Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 10 m/s — A symmetric chord gradient uses the two points either side of t = 3: (2, 40) and (4, 60). The gradient is the change in height divided by the change in time: (60 − 40) ÷ (4 − 2) = 20 ÷ 2 = 10 m/s. Using only the values either side of one gap, (2, 40) and (3, 54), instead of the full symmetric chord, gives (54 − 40) ÷ (3 − 2) = 14 m/s. Getting the correct number but dropping the time unit, leaving only metres, gives 10 m. Dividing time by height instead of height by time inverts the calculation to (4 − 2) ÷ (60 − 40) = 0.1 s/m.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (c) 22 — p² means p × p. Substitute p = 2.5: p² = 6.25, so 4p² = 4 × 6.25 = 25, and 25 − 3 = 22. 97 comes from squaring 4p together instead of just p, (4 × 2.5)² − 3 = 10² − 3 = 97. 7 comes from using p instead of p², 4 × 2.5 − 3. 1 comes from squaring the 3 instead of the p, 4 × 2.5 − 3².
- (d) x = 4 or x = −4 — Method: divide both sides by 2 to get x² = 16, then take the square root of both sides: x = 4 or x = −4. Distractor origins: x = 4 forgets the negative root; x = 8 comes from halving 16 instead of taking its square root; x = 16 stops at x² = 16 without ever taking the square root.
- (a) 23 — The number of logs increases by 4 for each layer down, starting from 3 in the top layer, so the nth layer has 3+(n−1)×4 logs. For the 6th layer: 3+5×4=3+20=23. A candidate who adds the difference of 4 six times instead of five, treating the top layer as needing an addition too, would compute 3+6×4=27. A candidate who uses 4n instead of 4n−1, omitting the adjustment for the first layer, would compute 4×6=24. A candidate who subtracts the common difference, 4, instead of 1 when adjusting the multiplier would compute 4×6−4=20.
- (a) 5.8 — The horizontal distance is 3 and the vertical distance is 5, so using Pythagoras' theorem the distance is √(3² + 5²) = √34 = 5.8 (1 d.p.). A candidate who adds the two differences instead of using Pythagoras gets 3 + 5 = 8.0. A candidate who works out 3² + 5² = 34 but forgets to take the square root gets 34.0. A candidate who subtracts the squares instead of adding them gets √(5² − 3²) = √16 = 4.0.
- (b) 12.7 m/s — Find the total distance from the area under the graph, then divide by the total time. Break the graph into its four straight sections: a triangle from (0, 0) to (5, 20), where 5 × 20 = 100 gives an area of 50 m when halved; a rectangle from (5, 20) to (12, 20), area 7 × 20 = 140 m; a trapezium from (12, 20) to (16, 4), where (20 + 4) × 4 = 96 gives an area of 48 m when halved; and a rectangle from (16, 4) to (20, 4), area 4 × 4 = 16 m — a total distance of 50 + 140 + 48 + 16 = 254 m. Dividing by the 20 seconds gives an average speed of 254 ÷ 20 = 12.7 m/s. Writing 15.1 m/s comes from forgetting to halve the trapezium area for the third section, using 96 instead of 48: a total of 302 m, and 302 ÷ 20 = 15.1 m/s. Writing 11.9 m/s comes from leaving out the final section, from (16, 4) to (20, 4), entirely: a total of 238 m, and 238 ÷ 20 = 11.9 m/s. Writing 12.1 m/s comes from dividing the correct total distance by 21 instead of 20 — a fencepost slip, counting the whole seconds from t = 0 to t = 20 inclusive as 21 seconds of travel rather than reading the journey as a duration of 20 seconds: 254 ÷ 21 = 12.1 m/s (1 d.p.).
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (d) It has a solution between x = 2.2 and x = 2.3 — Since f(2.2) is negative and f(2.3) is positive, the graph of f crosses the x-axis somewhere between x = 2.2 and x = 2.3, so the equation has a solution in that interval. Choosing 'between x = −2.2 and x = −2.3' confuses the negative f-VALUE at 2.2 with a negative x-value. Choosing 'no solution' misreads a change of sign as meaning the opposite of what it shows. Choosing 'exactly two solutions' assumes a single change of sign must give two roots, which is not what the rule guarantees.
- (d) 2 — The gradient between two points on a line is the change in y divided by the change in x. Using (5, 2) and (0, −8): (2 − (−8)) ÷ (5 − 0) = 10 ÷ 5 = 2. Inverting the fraction, dividing the change in x by the change in y instead, gives 5 ÷ 10 = 0.5. Reversing the order of the x-values in the denominator, giving (2 − (−8)) ÷ (0 − 5) = 10 ÷ (−5), gives −2. Misreading the y-intercept as 8 instead of −8, giving (2 − 8) ÷ 5 = −6 ÷ 5, gives −1.2.
- (a) Overestimates — trapezium edges lie above the curve. — For a concave-up curve, each chord connecting two points on the curve lies ABOVE the curve between those points, because the curve bends away from the chord underneath it. The trapezium rule uses these chords as the top edges of each trapezium, so the trapeziums cover a larger region than the true area under the curve — the estimate is an overestimate. Saying it underestimates because the edges lie below the curve gets the direction backwards: for a concave-up curve the edges lie above, not below. Saying it overestimates 'because more strips always increase it' gives the right verdict for the wrong reason — using MORE, narrower strips makes a trapezium estimate more accurate and brings it closer to the true area, it does not simply increase the total. Saying the estimate is exact ignores that straight edges cannot follow a curved line perfectly; there is always a gap between the chord and the curve on a bend, which is exactly what makes the rule an estimate rather than an exact calculation.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (b) 6 — 3n + 4.5 = 22.5, so 3n = 18 and n = 6. A candidate who divides 22.5 by 3 first and ignores the 4.5 gets n = 7.5. A candidate who makes a sign error and forms the equation 3n − 4.5 = 22.5 gets 3n = 27 and n = 9. A candidate who divides by 3 before subtracting the 4.5, working out 22.5 ÷ 3 + 4.5, gets n = 12.
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
Build your own mix at the worksheet builder.