Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) Fastest at t = 2 min — steepest gradient. — The rate of cooling is given by the size (magnitude) of the gradient, ignoring its sign — the steeper the tangent, the faster the temperature is changing. Of −8, −3 and −0.5, the gradient −8 has the greatest magnitude, so the tea is cooling fastest at t = 2 minutes. 'Fastest at t = 20 min — largest gradient' confuses the signed value with the size of the rate: −0.5 is the largest NUMBER of the three, but it's the smallest in magnitude, meaning the tea is barely cooling at all by then. 'Cools at the same rate throughout' ignores that the three gradients are different sizes, not just all negative. 'Fastest at t = 10 min — the middle reading' isn't a mathematical reason at all — the gradients themselves have to be compared, not their position in the list.
- (d) 680 m — First find how long the acceleration takes: acceleration = change in speed ÷ time, so 2.5 = 20 ÷ t, giving t = 20 ÷ 2.5 = 8 seconds. The distance during this phase is the area of a triangle with base 8 and height 20: 1/2 × 8 × 20 = 80 m. The distance during the constant-speed phase is 20 × 30 = 600 m, since distance = speed × time at a constant speed. The total distance is 80 + 600 = 680 m. Using the given 30 seconds for the acceleration phase as well, 1/2 × 30 × 20 = 300, plus the correct 600, gives 900 m — but 30 seconds is only stated for the constant-speed phase. Leaving out the 1/2 and using the full rectangle for the acceleration phase, 8 × 20 = 160, plus the correct 600, gives 760 m — the speed is not constant during acceleration, so this area is a triangle, not a rectangle. Swapping the two times round, and using 8 seconds for the constant-speed distance instead of 30, 20 × 8 = 160, plus the correct triangle area of 80, gives 240 m.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (b) 4.39 — x₁ = ∛(150 − 3 × 4²) = ∛(150 − 48) = ∛102 = 4.672 (unrounded). x₂ = ∛(150 − 3 × 4.672²) = ∛(150 − 65.49) = ∛84.51 = 4.39 (2 d.p.). Choosing 4.67 stops after only one iteration, giving x₁ instead of x₂. Choosing 84.51 finds the value inside the cube root for x₂ but never takes the cube root. Choosing 6.32 comes from adding 3xₙ² instead of subtracting it inside the root, which does not match the given formula.
- (c) 14.1 — Method: in x² + y² = r² the right-hand side is the square of the radius, so take its square root to find the radius, then double the radius because the diameter is twice the radius. Working: r² = 50, so r = √50 = 7.07106…, and the diameter is 2 × 7.07106… = 14.14213…, which is 14.1 correct to 1 decimal place. Answer: 14.1. The distractors: 7.1 is the radius, worked out correctly but never doubled, so it answers a question about the radius rather than the diameter; 100.0 comes from doubling the 50 on the right-hand side, treating r² as though it were already the radius; 25.0 comes from halving the 50, treating r² as though it were already the diameter.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (a) Subtracting 4x gives 3 = 10, which is never true. — Method: try to solve the equation as normal and see what happens. Working: subtract 4x from both sides: 4x + 3 − 4x = 4x + 10 − 4x, giving 3 = 10. This statement is false for every value of x, so the equation has no solution. Answer: subtracting 4x gives 3 = 10, which is never true. "x would have to be negative" invents a constraint on x that the equation never states. "It's true for every x" confuses this equation with an identity, where both sides would simplify to the same expression. "x = 7" misreads the false statement 3 = 10 as something to solve for x, rather than recognising it means no solution exists.
- (c) 50 — Method: the edge of the track is a circle centred on the origin, so it has equation x² + y² = r²; use the floodlight whose coordinates are given to find r², then substitute x = 0 to find where that circle meets the positive y-axis. Working: 30² + 40² = 900 + 1600 = 2500, so the edge of the track is x² + y² = 2500. Substituting x = 0 gives k² = 2500, so k = √2500 = 50, taking the positive root because k is positive. Answer: k = 50. The distractors: 2500 is r² used as though it were the radius, which would place the second floodlight fifty times too far from the centre; 70 adds the two coordinates, 30 + 40, instead of adding their squares; 40 takes the y-coordinate of the first floodlight to be the radius, which would only be true if that floodlight stood on the y-axis itself.
- (c) £2.80 — 3n + 1.50 = 9.90, so 3n = 8.40 and n = 2.80, so each notebook costs £2.80. A candidate who forgets to subtract the cost of the pen and divides the total by 3 gets n = 9.90 ÷ 3 = £3.30. A candidate who adds the cost of the pen instead of subtracting it gets 3n = 11.40 and n = £3.80. A candidate who treats the pen as a fourth notebook and divides the total by 4 gets n = 9.90 ÷ 4 = £2.48 (2 d.p.).
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (c) 19 — Method: set up the equation 15 + 9n = 186, then subtract the deposit and divide by the cost per student. Working: 9n = 186 − 15 = 171; n = 171 ÷ 9 = 19. Answer: 19 students. 20.67 comes from dividing the whole £186 by £9 without first subtracting the deposit: 186 ÷ 9 ≈ 20.67. 11.8 comes from swapping the two amounts round, subtracting £9 and dividing by £15: (186 − 9) ÷ 15 = 11.8. 22.33 comes from adding the deposit instead of subtracting it: (186 + 15) ÷ 9 ≈ 22.33.
- (a) 12 — Method: write both ages as they were six years ago, call Leo's present age x, and form an equation from the comparison at that time. Working: six years ago Harry was 24 − 6 = 18 and Leo was x − 6, so 18 = 3(x − 6); expanding gives 18 = 3x − 18, adding 18 to both sides gives 36 = 3x, and dividing by 3 gives x = 12. Checking: six years ago Harry was 18 and Leo was 6, and 18 = 3 × 6. Answer: 12. The distractors: 6 comes from solving 18 = 3(x − 6) as far as Leo's age six years ago, 18 ÷ 3 = 6, and giving that as his age now; 8 comes from dividing Harry's present age by 3, 24 ÷ 3 = 8, using the multiple at the wrong moment in time; 36 comes from stopping at 3x = 36 and giving 36 as Leo's age.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
Build your own mix at the worksheet builder.