Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) x² − 7x − 3 = 0 — Method: an iteration settles where the next value equals the one before it, so both can be written as the same letter x; replace every xₙ by x, square both sides to clear the square root, and collect all the terms on one side. Working: x = √(7x + 3) gives x² = 7x + 3 on squaring both sides; subtracting 7x and 3 from both sides gives x² − 7x − 3 = 0. Answer: x² − 7x − 3 = 0. The distractors: x² + 7x − 3 = 0 moves the 7x across the equals sign without changing its sign; x² − 7x + 3 = 0 makes that same slip on the constant instead, leaving the 3 positive as it crosses; x² − 7x − 9 = 0 squares the expression term by term, squaring the 3 to give 9 as though squaring √(7x + 3) gave 7x + 9, which is the (a + b)² = a² + b² mistake dressed as a square root.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (a) 3.5 km/h — Average speed is total distance ÷ total time. Total distance = 5 + 9 = 14 km. Total time, including the rest, = 1 + 1 + 2 = 4 hours. So average speed = 14 ÷ 4 = 3.5 km/h. Leaving out the 1 hour rest and dividing by only the 3 hours of walking gives 14 ÷ 3 = 4.67 km/h. Averaging the two separate speeds, 5 km/h and 4.5 km/h, instead of using total distance over total time, gives (5 + 4.5) ÷ 2 = 4.75 km/h. Dividing only the second leg's distance by the total time, 9 ÷ 4 = 2.25 km/h, ignores the first leg's distance.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (d) 8 — Working backwards by halving (undoing the doubling), one 4-hour step at a time: 9,600 (20 h) → 4,800 (16 h) → 2,400 (12 h) → 1,200 (8 h) → 600 (4 h) → 300 (0 h). Reading these in time order — 300, 600, 1,200, 2,400, 4,800, 9,600 at 0, 4, 8, 12, 16, 20 hours — the population is still at or below 1,000 at 4 hours (600) and first goes above 1,000 at 8 hours (1,200). So the recorded population first exceeds 1,000 at 8 hours. Answering 20 just reads off the time stated in the question, without working out when the threshold was actually first crossed — wrong, because 9,600 is only the value AT 20 hours, not necessarily the first time the population passed 1,000. Answering 0 comes from recovering the starting population by dividing 9,600 by 5 (the number of 4-hour gaps up to 20 hours) instead of by 2⁵ = 32 (the correct number of halvings), giving a wrongly-inflated starting value of 9,600 ÷ 5 = 1,920 — already above 1,000 at 0 hours — wrong, because doubling means the value must be halved five times, dividing by 2 five times (2⁵ = 32), not divided once by the number of gaps. Answering 12 comes from halving back only twice, from 9,600 to 4,800 (16 h) to 2,400 (12 h), and stopping there because 2,400 is already above 1,000, without checking that 1,200 at 8 hours is also above 1,000 and occurs earlier — wrong, because the FIRST recorded time above 1,000 is the earliest such time, not the first one reached while working backwards from 20 hours.
- (d) 5 — Method: rearrange the formula to make m the subject, then substitute F = 15.50. Working: F = 3 + 2.5m, so subtracting 3 from both sides gives F − 3 = 2.5m, then dividing by 2.5 gives m = (F − 3) / 2.5. Substituting F = 15.50: m = (15.50 − 3) / 2.5 = 12.50 / 2.5 = 5. The value 6.2 comes from dividing 15.50 by 2.5 without subtracting the fixed £3 first. The value 3.2 comes from dividing first and subtracting afterwards, in the wrong order: (15.50 / 2.5) − 3 = 3.2. The value 7.4 comes from adding £3 instead of subtracting it before dividing: (15.50 + 3) / 2.5 = 7.4.
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (b) 5.00 — Continuing the iteration: x₁ = √(2 × 1 + 15) = √17 = 4.1231, x₂ = √(2 × 4.1231 + 15) = √23.2462 = 4.8214, x₃ = √(2 × 4.8214 + 15) = √24.6428 = 4.9642, x₄ = √(2 × 4.9642 + 15) = √24.9284 = 4.9928, and the values keep climbing towards 5.00 as n increases (the limit L satisfies L² = 2L + 15, so L² − 2L − 15 = 0, giving L = 5). Choosing 4.99 stops after x₄, one iteration before the value has settled fully to 5.00. Choosing 17.00 uses the value under the very first square root (2 × 1 + 15 = 17) as if that number itself were the limit. Choosing 1.00 assumes the sequence never moves from the starting value x₀.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (c) 22 — p² means p × p. Substitute p = 2.5: p² = 6.25, so 4p² = 4 × 6.25 = 25, and 25 − 3 = 22. 97 comes from squaring 4p together instead of just p, (4 × 2.5)² − 3 = 10² − 3 = 97. 7 comes from using p instead of p², 4 × 2.5 − 3. 1 comes from squaring the 3 instead of the p, 4 × 2.5 − 3².
- (c) x = −2 or x = 4 — The solutions of x² − 2x − 8 = 0 are the x-values where y = 0. From the table, y = 0 when x = −2 and when x = 4, so those are the two solutions. Distractor origins: x = −1 or x = 3 picks the pair of x-values that give equal (but non-zero) y-values instead of y = 0; x = 0 or x = −8 mixes up an x-value with its corresponding y-value; x = −2 only reads off one of the two roots and misses the other.
- (c) 72 m — The first section is a triangle with base 4 s and height 8 m/s, area = 1/2 × 4 × 8 = 16 m. The middle section is a rectangle with base 6 s and height 8 m/s, area = 6 × 8 = 48 m. The final section is a triangle with base 2 s and height 8 m/s, area = 1/2 × 2 × 8 = 8 m. Total distance = 16 + 48 + 8 = 72 m. Treating both sloping sections as full rectangles instead of triangles — forgetting the factor of a half — gives 4 × 8 + 6 × 8 + 2 × 8 = 96 m, which is wrong because a sloping speed-time section is a triangle, not a rectangle. Leaving out the final, decreasing section entirely gives 16 + 48 = 64 m, which is wrong because the cyclist is still moving and covering distance while slowing down. Leaving out the middle, constant-speed section gives 16 + 8 = 24 m, which is wrong because the cyclist covers the most distance of all during the 6 seconds of constant speed.
- (c) No — that moment has already passed — Method: call the number of years from now x, add x to both ages, form the equation from the comparison and then interpret the value of x that comes out. Working: in x years Harry will be 14 + x and Mia will be 8 + x, so 14 + x = 2(8 + x); expanding gives 14 + x = 16 + 2x, and subtracting x and 16 from both sides gives x = −2. A negative value of x places the moment two years in the past, when Harry was 12 and Mia was 6 and 12 = 2 × 6, so it is not something still to come. Answer: no — that moment has already passed. The distractors: the claim that it has never happened and never will comes from reaching x = −2 and reading a negative number of years as no solution at all, when x = −2 does not say that no such moment exists but says where it is — two years before now; the claim that it happens when Harry is 16 comes from doubling Mia's present age, 2 × 8 = 16, and reading that as the age Harry has to reach; the claim that it happens when Harry is 20 comes from expanding 2(8 + x) as 8 + 2x, doubling only the x, which gives x = 6.
- (c) x + 3 — Expand the bracket: 0.5(4x + 6) = 2x + 3. Then subtract the x: 2x + 3 − x = x + 3. The option 2x + 3 comes from expanding the bracket correctly but then forgetting to subtract the x at all. The option x + 6 comes from forgetting to multiply the 6 inside the bracket by 0.5 (treating it as 2x + 6), then subtracting x. The option 3x + 3 comes from adding the x instead of subtracting it: 2x + 3 + x = 3x + 3.
- (c) 4.30 — Method: substitute the starting value into the right-hand side to get x₁, then feed each value back in, keeping the whole display and respecting the order of operations, which divides before it subtracts. Working: x₁ = 5 − 3 ÷ 2.5 = 5 − 1.2 = 3.8; x₂ = 5 − 3 ÷ 3.8 = 5 − 0.78947… = 4.21052…; x₃ = 5 − 3 ÷ 4.21052… = 5 − 0.7125 = 4.2875; x₄ = 5 − 3 ÷ 4.2875 = 5 − 0.69970… = 4.30029…, which is 4.30 correct to 3 significant figures. Answer: 4.30. The distractors: 4.29 is x₃ = 4.2875 rounded, reached by counting the starting value itself as the first iterate and so stopping one use of the formula early; 3.80 is x₁, the value after a single use of the formula; 2.50 comes from working out (5 − 3) ÷ xₙ instead of 5 − (3 ÷ xₙ), subtracting before dividing, which produces the sequence 0.8, 2.5, 0.8, 2.5 and lands on 2.5 at the fourth step.
Build your own mix at the worksheet builder.