Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 130 — Method: substitute the total bill into the formula, then subtract the fixed charge and divide by the cost per text message. Working: 24.50 = 18 + 0.05t, so 0.05t = 24.50 − 18 = 6.50, t = 6.50 ÷ 0.05 = 130. Answer: 130 extra text messages. 490 comes from dividing the whole bill by 0.05 without first subtracting the £18 fixed charge: 24.50 ÷ 0.05 = 490. 13 comes from dividing the £6.50 by 0.5 instead of 0.05, moving the decimal point one place too far: 6.50 ÷ 0.5 = 13. 65 comes from dividing the £6.50 by 0.1 instead of 0.05.
- (d) An equation, true for one value of x — 2x + 5 = 17 is only true when x = 6, so it is an equation. A candidate who ignores the equals sign and focuses only on the x terms and numbers present picks the expression option. A candidate who sees an equals sign and assumes it must relate two different quantities, as a formula does, picks that option, missing that there is only one quantity, x, involved here. A candidate who wrongly checks whether both sides look similar in structure rather than testing specific values picks the identity option, missing that the two sides are not equal for every value of x.
- (d) 168 m — Split the area under the graph into two parts. The rising section (0 to 8 s) is a triangle: area = 0.5 × 8 × 12 = 48. The constant section, from 8 s to 18 s (10 s), is a rectangle: area = 12 × 10 = 120. Total distance = 48 + 120 = 168 m. Leaving out the 0.5 doubles the triangle, giving 8 × 12 + 120 = 216 m; ignoring the triangle section altogether gives only 120 m; averaging the start and final speeds over the whole 18 seconds, (0 + 12) ÷ 2 = 6, then 6 × 18 = 108 m, wrongly treats the tram as accelerating the whole time, when the graph is flat for the last 10 seconds.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (b) 25 — The tangent at (9, 12) is 9x + 12y = 225. Setting y = 0 (the x-axis): 9x = 225, so x = 25. Choosing 18.75 comes from swapping the coefficients in the tangent equation (using 12x + 9y = 225) before setting y = 0. Choosing 15 is where the circle itself meets the x-axis (from x² = 225), not where the tangent does. Choosing 9 is just the x-coordinate of the original point (9, 12), not the point P.
- (d) 110 — Method: form the equation 15 + 0.08m = 23.80, where m is the number of minutes, then solve for m. Working: subtract the fixed fee: 0.08m = 23.80 − 15 = 8.80. Divide by the cost per minute: m = 8.80 ÷ 0.08 = 110. Answer: 110 minutes. 1.1 comes from using 8 instead of 0.08 as the cost per minute, forgetting to convert pence to pounds. 297.5 comes from dividing the whole bill by the cost per minute without subtracting the fixed fee first, 23.80 ÷ 0.08. 485 comes from adding the fixed fee to the bill instead of subtracting it, before dividing by the cost per minute, (23.80 + 15) ÷ 0.08.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (c) x = 0 or x = 3 — Method: take out the common factor 5x: 5x(x − 3) = 0, so 5x = 0 or x − 3 = 0, giving x = 0 or x = 3. Distractor origins: x = 0 or x = 15 comes from forgetting to divide the second term by the common factor 5x correctly, leaving 15 instead of 3; x = 3 loses the solution x = 0 by dividing both sides by x; x = 5 or x = 3 mistakes the coefficient 5 itself for one of the solutions.
- (b) 3 — Method: a term is any part of an expression separated from the rest by a + or − sign, including a number on its own. Working: 8 − 3x + 5x² splits at the + and − signs into 8, −3x and 5x² — that is three separate terms. Answer: 3. Ryan's answer of 2 comes from wrongly excluding the number 8, thinking a term must contain a letter. 5 comes from miscounting by treating the coefficients and powers as separate terms as well as the letters. 1 comes from treating the whole expression as a single term because it is written without brackets.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (d) 12 — Since a₃ = a₂ + a₁, rearranging gives a₂ = a₃ − a₁ = 17 − 5 = 12. 22 comes from adding instead of subtracting: a₃ + a₁ = 17 + 5 = 22. 11 comes from treating the sequence as if it were arithmetic and averaging the two given terms: (5 + 17) ÷ 2 = 11 — but a Fibonacci-type sequence isn't arithmetic, so this doesn't apply. −12 comes from subtracting in the wrong order: a₁ − a₃ = 5 − 17 = −12.
- (a) 2.55 — x₁ = 20 ÷ (2 + 5) = 20 ÷ 7 = 2.857142857. x₂ = 20 ÷ (2.857142857 + 5) = 20 ÷ 7.857142857 = 2.545454545, which rounds to 2.55. Reporting x₁ instead of x₂ gives 2.857142857, which rounds to 2.86. Dropping the +5 in the denominator, using xₙ₊₁ = 20 ÷ xₙ, gives x₁ = 20 ÷ 2 = 10 and x₂ = 20 ÷ 10 = 2, which is 2.00. A sign error in the denominator, using xₙ₊₁ = 20 ÷ (xₙ − 5), gives x₁ = 20 ÷ (2 − 5) = −6.666666667 and x₂ = 20 ÷ (−6.666666667 − 5) = −1.714285714, which rounds to −1.71.
- (b) s = d / t — Method: undo the multiplication by t by dividing both sides by t. Working: d = st, so dividing both sides by t gives s = d / t. The value s = dt comes from multiplying by t instead of dividing. The value s = t / d comes from inverting the fraction, dividing t by d instead of d by t. The value s = d − t comes from subtracting t instead of dividing by it.
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
Build your own mix at the worksheet builder.