Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 6 — 3n + 4.5 = 22.5, so 3n = 18 and n = 6. A candidate who divides 22.5 by 3 first and ignores the 4.5 gets n = 7.5. A candidate who makes a sign error and forms the equation 3n − 4.5 = 22.5 gets 3n = 27 and n = 9. A candidate who divides by 3 before subtracting the 4.5, working out 22.5 ÷ 3 + 4.5, gets n = 12.
- (c) 3.153 — x₁ = √(4 × 1 + 1) = √5 = 2.236067977. x₂ = √(4 × 2.236067977 + 1) = √9.944271908 = 3.153453965, which rounds to 3.153. Reporting x₁ instead of x₂ gives 2.236067977, which rounds to 2.236. A sign error inside the root, using xₙ₊₁ = √(4xₙ − 1) instead of √(4xₙ + 1), gives x₁ = √3 = 1.732050808 and x₂ = √(4 × 1.732050808 − 1) = √5.928203232 = 2.434790182, which rounds to 2.435. Applying the formula in the wrong order, working out √(4xₙ) + 1 at every step instead of √(4xₙ + 1), gives x₁ = √4 + 1 = 3 and x₂ = √(4 × 3) + 1 = 4.464101615, which rounds to 4.464.
- (d) x + y = 7 — The midpoint of AB is (−1 + 5)/2, (2 + 8)/2, which is (2, 5). The gradient of AB is (8 − 2)/(5 − (−1)) = 6/6 = 1. The perpendicular bisector has gradient −1 and passes through (2, 5): y − 5 = −(x − 2), which rearranges to x + y = 7. Distractor routes: x − y = −3 uses the gradient of AB itself, 1, rather than its negative reciprocal, giving a line PARALLEL to AB through the midpoint instead of perpendicular to it. x + y = 12 comes from adding the y-coordinates, 2 + 8 = 10, but forgetting to divide by 2, using the midpoint (2, 10) instead of (2, 5). x + y = 4 comes from using A's x-coordinate, −1, directly instead of averaging it with B's, giving the point (−1, 5) instead of the true midpoint (2, 5).
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (b) 58.8 km/h — Total distance = 100 + 47 = 147 km. Total time = 1.5 + 0.25 + 0.75 = 2.5 hours. Average speed = 147 ÷ 2.5 = 58.8 km/h. Leaving out the 0.25 hours of waiting from the total time gives 147 ÷ 2.25 = 65.3 km/h (1 d.p.) — wrong, because the train is stationary but time is still passing on the whole journey. Using only the first leg gives 100 ÷ 1.5 = 66.7 km/h (1 d.p.) — wrong, because it ignores the second leg of the journey entirely. Working out each leg's own speed (100 ÷ 1.5 = 66.7 km/h and 47 ÷ 0.75 = 62.7 km/h) and then averaging those two speeds gives 64.7 km/h (1 d.p.) — wrong, because the average of two speeds over DIFFERENT times is not the same as total distance divided by total time.
- (c) 2 — At x = 1, y = 1² − 3(1) = 1 − 3 = −2. At x = 4, y = 4² − 3(4) = 16 − 12 = 4. Gradient of the chord = change in y ÷ change in x = (4 − (−2)) ÷ (4 − 1) = 6 ÷ 3 = 2. Writing down the change in y, 6, and stopping there without dividing by the change in x gives 6. Losing the negative sign on y = −2 at x = 1 and treating it as +2 gives (4 − 2) ÷ (4 − 1) = 2 ÷ 3 = 2/3. Dividing the wrong way round, change in x ÷ change in y, gives (4 − 1) ÷ (4 − (−2)) = 3 ÷ 6 = 1/2.
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (d) x = −4, y = −19 — x² + 8x − 3 = (x + 4)² − 4² − 3 = (x + 4)² − 19. Substituting x = −4: (−4)² = 16, 8 × (−4) = −32, so 16 − 32 − 3 = −19, confirming the minimum value −19 at x = −4: turning point (−4, −19). Using 8 instead of half of it inside the bracket gives (x + 8)² − 67, turning point (−8, −67) — wrong, because only half the coefficient of x belongs inside the bracket. Reading the bracket's sign directly as the turning point's x-coordinate gives (4, −19) — wrong, because (x + 4)² is zero at x = −4, not x = 4. Computing 16 + 3 = 19 instead of −3 − 16 = −19 flips the sign of the constant, giving (−4, 19) — wrong, since the completed square's constant must be evaluated as −3 minus 16, not 16 plus 3. Check by substitution whenever the sign of a constant feels uncertain.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (a) xₙ₊₁ = ∛(5xₙ + 3) — Starting from x³ − 5x − 3 = 0, add 5x and 3 to both sides to get x³ = 5x + 3, then take the cube root of both sides: x = ∛(5x + 3), giving the iterative formula xₙ₊₁ = ∛(5xₙ + 3). A sign error when moving the constant term across, treating x³ − 5x − 3 = 0 as x³ = 5x − 3, gives xₙ₊₁ = ∛(5xₙ − 3). Swapping the coefficient of x with the constant term gives xₙ₊₁ = ∛(3xₙ + 5), which does not come from x³ = 5x + 3 at all. Treating cubing as meaning multiply by 3 rather than raise to the power 3, and so undoing it by dividing by 3 instead of taking a cube root, gives xₙ₊₁ = (5xₙ + 3) ÷ 3.
- (a) 4 — Rectangle 1: P = 2(9 + 4) = 2 × 13 = 26 cm. Rectangle 2: P = 2(6 + 5) = 2 × 11 = 22 cm. Difference = 26 − 22 = 4 cm. 2 comes from finding the difference between (l + w) for each rectangle, 13 − 11 = 2, but forgetting to double it. 26 comes from giving rectangle 1's whole perimeter instead of the difference between the two. 6 comes from doubling only the change in length, 2 × (9 − 6), and ignoring that the width also changed.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (b) 5 cm³ — When P = 32, V = 480 ÷ 32 = 15 cm³. When P = 24, V = 480 ÷ 24 = 20 cm³. The increase in volume is 20 − 15 = 5 cm³. Giving only the second volume, 20 cm³, forgets to subtract the first volume. Giving only the first volume, 15 cm³, answers the wrong part of the question. Subtracting the two pressures instead of the two volumes, 32 − 24 = 8, mixes up which quantity the question asks for.
Build your own mix at the worksheet builder.