Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 44 m — The trapezium rule between t = 2 and t = 5 uses only the speeds at t = 2, 3, 4 and 5 — 12, 15, 16 and 14 — with three strips of width 1: adding the first and last readings and twice the sum of the middle readings gives 12 + 14 + 2 × (15 + 16) = 88, and half of that is 44 m. Writing 68.5 m comes from applying the trapezium rule to the whole table, from t = 0 to t = 6, instead of restricting it to the interval t = 2 to t = 5 that the question asks for. Writing 28.5 m comes from forgetting to double the two middle readings, 15 and 16, in the trapezium rule formula. Writing 39 m comes from averaging only the first and last speeds in the interval, 12 and 14, and multiplying by the 3-second interval, ignoring the readings at t = 3 and t = 4 in between.
- (a) 2.55 — x₁ = 20 ÷ (2 + 5) = 20 ÷ 7 = 2.857142857. x₂ = 20 ÷ (2.857142857 + 5) = 20 ÷ 7.857142857 = 2.545454545, which rounds to 2.55. Reporting x₁ instead of x₂ gives 2.857142857, which rounds to 2.86. Dropping the +5 in the denominator, using xₙ₊₁ = 20 ÷ xₙ, gives x₁ = 20 ÷ 2 = 10 and x₂ = 20 ÷ 10 = 2, which is 2.00. A sign error in the denominator, using xₙ₊₁ = 20 ÷ (xₙ − 5), gives x₁ = 20 ÷ (2 − 5) = −6.666666667 and x₂ = 20 ÷ (−6.666666667 − 5) = −1.714285714, which rounds to −1.71.
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (c) x = −2 or x = 4 — The solutions of x² − 2x − 8 = 0 are the x-values where y = 0. From the table, y = 0 when x = −2 and when x = 4, so those are the two solutions. Distractor origins: x = −1 or x = 3 picks the pair of x-values that give equal (but non-zero) y-values instead of y = 0; x = 0 or x = −8 mixes up an x-value with its corresponding y-value; x = −2 only reads off one of the two roots and misses the other.
- (a) £14.50 — Method: the first 200 minutes are already covered by the £12, so only 250 − 200 = 50 minutes are charged extra. Extra charge = 50 × £0.05 = £2.50. Total cost = £12 + £2.50 = £14.50. Distractor origins: £24.50 charges 5p for all 250 minutes instead of only the 50 minutes over 200 (250 × £0.05 = £12.50, plus £12 = £24.50); £12.50 makes that same slip of charging all 250 minutes but then forgets to add the £12 monthly fee; £13.50 works out 250 − 200 wrongly as 30 extra minutes instead of 50 (30 × £0.05 = £1.50, plus £12 = £13.50).
- (a) t = 0 or t = 4 — The ball is at ground level exactly when h = 0. From the table, h = 0 at t = 0 and at t = 4, so those are the two times. Distractor origins: t = 1 or t = 3 picks the times with equal (but non-zero) height instead of ground level; t = 2 picks the time of maximum height instead of ground level; t = 0 finds only the starting time and misses the second one.
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (a) 45 — The ratio between the two given points, one power of x apart, gives b: 405 ÷ 135 = 3, so b = 3. Substituting back, at x = 1, y = A × b, so 135 = A × 3, giving A = 45. Giving the common ratio b itself instead of A confuses which unknown was asked for and produces 3 — wrong, because the question asks for A, not b. Giving 135 instead treats the first given point as the y-intercept and reads A off it directly — wrong, because that point is at x = 1, not x = 0, so 135 is A × b, not A. Assuming A equals b⁰ = 1 by itself, rather than substituting a known point to solve for A, gives 1 — wrong, because b⁰ is always 1 regardless of A; A must be found using an actual (x, y) pair from the graph.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (a) 7.9 m — Method: the iteration converges on the width of the plot, so run the formula three times from the starting value and then add 4 m, because the length is 4 m greater than the width. Working: x₁ = √(30 − 4 × 3) = √18 = 4.24264…; x₂ = √(30 − 4 × 4.24264…) = √13.02943… = 3.60963…; x₃ = √(30 − 4 × 3.60963…) = √15.56147… = 3.94480…. The estimate for the length is 3.94480… + 4 = 7.94480…, which is 7.9 m correct to 1 decimal place. Answer: 7.9 m. The iteration is still oscillating at x₃, so this is the estimate that three uses of the formula give, not a settled value. The distractors: 3.9 m is x₃ itself, the width, given by a candidate who runs the iteration correctly and then stops before the step the question actually asks for; 7.6 m uses x₂ in place of x₃, one use of the formula short, and then adds the 4 m correctly; 15.8 m multiplies the width by 4 instead of adding 4 m to it, reading greater than as a multiplier.
- (c) 3.153 — x₁ = √(4 × 1 + 1) = √5 = 2.236067977. x₂ = √(4 × 2.236067977 + 1) = √9.944271908 = 3.153453965, which rounds to 3.153. Reporting x₁ instead of x₂ gives 2.236067977, which rounds to 2.236. A sign error inside the root, using xₙ₊₁ = √(4xₙ − 1) instead of √(4xₙ + 1), gives x₁ = √3 = 1.732050808 and x₂ = √(4 × 1.732050808 − 1) = √5.928203232 = 2.434790182, which rounds to 2.435. Applying the formula in the wrong order, working out √(4xₙ) + 1 at every step instead of √(4xₙ + 1), gives x₁ = √4 + 1 = 3 and x₂ = √(4 × 3) + 1 = 4.464101615, which rounds to 4.464.
- (c) The sequence diverges, moving away from x = 3 — Starting from x₀ = 2.9: x₁ = 2.9² − 6 = 2.41, x₂ = 2.41² − 6 = −0.19, x₃ = (−0.19)² − 6 = −5.96, x₄ = (−5.96)² − 6 = 29.56 — the values swing away from 3 and grow rapidly, so the sequence diverges rather than settling anywhere. Choosing 'settles towards x = 3' assumes that starting close to a root is enough for a rearrangement to converge to it, which is not always true — this rearrangement changes values too steeply near x = 3 to stay there. Choosing 'settles towards x = −2' assumes a diverging sequence must eventually land on the other root; instead it runs away to increasingly large values. Choosing 'stays constant at 2.9' ignores that applying the formula changes the value at every step.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (d) x = −4, y = −19 — x² + 8x − 3 = (x + 4)² − 4² − 3 = (x + 4)² − 19. Substituting x = −4: (−4)² = 16, 8 × (−4) = −32, so 16 − 32 − 3 = −19, confirming the minimum value −19 at x = −4: turning point (−4, −19). Using 8 instead of half of it inside the bracket gives (x + 8)² − 67, turning point (−8, −67) — wrong, because only half the coefficient of x belongs inside the bracket. Reading the bracket's sign directly as the turning point's x-coordinate gives (4, −19) — wrong, because (x + 4)² is zero at x = −4, not x = 4. Computing 16 + 3 = 19 instead of −3 − 16 = −19 flips the sign of the constant, giving (−4, 19) — wrong, since the completed square's constant must be evaluated as −3 minus 16, not 16 plus 3. Check by substitution whenever the sign of a constant feels uncertain.
- (d) x + y = 7 — The midpoint of AB is (−1 + 5)/2, (2 + 8)/2, which is (2, 5). The gradient of AB is (8 − 2)/(5 − (−1)) = 6/6 = 1. The perpendicular bisector has gradient −1 and passes through (2, 5): y − 5 = −(x − 2), which rearranges to x + y = 7. Distractor routes: x − y = −3 uses the gradient of AB itself, 1, rather than its negative reciprocal, giving a line PARALLEL to AB through the midpoint instead of perpendicular to it. x + y = 12 comes from adding the y-coordinates, 2 + 8 = 10, but forgetting to divide by 2, using the midpoint (2, 10) instead of (2, 5). x + y = 4 comes from using A's x-coordinate, −1, directly instead of averaging it with B's, giving the point (−1, 5) instead of the true midpoint (2, 5).
Build your own mix at the worksheet builder.