Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) y decreases towards zero but never reaches it — Method: as x gets larger, dividing 20 by a bigger number gives a smaller result, so y decreases; because 20/x can never be exactly zero for any positive x, the curve gets closer to zero without ever reaching it, so y decreases towards zero but never reaches it. Distractor origins: 'y increases towards a limit but never reaches it' has the relationship backwards, treating y as increasing when it is actually decreasing; 'y decreases at a steady rate and reaches zero' wrongly assumes the graph behaves like a straight line that eventually hits zero; 'y stays the same however large x becomes' wrongly assumes there is no change in y at all.
- (c) 19 — Method: set up the equation 15 + 9n = 186, then subtract the deposit and divide by the cost per student. Working: 9n = 186 − 15 = 171; n = 171 ÷ 9 = 19. Answer: 19 students. 20.67 comes from dividing the whole £186 by £9 without first subtracting the deposit: 186 ÷ 9 ≈ 20.67. 11.8 comes from swapping the two amounts round, subtracting £9 and dividing by £15: (186 − 9) ÷ 15 = 11.8. 22.33 comes from adding the deposit instead of subtracting it: (186 + 15) ÷ 9 ≈ 22.33.
- (c) 3.153 — x₁ = √(4 × 1 + 1) = √5 = 2.236067977. x₂ = √(4 × 2.236067977 + 1) = √9.944271908 = 3.153453965, which rounds to 3.153. Reporting x₁ instead of x₂ gives 2.236067977, which rounds to 2.236. A sign error inside the root, using xₙ₊₁ = √(4xₙ − 1) instead of √(4xₙ + 1), gives x₁ = √3 = 1.732050808 and x₂ = √(4 × 1.732050808 − 1) = √5.928203232 = 2.434790182, which rounds to 2.435. Applying the formula in the wrong order, working out √(4xₙ) + 1 at every step instead of √(4xₙ + 1), gives x₁ = √4 + 1 = 3 and x₂ = √(4 × 3) + 1 = 4.464101615, which rounds to 4.464.
- (c) 12 cm — For a square, area = side². So side² = 144, giving side = ±12. Since a length must be positive, the side length is 12 cm. A candidate who gives both square roots without rejecting the negative one, which cannot be a length, answers 12 cm or −12 cm. A candidate who halves 144 instead of taking its square root gets 72 cm. A candidate who divides 144 by 4, confusing the area formula with a perimeter calculation, gets 36 cm.
- (d) It diverges, growing rapidly without limit. — x₁ = 2³ − 2 = 8 − 2 = 6. x₂ = 6³ − 2 = 216 − 2 = 214. x₃ = 214³ − 2 = 9800344 − 2 = 9800342. The values 6, 214, 9800342, … grow far larger at every step, so the sequence diverges rather than settling anywhere. Checking whether the sequence converges to a fixed value near 2 fails, since the terms grow enormously instead of levelling off. Checking for a repeating pair of values also fails, since 6, 214 and 9800342 are all different, with no sign of a return to 6. x₀ = 2 is a fixed point only if 2³ − 2 = 2, but 2³ − 2 = 6, not 2, so the sequence does not stay constant.
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (a) 45 — The ratio between the two given points, one power of x apart, gives b: 405 ÷ 135 = 3, so b = 3. Substituting back, at x = 1, y = A × b, so 135 = A × 3, giving A = 45. Giving the common ratio b itself instead of A confuses which unknown was asked for and produces 3 — wrong, because the question asks for A, not b. Giving 135 instead treats the first given point as the y-intercept and reads A off it directly — wrong, because that point is at x = 1, not x = 0, so 135 is A × b, not A. Assuming A equals b⁰ = 1 by itself, rather than substituting a known point to solve for A, gives 1 — wrong, because b⁰ is always 1 regardless of A; A must be found using an actual (x, y) pair from the graph.
- (c) 64 m — The distance travelled is the area under the speed-time graph. From t = 0 to t = 4, the shape is a triangle with base 4 and height 8, area 1/2 × 4 × 8 = 16. From t = 4 to t = 10, the shape is a rectangle with base 6 and height 8, area 6 × 8 = 48. Total distance: 16 + 48 = 64 m. Treating the whole 10 seconds as a single trapezium with parallel sides 0 and 8 and width 10, instead of splitting it into the triangle and rectangle, gives 40 m. Ignoring the acceleration phase completely and assuming the car travels at a constant 8 m/s for all 10 seconds gives 8 × 10 = 80 m. Misreading the second interval as running from t = 4 to t = 8 instead of t = 4 to t = 10 gives a rectangle area of 4 × 8 = 32, plus the correct triangle of 16, totalling 48 m.
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (c) 10 m/s — A symmetric chord gradient uses the two points either side of t = 3: (2, 40) and (4, 60). The gradient is the change in height divided by the change in time: (60 − 40) ÷ (4 − 2) = 20 ÷ 2 = 10 m/s. Using only the values either side of one gap, (2, 40) and (3, 54), instead of the full symmetric chord, gives (54 − 40) ÷ (3 − 2) = 14 m/s. Getting the correct number but dropping the time unit, leaving only metres, gives 10 m. Dividing time by height instead of height by time inverts the calculation to (4 − 2) ÷ (60 − 40) = 0.1 s/m.
- (c) (3, 9) — Reflecting in the horizontal line y = 2 keeps the x-coordinate the same and maps y to 2 × 2 − y = 4 − (−5) = 9, so S = (3, 9). A candidate who uses k − y instead of 2k − y gets 2 − (−5) = 7, giving (3, 7). A candidate who reflects in the x-axis instead of the line y = 2, simply changing the sign of y, gets (3, 5). A candidate who also changes the sign of the x-coordinate, as if reflecting in both axes, gets (−3, 9).
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (a) 2.55 — x₁ = 20 ÷ (2 + 5) = 20 ÷ 7 = 2.857142857. x₂ = 20 ÷ (2.857142857 + 5) = 20 ÷ 7.857142857 = 2.545454545, which rounds to 2.55. Reporting x₁ instead of x₂ gives 2.857142857, which rounds to 2.86. Dropping the +5 in the denominator, using xₙ₊₁ = 20 ÷ xₙ, gives x₁ = 20 ÷ 2 = 10 and x₂ = 20 ÷ 10 = 2, which is 2.00. A sign error in the denominator, using xₙ₊₁ = 20 ÷ (xₙ − 5), gives x₁ = 20 ÷ (2 − 5) = −6.666666667 and x₂ = 20 ÷ (−6.666666667 − 5) = −1.714285714, which rounds to −1.71.
- (b) 25 — The tangent at (9, 12) is 9x + 12y = 225. Setting y = 0 (the x-axis): 9x = 225, so x = 25. Choosing 18.75 comes from swapping the coefficients in the tangent equation (using 12x + 9y = 225) before setting y = 0. Choosing 15 is where the circle itself meets the x-axis (from x² = 225), not where the tangent does. Choosing 9 is just the x-coordinate of the original point (9, 12), not the point P.
Build your own mix at the worksheet builder.