding n = 23 but reading off the largest integer, n + 2, instead of the smallest as asked. 21 comes from dividing first and subtracting after, (72 ÷ 3) − 3, instead of subtracting 3 before dividing by 3.
- (d) 1 hour 32 minutes — T = 40 × 1.8 + 20 = 72 + 20 = 92 minutes. Since 92 = 60 + 32, the cooking time is 1 hour 32 minutes. A candidate who rounds the mass to 2 kg before substituting gets 40 × 2 + 20 = 100 minutes = 1 hour 40 minutes. A candidate who forgets to add the 20 minutes gets 40 × 1.8 = 72 minutes = 1 hour 12 minutes. A candidate who multiplies the mass by (40 + 20) = 60 instead of substituting into the formula gets 1.8 × 60 = 108 minutes = 1 hour 48 minutes.
- (a) 1.861 — x₁ = ∛(10 − 2²) = ∛6 = 1.817120593. x₂ = ∛(10 − 1.817120593²) = ∛6.698072751 = 1.885022855. x₃ = ∛(10 − 1.885022855²) = ∛6.446688837 = 1.861139399, which rounds to 1.861. Reporting x₂ instead of x₃ gives 1.885022855, which rounds to 1.885. Stopping after the first iteration and reporting x₁ instead of x₃ gives 1.817120593, which rounds to 1.817. A sign error inside the cube root, using xₙ₊₁ = ∛(10 + xₙ²) instead of ∛(10 − xₙ²), gives x₁ = ∛14 = 2.410142264, x₂ = ∛(10 + 2.410142264²) = 2.509763724, and x₃ = ∛(10 + 2.509763724²) = 2.535437381, which rounds to 2.535.
- (c) 26.6 — h² = 1.6² = 2.56, so B = 68 ÷ 2.56 = 26.5625, which rounds to 26.6 (1 d.p.). A candidate who forgets to square the height gets 68 ÷ 1.6 = 42.5. A candidate who squares the mass instead of the height gets 68² ÷ 1.6 = 2890.0. A candidate who truncates 26.5625 instead of rounding it gets 26.5.
- (c) (3, 9) — Reflecting in the horizontal line y = 2 keeps the x-coordinate the same and maps y to 2 × 2 − y = 4 − (−5) = 9, so S = (3, 9). A candidate who uses k − y instead of 2k − y gets 2 − (−5) = 7, giving (3, 7). A candidate who reflects in the x-axis instead of the line y = 2, simply changing the sign of y, gets (3, 5). A candidate who also changes the sign of the x-coordinate, as if reflecting in both axes, gets (−3, 9).
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
- (c) 3.153 — x₁ = √(4 × 1 + 1) = √5 = 2.236067977. x₂ = √(4 × 2.236067977 + 1) = √9.944271908 = 3.153453965, which rounds to 3.153. Reporting x₁ instead of x₂ gives 2.236067977, which rounds to 2.236. A sign error inside the root, using xₙ₊₁ = √(4xₙ − 1) instead of √(4xₙ + 1), gives x₁ = √3 = 1.732050808 and x₂ = √(4 × 1.732050808 − 1) = √5.928203232 = 2.434790182, which rounds to 2.435. Applying the formula in the wrong order, working out √(4xₙ) + 1 at every step instead of √(4xₙ + 1), gives x₁ = √4 + 1 = 3 and x₂ = √(4 × 3) + 1 = 4.464101615, which rounds to 4.464.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (a) 842.0 — The radius to (20, 21) has gradient 21/20, so the tangent's gradient is −20/21. The tangent line is y − 21 = −20/21(x − 20), i.e. y = −20/21x + 841/21. Setting y = 0 gives the x-intercept x = 841/20 = 42.05; setting x = 0 gives the y-intercept y = 841/21 ≈ 40.048. The area of triangle OPQ is 1/2 × 42.05 × 40.048 ≈ 842.0. 1684.0 comes from multiplying the two intercepts without the 1/2 that a triangle's area needs — twice the correct area. 580.7 comes from using the circle's radius, 29, as a side of the triangle instead of the x-intercept, 42.05: 1/2 × 29 × 40.048 ≈ 580.7. 2.0 comes from a sign error in the tangent's gradient — using 20/21 instead of −20/21 — which gives a different line, with intercepts x ≈ −2.05 and y ≈ 1.952, and area 1/2 × 2.05 × 1.952 ≈ 2.0.
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (d) 168 m — Split the area under the graph into two parts. The rising section (0 to 8 s) is a triangle: area = 0.5 × 8 × 12 = 48. The constant section, from 8 s to 18 s (10 s), is a rectangle: area = 12 × 10 = 120. Total distance = 48 + 120 = 168 m. Leaving out the 0.5 doubles the triangle, giving 8 × 12 + 120 = 216 m; ignoring the triangle section altogether gives only 120 m; averaging the start and final speeds over the whole 18 seconds, (0 + 12) ÷ 2 = 6, then 6 × 18 = 108 m, wrongly treats the tram as accelerating the whole time, when the graph is flat for the last 10 seconds.
- (a) 27 — Method: let the smaller number be n, so the larger number is n + 9. Form the equation n + (n + 9) = 45. Working: simplify: 2n + 9 = 45, so 2n = 36, giving n = 18. The larger number is 18 + 9 = 27. Answer: 27. 18 is the smaller number, found correctly, but given as the answer to the question asking for the larger number. 22.5 comes from ignoring the "9 more" part and simply halving the total, 45 ÷ 2. 36 comes from a sign error when isolating the constant, treating the equation as 2n = 45 + 9 instead of 2n = 45 − 9.
- (b) y decreases towards zero but never reaches it — Method: as x gets larger, dividing 20 by a bigger number gives a smaller result, so y decreases; because 20/x can never be exactly zero for any positive x, the curve gets closer to zero without ever reaching it, so y decreases towards zero but never reaches it. Distractor origins: 'y increases towards a limit but never reaches it' has the relationship backwards, treating y as increasing when it is actually decreasing; 'y decreases at a steady rate and reaches zero' wrongly assumes the graph behaves like a straight line that eventually hits zero; 'y stays the same however large x becomes' wrongly assumes there is no change in y at all.
- (b) 6x + 6 — Perimeter = 2[(2x + 5) + (x − 2)] = 2(3x + 3) = 6x + 6. A candidate who adds the length and width but forgets to double for the perimeter gets 3x + 3. A candidate who makes a sign error and adds 2 instead of subtracting it before doubling gets 2[(2x + 5) + (x + 2)] = 6x + 14. A candidate who multiplies the length and width instead of adding them, confusing the perimeter formula with the area formula, and then doubles that product, gets 2(2x + 5)(x − 2) = 4x² + 2x − 20.
Build your own mix at the worksheet builder.