Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 14.1 — Method: in x² + y² = r² the right-hand side is the square of the radius, so take its square root to find the radius, then double the radius because the diameter is twice the radius. Working: r² = 50, so r = √50 = 7.07106…, and the diameter is 2 × 7.07106… = 14.14213…, which is 14.1 correct to 1 decimal place. Answer: 14.1. The distractors: 7.1 is the radius, worked out correctly but never doubled, so it answers a question about the radius rather than the diameter; 100.0 comes from doubling the 50 on the right-hand side, treating r² as though it were already the radius; 25.0 comes from halving the 50, treating r² as though it were already the diameter.
- (d) x = −4, y = −19 — x² + 8x − 3 = (x + 4)² − 4² − 3 = (x + 4)² − 19. Substituting x = −4: (−4)² = 16, 8 × (−4) = −32, so 16 − 32 − 3 = −19, confirming the minimum value −19 at x = −4: turning point (−4, −19). Using 8 instead of half of it inside the bracket gives (x + 8)² − 67, turning point (−8, −67) — wrong, because only half the coefficient of x belongs inside the bracket. Reading the bracket's sign directly as the turning point's x-coordinate gives (4, −19) — wrong, because (x + 4)² is zero at x = −4, not x = 4. Computing 16 + 3 = 19 instead of −3 − 16 = −19 flips the sign of the constant, giving (−4, 19) — wrong, since the completed square's constant must be evaluated as −3 minus 16, not 16 plus 3. Check by substitution whenever the sign of a constant feels uncertain.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (d) x² − 7x − 3 = 0 — Method: an iteration settles where the next value equals the one before it, so both can be written as the same letter x; replace every xₙ by x, square both sides to clear the square root, and collect all the terms on one side. Working: x = √(7x + 3) gives x² = 7x + 3 on squaring both sides; subtracting 7x and 3 from both sides gives x² − 7x − 3 = 0. Answer: x² − 7x − 3 = 0. The distractors: x² + 7x − 3 = 0 moves the 7x across the equals sign without changing its sign; x² − 7x + 3 = 0 makes that same slip on the constant instead, leaving the 3 positive as it crosses; x² − 7x − 9 = 0 squares the expression term by term, squaring the 3 to give 9 as though squaring √(7x + 3) gave 7x + 9, which is the (a + b)² = a² + b² mistake dressed as a square root.
- (a) Overestimates — trapezium edges lie above the curve. — For a concave-up curve, each chord connecting two points on the curve lies ABOVE the curve between those points, because the curve bends away from the chord underneath it. The trapezium rule uses these chords as the top edges of each trapezium, so the trapeziums cover a larger region than the true area under the curve — the estimate is an overestimate. Saying it underestimates because the edges lie below the curve gets the direction backwards: for a concave-up curve the edges lie above, not below. Saying it overestimates 'because more strips always increase it' gives the right verdict for the wrong reason — using MORE, narrower strips makes a trapezium estimate more accurate and brings it closer to the true area, it does not simply increase the total. Saying the estimate is exact ignores that straight edges cannot follow a curved line perfectly; there is always a gap between the chord and the curve on a bend, which is exactly what makes the rule an estimate rather than an exact calculation.
- (c) x = −2 or x = 4 — The solutions of x² − 2x − 8 = 0 are the x-values where y = 0. From the table, y = 0 when x = −2 and when x = 4, so those are the two solutions. Distractor origins: x = −1 or x = 3 picks the pair of x-values that give equal (but non-zero) y-values instead of y = 0; x = 0 or x = −8 mixes up an x-value with its corresponding y-value; x = −2 only reads off one of the two roots and misses the other.
- (c) 4 years — The yearly multiplier is 1 − 0.12 = 0.88. After 1 year: 2400 × 0.88 = 2112. After 2 years: 2112 × 0.88 = 1858.56. After 3 years: 1858.56 × 0.88 = 1635.5328. After 4 years: 1635.5328 × 0.88 = 1439.27 (2 d.p.), which is the first value below £1,500 — so it takes 4 complete years. Stopping after 3 years, where the value is still £1,635.53, above £1,500, gives 3 years — wrong, because the threshold has not been crossed yet at that point. Continuing for one year longer than needed gives 5 years — wrong, because the value has already fallen below £1,500 by year 4, so year 5 overcounts. Multiplying by the percentage itself instead of by the multiplier — using 0.12 in place of 0.88 — gives 2400 × 0.12 = £288 after a single year, apparently below £1,500 straight away, so 1 year — wrong, because 12% is the part lost each year, and the part left is 88%, so the multiplier is 0.88.
- (d) 680 m — First find how long the acceleration takes: acceleration = change in speed ÷ time, so 2.5 = 20 ÷ t, giving t = 20 ÷ 2.5 = 8 seconds. The distance during this phase is the area of a triangle with base 8 and height 20: 1/2 × 8 × 20 = 80 m. The distance during the constant-speed phase is 20 × 30 = 600 m, since distance = speed × time at a constant speed. The total distance is 80 + 600 = 680 m. Using the given 30 seconds for the acceleration phase as well, 1/2 × 30 × 20 = 300, plus the correct 600, gives 900 m — but 30 seconds is only stated for the constant-speed phase. Leaving out the 1/2 and using the full rectangle for the acceleration phase, 8 × 20 = 160, plus the correct 600, gives 760 m — the speed is not constant during acceleration, so this area is a triangle, not a rectangle. Swapping the two times round, and using 8 seconds for the constant-speed distance instead of 30, 20 × 8 = 160, plus the correct triangle area of 80, gives 240 m.
- (b) 8 — The perimeter is 2(x + (x + 3)) = 4x + 6, so 4x + 6 = 38, which gives 4x = 32 and x = 8. A candidate who forgets the '+3' and treats the rectangle as a square, solving 2(2x) = 38, gets x = 9.5. A candidate who forgets to double the sum of the sides, solving 2x + 3 = 38, gets x = 17.5. A candidate who uses 3x instead of x + 3 for the length, solving 2(x + 3x) = 38, gets x = 4.75.
- (d) 12 — Since a₃ = a₂ + a₁, rearranging gives a₂ = a₃ − a₁ = 17 − 5 = 12. 22 comes from adding instead of subtracting: a₃ + a₁ = 17 + 5 = 22. 11 comes from treating the sequence as if it were arithmetic and averaging the two given terms: (5 + 17) ÷ 2 = 11 — but a Fibonacci-type sequence isn't arithmetic, so this doesn't apply. −12 comes from subtracting in the wrong order: a₁ − a₃ = 5 − 17 = −12.
- (a) 40 — From 9am to 12 noon is 3 hours, so the population doubles three times: 5 × 2³ = 40. A candidate who counts the elapsed time as 4 hours (an off-by-one counting error) would reach 5 × 2⁴ = 80. A candidate who counts it as only 2 hours would reach 5 × 2² = 20. A candidate who misreads 'doubles' as 'increases by 2' each hour would compute 5 + 3 × 2 = 11.
- (c) 5 — Method: let a be the number of adult tickets, so the number of child tickets is 9 − a. Form the equation 10a + 6(9 − a) = 74. Working: expand the bracket: 10a + 54 − 6a = 74, so 4a = 20, giving a = 5. Answer: 5 adult tickets. 4 comes from correctly finding the number of child tickets but reporting it instead of the number of adult tickets asked for. 1.25 comes from a sign error expanding the bracket, writing 10a + 54 + 6a = 74 instead of subtracting, which gives 16a = 20. 7.4 comes from dividing the total takings by the adult ticket price only, ignoring the children entirely, 74 ÷ 10.
- (c) £9.70 — F = 2.50 + 1.20 × 6 = 2.50 + 7.20 = £9.70. £7.20 comes from forgetting to add the £2.50 fixed charge. £10.20 comes from adding the 2.50 to the number of miles before multiplying by 1.20, 1.20 × (6 + 2.50). £22.20 comes from adding the fixed charge and the rate together first and then multiplying by the miles, (2.50 + 1.20) × 6.
- (a) 7.9 m — Method: the iteration converges on the width of the plot, so run the formula three times from the starting value and then add 4 m, because the length is 4 m greater than the width. Working: x₁ = √(30 − 4 × 3) = √18 = 4.24264…; x₂ = √(30 − 4 × 4.24264…) = √13.02943… = 3.60963…; x₃ = √(30 − 4 × 3.60963…) = √15.56147… = 3.94480…. The estimate for the length is 3.94480… + 4 = 7.94480…, which is 7.9 m correct to 1 decimal place. Answer: 7.9 m. The iteration is still oscillating at x₃, so this is the estimate that three uses of the formula give, not a settled value. The distractors: 3.9 m is x₃ itself, the width, given by a candidate who runs the iteration correctly and then stops before the step the question actually asks for; 7.6 m uses x₂ in place of x₃, one use of the formula short, and then adds the 4 m correctly; 15.8 m multiplies the width by 4 instead of adding 4 m to it, reading greater than as a multiplier.
- (b) 3.38 — r₁ = √(300 ÷ (π × 8)) = √11.9366 = 3.4550. r₂ = √(300 ÷ (π × 8.4550)) = √11.2947 = 3.3608. r₃ = √(300 ÷ (π × 8.3608)) = √11.4232 = 3.3798, which rounds to 3.38. Choosing 3.36 stops at r₂, one iteration too early. Choosing 4.82 leaves out the '+ 5' inside the bracket, dividing by π × rₙ instead of π × (rₙ + 5). Choosing 3.45 comes from using π ≈ 3 instead of the calculator's π key throughout.
Build your own mix at the worksheet builder.