Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (c) 2.26 — Method: apply the formula repeatedly, keeping the whole display each time, and stop when two values in a row round to the same 2 decimal places; that shared rounded value is the solution to that accuracy. Working: x₁ = ∛(2 × 2 + 7) = ∛11 = 2.22398…; x₂ = ∛(2 × 2.22398… + 7) = ∛11.44796… = 2.25377…; x₃ = ∛11.50754… = 2.25767…; x₄ = ∛11.51534… = 2.25818…. Now x₃ and x₄ both round to 2.26, so the sequence has settled. Answer: 2.26. The distractors: 2.22 is x₁ rounded, quoted by a candidate who stops after one use of the formula; 2.25 is x₂ rounded, quoted by a candidate who stops as soon as two values look close instead of waiting until two consecutive values round to the same figure; 1.91 is ∛7, which comes from ignoring the 2x term and solving x³ = 7 instead.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (d) 2.7 — The height after 3 years of 10% compound growth is 2 × 1.1³ = 2.662 m, which rounds to 2.7 m. A candidate who adds 10% of the original height (0.2 m) in each of the 3 years, instead of compounding on the new height each time, would reach 2 + 3×0.2 = 2.6 m. A candidate who compounds for only 2 years would reach 2 × 1.1² = 2.42 m, rounding to 2.4 m. A candidate who compounds for 4 years instead of 3 would reach 2 × 1.1⁴ = 2.928 m, rounding to 2.9 m.
- (c) 10 m/s — A symmetric chord gradient uses the two points either side of t = 3: (2, 40) and (4, 60). The gradient is the change in height divided by the change in time: (60 − 40) ÷ (4 − 2) = 20 ÷ 2 = 10 m/s. Using only the values either side of one gap, (2, 40) and (3, 54), instead of the full symmetric chord, gives (54 − 40) ÷ (3 − 2) = 14 m/s. Getting the correct number but dropping the time unit, leaving only metres, gives 10 m. Dividing time by height instead of height by time inverts the calculation to (4 − 2) ÷ (60 − 40) = 0.1 s/m.
- (b) 58.8 km/h — Total distance = 100 + 47 = 147 km. Total time = 1.5 + 0.25 + 0.75 = 2.5 hours. Average speed = 147 ÷ 2.5 = 58.8 km/h. Leaving out the 0.25 hours of waiting from the total time gives 147 ÷ 2.25 = 65.3 km/h (1 d.p.) — wrong, because the train is stationary but time is still passing on the whole journey. Using only the first leg gives 100 ÷ 1.5 = 66.7 km/h (1 d.p.) — wrong, because it ignores the second leg of the journey entirely. Working out each leg's own speed (100 ÷ 1.5 = 66.7 km/h and 47 ÷ 0.75 = 62.7 km/h) and then averaging those two speeds gives 64.7 km/h (1 d.p.) — wrong, because the average of two speeds over DIFFERENT times is not the same as total distance divided by total time.
- (d) x = −2, y = −5 — 3x² + 12x + 7 rewrites as 3(x² + 4x) + 7, then as 3[(x + 2)² − 4] + 7, which simplifies to 3(x + 2)² − 5, since −3 × 4 + 7 = −5. Substituting x = −2: 3 × (−2)² = 12, 12 × (−2) = −24, so 12 − 24 + 7 = −5, confirming the minimum value −5 at x = −2: turning point x = −2, y = −5. Halving b instead of halving b/a — using −4 as the shift instead of −2 — lands on turning point x = −4, y = −41, which is wrong because when a ≠ 1 the shift inside the bracket is b/(2a), not b/a alone. Reading the bracket's sign directly as the turning point's x-coordinate gives x = 2, y = −5 — wrong, because (x + 2)² is zero at x = −2, not x = 2. Computing 12 − 7 = 5 instead of 7 − 12 = −5 flips the sign of the constant, giving x = −2, y = 5 — wrong, since the completed square's constant must be evaluated as 7 minus 12, not 12 minus 7. Whenever a ≠ 1, factor a out of the x² and x terms first, and always check a turning point by substituting back into the original equation.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (b) 12.7 m/s — Find the total distance from the area under the graph, then divide by the total time. Break the graph into its four straight sections: a triangle from (0, 0) to (5, 20), where 5 × 20 = 100 gives an area of 50 m when halved; a rectangle from (5, 20) to (12, 20), area 7 × 20 = 140 m; a trapezium from (12, 20) to (16, 4), where (20 + 4) × 4 = 96 gives an area of 48 m when halved; and a rectangle from (16, 4) to (20, 4), area 4 × 4 = 16 m — a total distance of 50 + 140 + 48 + 16 = 254 m. Dividing by the 20 seconds gives an average speed of 254 ÷ 20 = 12.7 m/s. Writing 15.1 m/s comes from forgetting to halve the trapezium area for the third section, using 96 instead of 48: a total of 302 m, and 302 ÷ 20 = 15.1 m/s. Writing 11.9 m/s comes from leaving out the final section, from (16, 4) to (20, 4), entirely: a total of 238 m, and 238 ÷ 20 = 11.9 m/s. Writing 12.1 m/s comes from dividing the correct total distance by 21 instead of 20 — a fencepost slip, counting the whole seconds from t = 0 to t = 20 inclusive as 21 seconds of travel rather than reading the journey as a duration of 20 seconds: 254 ÷ 21 = 12.1 m/s (1 d.p.).
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (d) 2 — The gradient between two points on a line is the change in y divided by the change in x. Using (5, 2) and (0, −8): (2 − (−8)) ÷ (5 − 0) = 10 ÷ 5 = 2. Inverting the fraction, dividing the change in x by the change in y instead, gives 5 ÷ 10 = 0.5. Reversing the order of the x-values in the denominator, giving (2 − (−8)) ÷ (0 − 5) = 10 ÷ (−5), gives −2. Misreading the y-intercept as 8 instead of −8, giving (2 − 8) ÷ 5 = −6 ÷ 5, gives −1.2.
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (d) 6.0 — Subtract 1.8 from both sides: 6.3x ≤ 38.2. Divide both sides by 6.3: x ≤ 6.0634… . The question asks for the greatest value to 1 decimal place that still satisfies the inequality. Testing 6.1: 6.3 × 6.1 + 1.8 = 40.23, which is more than 40, so 6.1 fails. Testing 6.0: 6.3 × 6.0 + 1.8 = 39.6, which is no more than 40, so 6.0 works and is the greatest such value. A candidate who simply rounds 6.0634… to 1 decimal place answers 6.1, without checking that it satisfies the inequality. A candidate who adds 1.8 instead of subtracting works out 41.8 ÷ 6.3 and answers 6.6. A candidate who forgets the 1.8 altogether divides 40 by 6.3 and answers 6.3.
- (c) 4 years — The yearly multiplier is 1 − 0.12 = 0.88. After 1 year: 2400 × 0.88 = 2112. After 2 years: 2112 × 0.88 = 1858.56. After 3 years: 1858.56 × 0.88 = 1635.5328. After 4 years: 1635.5328 × 0.88 = 1439.27 (2 d.p.), which is the first value below £1,500 — so it takes 4 complete years. Stopping after 3 years, where the value is still £1,635.53, above £1,500, gives 3 years — wrong, because the threshold has not been crossed yet at that point. Continuing for one year longer than needed gives 5 years — wrong, because the value has already fallen below £1,500 by year 4, so year 5 overcounts. Multiplying by the percentage itself instead of by the multiplier — using 0.12 in place of 0.88 — gives 2400 × 0.12 = £288 after a single year, apparently below £1,500 straight away, so 1 year — wrong, because 12% is the part lost each year, and the part left is 88%, so the multiplier is 0.88.
Build your own mix at the worksheet builder.